Information based on query as of Tuesday, May 14, 2024.
Permit Information
Permit NumberESC18-00900
StatusIssued
Name JOHN JR LAUDE
Site Address 6300 S COLE RD
Project NameBarnwood Subdivsion phase 1
Customer Number 
ePlanReviewNo
Description
New residential subdivision construction including grading and installation of utilities. BMP installation and ESC site preparation inspection REQUIRED prior to significant earth disturbance. Silt fence perimeter to be installed along NY Canal at grading limits. Construction entrnace, fugitive dust control plan, and protection of new storm drain facility after installation. Preserve existing vegetation as much as possible.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection7/27/20207/27/20207/27/2020 PASS
DetailsMichael Zawacki
Southern half is bare and has stockpiles.
Northern half has paved roads, curbing, and sidewalk.
ne crew working on nw corner, have water truck, no issues.
General Inspection6/25/20206/25/20207/1/2020 PASS
DetailsAndy J. Long
WIP paving roads. NO fugitive dust or trackout observed. No corrections requested at this time.
General Inspection5/25/20205/25/20205/27/2020 PASS
DetailsMichael Zawacki
Western phase is all graded, east section starting to get weed coverage. Stockpiles on south of site. Water truck on site. SOme activity, no street or curbing work has begun.
General Inspection4/24/20204/24/20204/24/2020 PASS
DetailsAndy J. Long
General Inspection3/24/20203/24/20203/24/2020PPASS
DetailsMichael Zawacki
No new site activity. One worker from track utilities on site.
General Inspection2/24/20202/24/20202/24/2020 PASS
DetailsMichael Zawacki
Stripping has begun on south end. Some stockpiles. Road has been cut going far south. No machinery or workers at site.
General Inspection1/23/20201/23/20201/23/2020PPASS
DetailsMichael Zawacki
No activity, surveyor on site. Some tracking onto lake hazel on north side, coming from gates going to ag land and not construction site.
General Inspection1/13/20201/13/20201/14/2020 CANC
DetailsMichael Zawacki
General Inspection12/13/201912/13/201912/17/2019PPASS
DetailsAndy J. Long
No significant trackout. Some minor site work occuring. Will soon be shut down for winter. No corrections at this time.
Tracking Control11/20/201911/20/201911/20/2019PFAIL
DetailsMichael Zawacki
Lots of dirt along curbing and some light trackout.
Message sent to John Laude.
General Inspection11/1/201911/1/201911/6/2019PPART
DetailsMichael Zawacki
Trucks running laps hauling fill. Some tracking aT BOTH ENTRANCES.
General Inspection10/14/201910/14/201910/16/2019PPASS
DetailsMichael Zawacki
Work is getting near north east corner, water truck running on site. No dust in work area, truck kicked up cloud going towards exit, water truck sprayed area after dust cloud. Very little trackout.
General Inspection9/23/20199/23/20199/24/2019 PART
DetailsMichael Zawacki
Work on water and sewer line install.
Water truck on site. People exiting on western side where there is no stabalized entrance. Some dirt on road apron.
Tracking Control8/21/20198/21/20198/23/2019PPART
DetailsAndy J. Long
Construction entrance was maintained, but there is a lot of loose sand, sediment, and gravel in the shoulder along the Lake Hazel frontage of the site.

Request to have shoulder swept next week. Much of it is from Knife River water truck going between Barnwood (trilogy) and Baserri (hayden homes).
Complaint Inspection8/19/20198/19/20198/19/2019PFAIL
DetailsAndy J. Long
Corrections needed:

- sweep Lake Hazel Rd. between site and Cole
- improve and lengthen construction entrance
- water the site at the end of each day to "crust" down loose dirt on access roads to limit wind blown dust.
General Inspection8/13/20198/13/20198/13/2019 PART
DetailsMichael Zawacki
Doing sewer and water lines, water truck on site. Some trackout, road will need to be swept end of day.
General Inspection7/11/20197/11/20197/11/2019PPASS
DetailsMichael Zawacki
Giant trencher on site. Some dust from work on far south of site. SOme dirt on road apron, no trackout onto road.
General Inspection6/17/20196/17/20196/17/2019PPASS
DetailsAndy J. Long
WIP on infrastructure/utlity installed. Construction entrance installed. No fugitive dust plumes observed. Site staying within clearing limits.
General Inspection6/6/20196/6/20196/6/2019PPASS
DetailsMichael Zawacki
Site work in progress. Water truck on site. Only one excavator active.
General Inspection5/9/20195/9/20195/9/2019PPASS
DetailsMichael Zawacki
Blasting completed. Some grading and hauling on site. Lots of dust, area is surrounded by open desert. No trackout. Pipe is staged by east entrance.
General Inspection4/22/20194/22/20194/22/2019PPASS
DetailsMichael Zawacki
Superior blasting currently on site. Pipe staged and will begin after all blasting completed.
Site Preparation4/22/20194/22/20194/22/2019PCANC
DetailsAndy J. Long
General Inspection3/21/20193/21/20193/21/2019PPASS
DetailsMichael Zawacki
Drill rigs on site, no site grading or dirt moving.
Syman is doing ESC inspections for site.
No issues, no dust.
General Inspection1/17/20191/17/20191/17/2019PPASS
DetailsMichael Zawacki
No workers on site. Area is graded, some stockpiles on site.
General Inspection1/9/20191/10/20191/10/2019PFAIL
DetailsAndy J. Long
Corrections needed:

- clean up paved apron to construction entrance
- uncompact the rock in the entrance
- add more rock w/ lining to increase the length of the entrance.

Correction request left on RP John's voicemail

- possible work occuring on the parcel across the street.
General Inspection12/17/201812/17/201812/17/2018PPART
DetailsAndy J. Long
Notified RP of notice from Syman that SWPPP is not complete. He was not aware of the issue,.

Site is currently inactive. Correction request to John to clean up trackout into the road apron on the east entrance.
General Inspection11/21/201811/21/201811/21/2018PPASS
DetailsMichael Zawacki
Site is rough graded. No current activity and most machines are gone. Lots of light soil that looks like ash, may blow if windy. No ESC issues.
General Inspection10/18/201810/18/201810/18/2018PPASS
DetailsMichael Zawacki
No activity at site during inspection, area is rough graded. Syman is doing site inspections.
General Inspection10/2/201810/2/201810/2/2018PPASS
DetailsMichael Zawacki
Graders running on site, some dust, water wagon spraying site. East entrance has stabalized rock. Site is in a depression, no run off concern.
General Inspection9/18/20189/18/20189/19/2018PPASS
DetailsMichael Zawacki
Graders and water wagons working on south side of property. No blowing dust. Crushed rock exit installed, no trackout. Very windy at time of inspection.
General Inspection8/21/20188/29/20188/29/2018APASS
DetailsMichael Zawacki
Work hasn't begun. silt fence along perimeter of lake hazel.
Site Preparation8/20/20188/21/20188/21/2018APASS
DetailsAndy J. Long
check out site location and potential BMPs. Few physical BMPs on ESC site plan. Project should start late this week or next week.


ESC permit sign and SWPPP are posted. Entrance is just east of the NY Canal at Lake Hazel @ Cole. Initial BMPs installed.

Reviewed fugitive dust control requirements with RP.

Approved for construction.