Permit Information
Permit NumberBLD18-03122
StatusFinaled
Name BILTMORE COMPANY
Site Address 11715 W KING ST
Project NameFairview Apartments - Bldg 3
Customer Number 
ePlanReviewYes
Description
(FAIRVIEW APARTMENTS) (BLDG 3) (DRH17-00532) (GRD18-00035) Permit for the construction of Building 3, a 27,059 sq ft, 3-story, 24-unit apartment building. This building is one of six buildings within a multi-family development, which includes (3) three-story, 24-unit multi-family buildings and (3) two-story, 8-unit buildings for a total of 96 units on the site. Work to include general site work and the construction of the new building per the approved plans. Special Inspections required per attached Form 310. All buildings are to be fully fire sprinklered with an NFPA 13-R system as required for residential occupancy and story increase. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/24/201910/24/201910/24/2019PPASS
DetailsTell Riley
PATT Phone #: ###-####//corrections made//window opening devices installed on windows under 36" sill--only a couple units//all other required inspections complete--verified online//signed card for all units//
Permanent Occupancy  10/24/2019 DONE
BLD-Final10/23/201910/23/201910/23/2019PNR
DetailsTell Riley
Pat Phone #: ###-####//need to fire caulk around furnaces// need to adjust door hinge springs//
FIRE-Final Inspection10/22/201910/22/201910/22/2019PPASS
DetailsTroy Cobbley
Life safety passed.

Matt Phone #: ###-####
FIRE-Final Inspection10/18/201910/21/201910/21/2019AFAIL
DetailsTroy Cobbley
The smoke alarm in 102 still has not been relocated.

Matt Phone #: ###-####
FIRE-Final Inspection10/18/201910/18/201910/18/2019PPART
DetailsTroy Cobbley
Life safety on units 101 202 203 302 303 103 104 203 204 303 304 is complete. 102 had a smoke alarm too close to the restroom door. // Matt ###-####
BLD-Final10/18/201910/18/201910/18/2019PPART
DetailsTell Riley
partial final for apartments 105, 106, 205, 206, 305 and 306// Matt ###-####//the six listed above ok for temp occupancy//
FIRE-Final Inspection10/14/201910/15/201910/15/2019APART
DetailsTroy Cobbley
Life safety passed for apartments 105, 106, 205, 206, 305 and 306.

matt Phone #: ###-####
PubWorks Occupancy Approval10/14/201910/14/201910/14/2019 DONE
DetailsTiffany Lowery
Zoning Approval10/11/201910/11/201910/11/2019 PASS
DetailsJosh Wilson
FIRE-Final Inspection10/10/201910/10/201910/10/2019PPART
DetailsTroy Cobbley
Life safety passed for apartments 107,108, 207, 208, 307 and 308.- Pat Phone #: ###-####
BLD-Energy code compliance9/10/20199/10/20199/10/2019PPASS
DetailsTell Riley
mATT Phone #: ###-####//last six units//101,102,201,202,301,303//ok to cover//
FIRE-Final Inspection9/6/20199/9/20199/9/2019AFAIL
DetailsJim Page
As noted in Troy Cobbleys entry on the 29AUG2019 inspection request, tenting inspection for fire sprinklers needs to be requested under the associated FIR permit, not the BLD permit.

