Permit Information
Permit NumberFIR18-00686
StatusFinaled
Name LARSON FIRE PROTECTION LLC
Site Address 707 W FORT ST
Project NameImmanuel Lutheran Church
Customer Number 
ePlanReviewYes
Description
[Immanuel Lutheran Church]
The fire sprinkler scope of work consists of protecting a two-level building with a mezzanine. The building is predominately light hazard. The building is of combustible construction with numerous combustible concealed spaces.

*** FIELD INSPECTOR ***
Please, verify ALL combustible concealed spaces have adequate protection including above the suspended ceilings.

• The underground piping is under permit FIR18-00538.

[BLD18-0887]
Do not final or issue certificate of occupancy until permit for 815 N 7th St to remove exterior balcony and spiral stair on west side of house is finaled. Permit for a tenant improvement to an existing church. Work to include: upgrades to the east wall of the church to a 2-hour fire barrier per approved code alternate; interior upgrade with HVAC system and related structural work; new doors and hardware for code compliance; accessible restrooms in the basement; interior non-bearing partitions; kitchen cabinets and equipment; sanctuary ceiling; lighting; new finishes in compliance with Ch. 8 of the 2015 IBC. A code alternate has been approved to address fire separation issues on the east side of the building. This building will be fully sprinklered with an NFPA 13 system installed throughout the building for area increase as Type VB construction. The Fire Sprinkler and Fire Alarm systems WILL REQUIRE SEPARATE PERMITS and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JAR**

Alternative Materials and Methods:
This project includes approved code alternates to the following fire protection systems and/or building life safety systems. Please review the supplemental documents attached to this building permit case for details. Fire protection “shop drawings” shall include approved code alternate design.

• There is one AMM at this time that affects the fire protection. Please, see addendum
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/28/20193/1/20193/1/2019APASS
DetailsJim Page
Final fire sprinkler inspection complete.

Ron Phone #: ###-####
INSP-Final Inspection1/31/20192/1/20192/1/2019PPART
DetailsJim Page
Partial final inspection for fire sprinkler system complete, flow switch currently reports in 7 seconds due to backflow issues, Backflow is going to be changed to allow a longer time frame for flow switch activation. Dry system trip will be completed after backflow is changed.

Gary Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro12/20/201812/21/201812/21/2018PPART
DetailsJim Page
Hydrostatic test for dry system witnessed, no pressure loss observed. 24 hour air test still needs to be performed.

Ron Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro12/18/201812/19/201812/19/2018PCANC
DetailsJim Page
Cancelled per conversation with point of contact.

Hydro on the dry system. Ron Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro12/11/201812/12/201812/12/2018PDONE
DetailsJim Page
Hydrostatic test for remaining overhead wet system fire sprinkler piping witnessed, no pressure loss observed, hydrostatic test for all of wet system complete.

Ron Phone #: ###-####
INSP-Sprinkler Rough-in12/11/201812/12/201812/12/2018PPASS
DetailsJim Page
Rough in inspection for dry system complete.

dry system Ron Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro12/6/201812/7/201812/7/2018ACANC
DetailsJim Page
Inspextion request cancelled per conversation with Ron Larson.

Tony is point of contact, ###-####
INSP-Sprinkler Rough-in/Hydro12/5/201812/6/201812/6/2018ACANC
DetailsJim Page
Cancelled per conversation with point of contact, visible leaks in a couple of locations, request is rescheduled.

Tony is point of contact, ###-####
INSP-Sprinkler Rough-in/Hydro12/4/201812/5/201812/5/2018PPART
DetailsJim Page
Rough in inspection complete for overehad fire sprinkler piping east of the chapel complete, discussed areas for sway brace attachment, hydro for installed section will be completed on 06DEC2018 per conversation with sprinkler fitter on project.

Ron Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro12/4/201812/4/201812/4/2018PCANC
DetailsJim Page
Inspection request was suppose to be scheduled for 05DEC2018 per conversation with point of contact. This request is cancelled and will be rescheduled by POC.

Ron Phone #: ###-####
INSP-Sprinkler Rough-in11/6/201811/7/201811/7/2018AFAIL
DetailsTroy Cobbley
Sesmic Restraints needed
Sesmic Bracing incorrect based on drawing. (This item will be consulted with the assitant fire marshal next week.)
Face Bushing OK
Side walls off the wall to be verified by Ron based on manufactuer
As builts are to be provided at the end of the project.
INSP-Sprinkler Rough-in11/5/201811/6/201811/6/2018AFAIL
DetailsTroy Cobbley
See the city approved plans for locations/rooms in the east half of the basement that was inspected today. As-builts are required, approval is needed for supplying the pendants in the corridor from a 1 1/2" branchline instead of the 3" main, verification is needed for combustible concealed spaces above the ceiling as discussed, need verification of spacing of sidewall heads from the walls they are installed against, need branchline restraints, need earthquake bracing installed, need flat faced bushing changed.

Basement // Ron Phone #: ###-####
INSP-Sprinkler Rough-in11/2/201811/5/201811/5/2018ACANC
DetailsJim Page
Inspection request rescheduled per conversation with point of contact, inspection request will be rescheduled for 06NOV2018.

Basement // Ron Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro10/23/201810/24/201810/24/2018PPART
DetailsJim Page
Hydrostatic test for basement overhead firte sprinkler piping witnessed, no pressure loss observed.

basement // Ron Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro10/16/201810/17/201810/17/2018APART
DetailsJim Page
Hydrostatic terst for overhead fire sprinkler piping in chapel/sanctuary section complete, remianing sprinkler piping to have hydrostatic test completed at a later date.

sanctuary- Ron Phone #: ###-####
INSP-Sprinkler Rough-in10/10/201810/11/201810/11/2018APART
DetailsJim Page
Partial rough to cover inspection for overhead fire sprinkler piping complete, notated city approved drawings with pink highlighter/red ink areas approved for cover.

Ron Phone #: ###-####