Site Final | 6/11/2020 | 6/12/2020 | 6/12/2020 | P | PASS |
Andy J. Long
|
|
|
Work complete. No ESC requests. Temp BMPs in sub to remain for active construction
|
General Inspection | 6/10/2020 | 6/10/2020 | 6/11/2020 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
General Inspection | 5/26/2020 | 5/26/2020 | 5/26/2020 | | PASS |
Michael Zawacki
|
|
|
Site had seperated pool permit that has been closed. Revegetation in progress, no issues at site.
|
General Inspection | 5/8/2020 | 5/8/2020 | 5/11/2020 | | PASS |
Michael Zawacki
|
|
|
Landscaping completed and site hydroseeded. wILL CONTINUE TO MONITOR.
|
General Inspection | 4/23/2020 | 4/23/2020 | 4/23/2020 | | PASS |
Michael Zawacki
|
|
|
Landscapers on site, some materials stored on road. No runoff or trash in drainage channel.
|
General Inspection | 4/8/2020 | 4/8/2020 | 4/13/2020 | | PASS |
Michael Zawacki
|
|
|
Trash guy on site loading up truck. Mini excavator getting site prepped for landscaping. Workers are on interior of home.
|
General Inspection | 3/20/2020 | 3/20/2020 | 3/20/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/4/2020 | 3/4/2020 | 3/5/2020 | | PASS |
Michael Zawacki
|
|
|
Crew on site setting form for reating walls and wall along driveway. Site is clean, drainage channel has had trash picked up.
|
BMP Violation | 2/11/2020 | 2/18/2020 | 2/18/2020 | A | PASS |
Michael Zawacki
|
|
|
On site cleaning up drywall. Has excavator scheduled this week for retaining wall and lot prep for landscaping.
|
General Inspection | 2/7/2020 | 2/11/2020 | 2/11/2020 | P | FAIL |
Michael Zawacki
|
|
|
Message sent to RP and follow up scheduled. Silt fence needs repair and trash cleanup. Rilling coming onto site from lot above, talked to that RP. Needs to clean paint/drywall washout.
|
General Inspection | 2/6/2020 | 2/6/2020 | 2/7/2020 | | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 1/22/2020 | 1/22/2020 | 1/22/2020 | | PASS |
Michael Zawacki
|
|
|
Wip on stucco and interior. Some windblown trash being cleaned up, majority was from home above.
|
General Inspection | 1/2/2020 | 1/2/2020 | 1/2/2020 | | PASS |
Michael Zawacki
|
|
|
Workers parked on street, work is on interior. No runoff from rain event, washout still has room.
|
General Inspection | 12/12/2019 | 12/12/2019 | 12/13/2019 | | PASS |
Michael Zawacki
|
|
|
No workers on site. Footings for retaining wall poured, forms for wall in place, lined washout at site. Walls are up at home. Drainage in rear is protected, rock entrance on lot, no tracking.
|
General Inspection | 9/26/2019 | 9/26/2019 | 9/26/2019 | P | PASS |
Michael Zawacki
|
|
|
Met with project manager on site. Some windblown trash they will get cleaned. Nice lined washout on site. Long grade on site needs to be watched during rain events.
|
General Inspection | 7/16/2019 | 8/6/2019 | 8/8/2019 | P | FAIL |
Michael Zawacki
|
|
|
Met with Ken the foreman on site. Foundation workers overflowed washout and did some washing oit onto lot. He is cleaning it up and having main washout picked up.
|
General Inspection | 7/15/2019 | 7/16/2019 | 7/16/2019 | P | PASS |
Andy J. Long
|
|
|
WIP on foundation. No trackout, permit posted BMPs installed.
|
General Inspection | 5/29/2019 | 5/29/2019 | 5/29/2019 | P | PASS |
Michael Zawacki
|
|
|
Excavator on site, no dirt has left site, BMPs in good shape. Will need to haul out back fill after basement is dug.
|
Complaint Inspection | 5/21/2019 | 5/21/2019 | 5/23/2019 | P | PEND |
Andy J. Long
|
|
|
Notified project manager to clean up any trackout and to not allow parking on the lot above them, which should only be accessed if necessary
|
Site Preparation | 5/13/2019 | 5/15/2019 | 5/15/2019 | A | PASS |
Michael Zawacki
|
|
|
Met with excavator on site. Wattles have been trenched and added at bottom of lot by drainage. Rock for entrance was getting delivered. Corners of home were marked, will add silt fence along rear perimeter.
|
Site Preparation | 5/9/2019 | 5/9/2019 | 5/13/2019 | P | PEND |
Michael Zawacki
|
|
|
2082505421 ken ( approved to start construction) Wattle needs to be trenched and protect low spot on rear drainage. Talked to builder, follow up scheduled.
|