tinting.... last six // Pat Phone #: ###-####
BLD-Framing/Rough-in9/6/20199/6/20199/6/2019PPASS
DetailsTell Riley
pat Phone #: ###-####/last six units ok to insulate//will check minor corrections at insulation inspection//
BLD-Energy code compliance8/30/20199/3/20199/3/2019APART
DetailsTell Riley
Matt Phone #: ###-####//corrections made//ok to cover//fire sprinklers were approved per troy//103,104,203,204,303,304//
BLD-Other8/28/20198/29/20198/29/2019AFAIL
DetailsTroy Cobbley
Wrong inspection number scheduled. Should be a FIR. Tenting is not approved. tenting // Pat Phone #: ###-####
BLD-Framing/Rough-in8/27/20198/28/20198/28/2019APART
DetailsTell Riley
Matt Phone #: ###-####//corections onsite//ok to insualate walls only//need tenting and sprinkler inspection prior to energy inspection//do not cover or insulate any sprinklers or associated piping//103,104,203,204,303,304//
BLD-Energy code compliance8/20/20198/21/20198/21/2019PPART
DetailsTell Riley
Matt- Phone #: ###-####//105,106,205,206,305,306//
BLD-Framing/Rough-in8/16/20198/19/20198/19/2019APASS
DetailsTell Riley
2nd six // Pat Phone #: ###-####//framing for 105.106.205.206.305.306//add bearing blocks under trusses//ok to insulate//
BLD-Energy code compliance8/8/20198/8/20198/9/2019PPASS
DetailsTell Riley
Matt Phone #: ###-####//framing corrections made//107,108,207,208,307,308 only//
BLD-Framing/Rough-in8/6/20198/6/20198/6/2019PPART
DetailsTell Riley
Pat Phone #: ###-####//first six 7's and 8's ok to insulate//get fire sprinkler rough prior to insulation//check list of corrections with Pat onsite.//
PubWorks Temp Occupancy Appr7/18/20197/18/20197/18/2019 DONE
DetailsTiffany Lowery
BLD-Wall Bracing6/18/20196/18/20196/18/2019PPASS
DetailsTell Riley
shear // bill Phone #: ###-####//shear nailing and holddowns ok per plans//
BLD-Foundation3/18/20193/19/20193/19/2019PPASS
DetailsJim Sly
Dane Phone #: ###-####
BLD-Foundation3/15/20193/18/20193/18/2019PPASS
DetailsMike Jordan
Dane Phone #: ###-####
BLD-Footing3/13/20193/14/20193/14/2019PPASS
DetailsJim Sly
Dane Phone #: ###-####
BLD-Footing3/13/20193/14/20193/13/2019APASS
DetailsDave Hannah
Dane Phone #: ###-####
Issue PAID IN FULL permit  3/12/2019 DONE
Print Occupancy Form  3/12/2019 DONE
OVERRIDE  3/1/2019  
Plan assigned to (JAR)9/26/20189/26/20183/1/2019 DONE
DetailsJulie Romig
1st Rev Comp - 4th Rev Comp - 506 Fairview Apartments Bldg 3
Routing - PLAN CHECK3/1/2019 3/1/2019 PASS
DetailsJulie Romig
4th Review
PLANS/APPL TAKEN TO FRONT DESK  3/1/2019 DONE
Permit Ready to Issue  3/1/2019 DONE
NEED- ALL MET
RP (EXPIRED)
GC FORM
REVISED VALUE
Routing - PLAN CHECK2/19/2019 2/28/2019 FAIL
DetailsJulie Romig
4th Review - Stamp covers framing plan on sheet S1.05. Please reupload with stamp relocated off drawing.
Also, please confirm that sheet 37.1 A-107 can be deleted.
Extend Review Timeline  2/22/2019 DONE
1st Approved 180 day extension per Adele. See documents
Meeting  2/12/2019 DONE
jeremy sent in request for extension
Routing PW Street Lights2/7/2019 2/8/2019 PASS
DetailsTom Marshall
Routing - PLAN CHECK2/7/2019 2/7/2019 FAIL
DetailsJulie Romig
Routing Off Site - STRUCTURAL1/10/2019 1/17/2019 PASS
DetailsJulie Romig
AHJ
Routing - PLAN CHECK1/10/2019 1/17/2019 FAIL
DetailsJulie Romig
Routing - PLANNING1/10/2019 1/11/2019 PASS
DetailsSusan Riggs
Route to Impact Fee Review11/13/201811/16/201811/14/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - FIRE9/26/20189/26/201811/13/2018 PASS
DetailsErika Akin
Attached comments to case
1st review completed  11/13/2018 FAIL
DetailsJulie Romig
Routing - PLAN CHECK9/26/2018 11/8/2018 FAIL
DetailsJulie Romig
Plan Review report emailed to applicant.
Routing Off Site - STRUCTURAL9/26/2018 10/10/2018 FAIL
DetailsJulie Romig
AHJ - Corrections Required per ePlanReview
Routing - MECHANICAL9/26/2018 10/3/2018 PASS
DetailsTroy James
Routing - PLUMBING9/26/2018 10/2/2018 PASS
DetailsDan Ediger
Per ISPC
Routing - Design Review9/26/2018 10/2/2018 PASS
DetailsAndrea Tuning
DRH17-532 Andrea
Routing - Addressing9/26/2018 10/1/2018 PASS
DetailsDoug Chausow
Updated parcel number and Address: 11715 W King St, Apts 101-103
Routing PW Street Lights9/27/2018 10/1/2018 FAIL
DetailsTom Marshall
Routing PW Sewer Design9/27/2018 10/1/2018 PASS
DetailsDeAnn Brown
Routing PW Sewer Rating9/27/2018 10/1/2018 PASS
DetailsBeverly Mountain
Routing PW Solid Waste9/27/2018 9/28/2018 PASS
DetailsEvan Carpenter
Routing PW Drainage9/27/2018 9/28/2018 PASS
DetailsBrian Murphy
Routing - PUBLIC WORKS9/26/2018 9/27/2018 PASS
DetailsBeverly Mountain
Routing - Erosion and Sediment9/26/2018 9/27/2018 PASS
DetailsAndy J. Long
SWPPP approved. Valid stormwater team designated. Site already started under GRD18-00035, no site prep required.
Routing - PLANNING9/26/2018 9/26/2018 FAIL
DetailsSusan Riggs
PUD17-22 Susan
APPLICANT MUST POST BOND FOR AMENITES
Intake Approval  9/21/2018 PASS
Intake Approval  8/28/2018 FAIL
DetailsJoe Bruce
1. Verification of legal lot or parcel form must be signed/dated by PDS subdivision staff.
2. Sheet A-1.1 does not call out or designate any fire hydrants. Resubmit with this information.
3. Provide architectural stamp / signature on (A-205, A-402, A402.1, A-403, A-404, A-405, A-406)
4. Provide and upload form #310 - Statement of Special Inspections completed and stamped by the design engineer for all special inspections noted on sheet S0.01
5. Incorrect codes are referenced on sheet G002. Resubmit with currently adopted codes by City of Boise. (see redlines)
6. Incorrect version of IECC is used on G008 and G009. Resubmit with 2015 IECC
7. I did not see the Manual J report in the "Documents" folder or referenced on the drawings. Please upload the Manual J , Manual D, and Manual S reports noted on the checklist.
Application received  8/27/2018 DONE
Application submitted via PDS Online on Aug 27 2018 10:27AM
First Notice 11/3/2019