Information based on query as of Friday, May 10, 2024.
Permit Information
Permit NumberBLD18-04521
StatusTemporary Occupancy
Name WRIGHT BROTHERS THE BLDG CO EAGLE
Site Address 978 N MAPLE GROVE RD
Project NameRosewood Apartments Bldg 12
Customer NumberEPLAN BLD18-04520
ePlanReview 
Description
**2 BUILDING PERMITS IN EPLAN UNDER BLD18-04520** (ROSEWOOD APARTMENTS) (BUILDING #12) // 03/09/20 PLAN MOD #3 TO ADD FIRE DAMPER TO FRESH AIR INTAKE AT WEST STAIR. JAR //08/01/19 PLAN MOD TO UTILITY LINE LOCATIONS AND LANDSCAPE PLANS. JAR// Permit for the construction of a new 22,890 sq ft, 3-story, 18-unit apartment building (identified as Type VIII on plans). Work to include general site work including demolition of existing residential structures and the construction of the new building per the approved plans. Special inspections required per attached Form 310. Carports to be constructed under separate building permit. All buildings are to be fully fire sprinklered with an NFPA 13-R system as required for residential occupancy and story increase. Exterior decks and breezeways to be protected. **JAR**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PubWorks Occupancy Approval7/14/20207/14/20207/14/2020 DONE
DetailsTiffany Lowery
BLD-Conference7/7/20207/8/20207/8/2020APART
DetailsMike Jordan
Earliest available consultation meeting, Permit Card Phone #: ###-#### Inspection requested via web by Kris Linnell. Ok for temp occ.
Temporary Occupancy7/8/202010/6/20207/8/2020 DONE
DetailsGemma Flores
OK for Perm Occ upon Final Fire and Zoning and final on PLM for roof drains
BLD-Final7/5/20207/6/20207/6/2020APEND
DetailsMike Jordan
Building final for TCO Phone #: ###-#### Inspection requested via web by Kris Linnell. Will be ok for temp occ. once zoning signs off on bond and issues temp.
Zoning Approval Temp7/6/20207/6/20207/6/2020 PASS
DetailsKatelyn Menuge
Temporary approval
BLD-Final7/1/20207/2/20207/2/2020PNR
DetailsMike Jordan
Building Final inspection Phone #: ###-#### Inspection requested via web by Kris Linnell
FIRE-Final Inspection7/1/20207/2/20207/2/2020PPART
DetailsGreg Ruxton
Fire life safety inspection of building completed and code compliant. Contractor to finish hanging undercounter FE's on brackets prior to building final inspection. Area of concern is aerial fire apparatus access. Travel distance exceeds 150 ft and required approved turnaround code not be verified.

Fire Life ; Safety for Temp Occupancy to allow Tenant Touring of interiors of apartments. Phone #: ###-#### Inspection requested via web by Kris Linnell
BLD-Ceiling Grid Inspection3/13/20203/16/20203/16/2020ACANC
DetailsJim Storey
Chris Phone #: ###-####
Plan assigned to (JAR)2/19/20202/19/20203/9/2020 DONE
DetailsJulie Romig
02/25 - Plan Mod Rosewood Apt Bldg 12 - Plan Mod #3 for building 12 only- per inspector request, adding dampers to the fresh air intakes in the stair, as shown in details 2/M5.0
**EPLAN BLD18-04520**
Routing - PLAN CHECK2/20/2020 3/9/2020 PASS
DetailsJulie Romig
Permit Ready to Issue  3/9/2020 DONE
plan mod approved
CHANGE STATUS TO (ISS)  3/9/2020 DONE
Routing - MECHANICAL2/20/2020 2/21/2020 PASS
DetailsTroy James
Pass per ePlanReview
Plan Modification Accepted  2/19/2020 DONE
Plan Mod #3 for building 12 only- per inspector request, adding dampers to the fresh air intakes in the stair, as shown in details 2/M5.0
BLD-Framing/Rough-in2/14/20202/14/20202/14/2020PPASS
DetailsMike Jordan
Building 12 East 12 unit drop ceiling locations framing and fire caulking. Phone #: ###-#### Inspection requested via web by Kris Linnell
BLD-Framing/Rough-in2/11/20202/12/20202/12/2020APART
DetailsMike Jordan
Drop Ceiling Framing inspections in 05 and 06 units in first, second, and third floors. Phone #: ###-#### Inspection requested via web by Kris Linnell. Fir downs ok to cover pending mech at fire damper areas.
