Permit Information
Permit NumberESC18-01071
StatusFinaled
Name STEVE SEARS
Site Address 6405 E COLUMBIA RD
Project NameRUSH VALLEY sub No. 1
Customer Number 
ePlanReviewNo
Description
Subivision development (utilities & infrastructure) in desert area of SW Boise, Columbia. Access will off S. Oregon Ridge to avoid construction traffic in Sunny Ridge Subdivision. BMPs inlcude preserving perimeter vegetation around clearing limits, construction entrance, dust control & suppresion, concrete washout and other pollution prevention BMPs. Unnamed intermittent stream passes through site. Permit and SWPPP to be posted at south end of Snow Bird. CGP eNOI # IDR10016R
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Aging Inspection6/8/20206/8/20206/12/2020 CANC
DetailsAndy J. Long
Site Final6/12/20206/12/20206/12/2020PPASS
DetailsAndy J. Long
Rush Valley phase 1 development complete. Homes in progress by CBH, each SFH permitted seperately.

No ESC requests. Next phases are now in progress under ESC20-00873
General Inspection4/7/20204/7/20204/7/2020PPASS
DetailsMichael Zawacki
Stripping has begun on new phase west of Zaffre Ridge.
WIP in NW. No current excavation or foundation work. Few bare pads, mostly all homes framed and work on interior.
Large lined washout at rear of site. Some boot tracking on roads, all vehicles parked on street.
General Inspection3/16/20203/16/20203/16/2020PPASS
DetailsMichael Zawacki
Home construction has begun in NE corner. No current issues, washout at end of road. Workers parked on street, no blown trash.
General Inspection2/14/20202/14/20202/14/2020PPASS
DetailsMichael Zawacki
No home activity.
Aging Inspection1/7/20201/7/20201/7/2020 PASS
DetailsMichael Zawacki
No new activity since last inspection.
General Inspection11/7/201911/7/201911/7/2019PPASS
DetailsMichael Zawacki
No workers on site.
Talked with neighbor while on site, were working on retention pond yestrerday on south east end.
Roads, sidewalks, storm drains, and fences installed.
General Inspection10/7/201910/7/201910/7/2019PPASS
DetailsAndy J. Long
WIP installing fences and landscaping/irrigation. No corrections requested.
General Inspection9/9/20199/9/20199/9/2019 CANC
DetailsMichael Zawacki
General Inspection7/10/20197/10/20197/10/2019PPASS
DetailsMichael Zawacki
No new activity. Sidewalk and curbing completed, no building activity.
General Inspection7/2/20197/2/20197/2/2019PPASS
DetailsMichael Zawacki
Streets look swept. No blowing trash. Few homes remain.
General Inspection6/17/20196/17/20196/17/2019PPASS
DetailsMichael Zawacki
No current activity. Road and sidewalk bed laid out, water lines installed.
General Inspection4/15/20194/15/20194/15/2019PPASS
DetailsMichael Zawacki
No new activity at site, no workers on site.
Site is prepped for future roads and sidewalks. No infrastructure started.
General Inspection3/12/20193/13/20193/15/2019PCANC
DetailsAndy J. Long
General Inspection3/7/20193/8/20193/12/2019ACANC
DetailsAndy J. Long
General Inspection1/8/20191/8/20191/8/2019PPASS
DetailsAndy J. Long
No activity at time of inspection. Roads have been cut and sewer installed. Need to get paving, curb, and sidewalks. No trackout from site, no loose trash. Permit and SWPPP info posted at end of Snow Bird.
General Inspection10/11/201810/11/201810/11/2018PCANC
DetailsAndy J. Long
data entry error
General Inspection10/11/201810/11/201810/11/2018PPASS
DetailsAndy J. Long
WIP installing utilities. No trackout, workers parking on pavement, machinery and equipment is stored within the site.
General Inspection9/21/20189/21/20189/21/2018PPASS
DetailsMichael Zawacki
no new activity.
General Inspection9/5/20189/5/20189/5/2018PPASS
DetailsMichael Zawacki
Area is clean. Concrete washout will need a stabalized entrance, is located in back of lot. No home work yet.
General Inspection8/10/20188/14/20188/14/2018APASS
DetailsMichael Zawacki
Road has been swept.
Random Inspection8/10/20188/10/20188/10/2018PFAIL
DetailsAndy J. Long
Trackout onto Oregon Ridge still present so will need another sweeping. Wind blown and equipment generated dust. Two water trucks on site, but not operating at time of inspection.

Will need to stabilize the access road used to get to the site.
General Inspection8/2/20188/6/20188/6/2018PFAIL
DetailsAndy J. Long
Correction request:

- sweep Oregon Ridge street (before Tuesday)
- water truck should operate at all times during grading activity. Two water trucks were onsite, on re-filling and one was being serviced so there was no dust control at time of inspection.
- Water down site access route as well as construction site. Very thick dust when water truck leaves the site.
- Suez will not let L3 fill their onsite tank is also part of the problem at the site.
General Inspection8/2/20188/3/20188/2/2018ACANC
DetailsAndy J. Long