Final | 4/3/2020 | 4/3/2020 | 4/3/2020 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth- final ok- card signed
|
Final | 3/31/2020 | 3/31/2020 | 3/31/2020 | P | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth- Walked job with Levi- need all operational equipment installed under class 1 hood- missing 1 warmer- talked with GC about this- temp occupancy ok- rest of job ok- air balance ok
|
Final | 2/25/2020 | 2/26/2020 | 2/26/2020 | A | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth- temp occupancy ok- 1- need uv protection on mini split arma flex and seal penetration thru roof weather tight 2- need air balance report sent to me 3- need all equipment set and opertrational under class 1 and 2 hoods 4- RFI on smoke dectectors for RTU 25 a and b and 26 a and b still needs addressed and approved
call in final when ready
|
Rough-in | 2/11/2020 | 2/12/2020 | 2/12/2020 | P | PASS |
Brian Scoles
|
|
|
cover in the Kitchen Phone #: ###-#### Inspection requested via web by Amanda Farnsworth- flex insulation and registers ok in rooms gym D 100 halway, 112A 116 cafeteria and kictchen ok for cover- all areas ok
|
Rough-in | 1/28/2020 | 1/29/2020 | 1/29/2020 | P | PASS |
Brian Scoles
|
|
|
Kitchen Phone #: ###-#### Inspection requested via web by Amanda Farnsworth-R/I on rooms 112 kitchen, 112a 113 116 and 117 seal on duct ok- dishwasher exhaust seal ok- ok for ceiling grid
|
Rough-in | 1/10/2020 | 1/13/2020 | 1/13/2020 | P | PART |
Brian Scoles
|
|
|
Area C for cover Phone #: ###-#### Inspection requested via web by Amanda Farnsworth- area D rooms 106, 109, and 100 hallway ok for ceiling tiles area C 106, 107, 108, 109, 110, 111, 112, 113 and 114 ok for ceiling tiles area C 104 and 105 media center ok for ceiling tiles 2nd layer firewrap on grease duct ok- all grease duct done
|
Rough-in | 1/8/2020 | 1/9/2020 | 1/9/2020 | A | PART |
Brian Scoles
|
|
|
light test inspection on grease duct Phone #: ###-#### Inspection requested via web by Amanda Farnsworth- RTU 25 A and B ducting on roof ok- media center seal ok partially insulated waiting on approved flex duct to tie in registers on order- grease duct light test on 2 taps tied into 1 24" round to hood ok- ok for firewrap- grease duct light test all completed
|
Rough-in | 12/31/2019 | 1/3/2020 | 1/3/2020 | A | PART |
Brian Scoles
|
|
|
cover and grease duct Phone #: ###-#### Inspection requested via web by Amanda Farnsworth- 1st and 2nd layer firewrap ok- excluding hood connections- area A B and C corridirs ok for ceiling tiles- area A rms 111 110 109 ok for cover
|
Rough-in | 12/23/2019 | 12/24/2019 | 12/24/2019 | A | PASS |
Jack Reynolds
|
|
|
Grease duct Phone #: ###-#### Inspection requested via web by Amanda Farnsworth - light test on field weld at drop to 90 and square/round ok marked prints - small amount of duct seal in corridor ok for insulation marked prints
|
Rough-in | 12/17/2019 | 12/19/2019 | 12/19/2019 | A | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth- grease duct light test on round main 1 weld ok in ceiling- light test on drop and 90 degree with square to round on floor ok- still couple more to verify when installed- area A excluding rooms A111, 110 and 109 at later date- corridors in area A B C D needs inspected when ready
|
Rough-in | 12/5/2019 | 12/6/2019 | 12/6/2019 | P | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth- area DS rooms 101 102 103 104 107 107a seal and registerts ok- ok for hard lids- area D 2 fire smoke damper framing ok- ok to sheetrock- will look at clearances next inspection
|
Rough-in | 11/26/2019 | 11/27/2019 | 11/27/2019 | P | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth- area D rms D109 and D105 seal on duct ok- ok for insulation- area B classrooms only and rms B112 and B113 ok for ceiling tile cover- 2 fire/smoke dampers need framing and sheetrock clearances per installation instructions- framing missing on sides- access doors need installed on 2 fire/smoke damper above hard lids- call in for inspection when ready
|
Rough-in | 11/20/2019 | 11/21/2019 | 11/21/2019 | P | PART |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth - Signed okay to cover some hard lids on the mechanical plans
|
Conference | 10/16/2019 | 10/17/2019 | 10/17/2019 | A | PASS |
Brian Scoles
|
|
|
Light test on grease duct- ###-####- 2- 16 feet 24 inch round lengths with 3 square accees ports light test ok
|
Rough-in | 10/15/2019 | 10/16/2019 | 10/16/2019 | P | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth- all area c seal on duct ok- ok for insulation
|
Rough-in | 10/2/2019 | 10/3/2019 | 10/3/2019 | P | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth- All area A seal on duct ok- ok to insulate excluding drops from RTU have not been installed will look at seal on grid inspection
|
Rough-in | 9/4/2019 | 9/5/2019 | 9/5/2019 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth- Area B only 6 class rooms seal ok- ok for insulation all 6 classrooms area B only- approved drawings onsite
|