BLD-Energy code compliance1/27/20201/27/20201/27/2020PPASS
DetailsMike Jordan
Building 12 - 1st Floor, Insulation, Vapor Barrier ; RC Channel inspection. Phone #: ###-#### Inspection requested via web by Bob Goodwin
BLD-Framing/Rough-in1/22/20201/22/20201/22/2020PPASS
DetailsMike Jordan
Building 12 - 1st Floor Energy Seal, Fire Caulking ; Framing
Building 12 - 2nd Floor Ceilings 1st layer gyp and 2nd layer gyp overlap Phone #: ###-#### Inspection requested via web by Bob Goodwin
BLD-Wall cover1/21/20201/21/20201/21/2020PCANC
DetailsMike Jordan
Building 12 - 2nd Floor Insulation and RC channel inspection for cover. Phone #: ###-#### Inspection requested via web by Bob Goodwin
BLD-Energy code compliance1/21/20201/21/20201/21/2020PPASS
DetailsMike Jordan
Building 12 - 2nd Floor Insulation and RC channel inspection for cover. Phone #: ###-#### Inspection requested via web by Bob Goodwin
BLD-Framing/Rough-in1/17/20201/17/20201/17/2020PPASS
DetailsMike Jordan
Re-inspection of Fire Stopping, Energy Code and Framing for Building 12 - 2nd Floor Units cover for Insulation ; Vapor Barrier install. As late as possible this afternoon.

6" OSA intakes at west units (105, 106, 205, 206, 305 ; 306) being addressed by Mech Eng, front of furnace alcoves not being covered until after ceiling drops framing inspection. Phone #: ###-#### Inspection requested via web by Bob Goodwin. Ok to insulate 2nd. floor only.
BLD-Framing/Rough-in1/16/20201/16/20201/17/2020PPART
DetailsMike Jordan
2nd. floor, neeeds to complee firecaulking at toilets and tub drains. Provide UL listed assembly for through penetrations of fresh air intakes at 1hr. fire barrier walls.
BLD-Energy code compliance1/15/20201/15/20201/15/2020PPASS
DetailsMike Jordan
Third Floor Insulation vapor barreir and RC Channel on Ceiling and walls. Phone #: ###-#### Inspection requested via web by Kris Linnell. 3rd floor only ok to rock.
BLD-Framing/Rough-in1/14/20201/14/20201/14/2020PPASS
DetailsMike Jordan
Late A.M. Early P.M. to allow for Mechanical inspection on exhaust fan GWB Fire boxes. Framing Corrections and Mechanical failures from last walk have been corrected. Framing and Energy seal inspection for cover on third floor only. Phone #: ###-#### Inspection requested via web by Kris Linnell. 3rd. floor only ok to insulate.
BLD-Framing/Rough-in1/13/20201/14/20201/14/2020ANR
DetailsMike Jordan
Late A.M. Early P.M. to allow for Mechanical inspection on exhaust fan GWB Fire boxes. Framing Corrections and Mechanical failures from last walk have been corrected. Framing and Energy seal inspection for cover on third floor only. Phone #: ###-#### Inspection requested via web by Kris Linnell. Moved to pm inspection.
BLD-Framing/Rough-in1/9/20201/10/20201/10/2020AFAIL
DetailsMike Jordan
Energy Seal, Fire caulking and Framing for Cover Third Floor.
Preferably as early as possible. Phone #: ###-#### Inspection requested via web by Kris Linnell. Needs to resolve vent fan install, install missing H2.5, LPT4 and missed fire caulking.
BLD-Energy code compliance12/26/201912/26/201912/26/2019PPART
DetailsTony Young
Energy Code inspection of pre-insulation areas for pre-rock installations in Buidling 12. Phone #: ###-#### Inspection requested via web by Bob Goodwin,, ok to cover insulated areas for pre-rock
BLD-Framing/Rough-in12/19/201912/19/201912/19/2019PPART
DetailsMike Jordan
Framing inspection in pre-rock areas. Phone #: ###-#### Inspection requested via web by Kris Linnell. Pre rock and fire caulking. work in progress.
BLD-Framing/Rough-in11/18/201911/19/201911/19/2019ACANC
DetailsMike Jordan
Earliest availability preferred. Inspect remaining Sheathing nailing on SE Corner of Building 12. Phone #: ###-#### Inspection requested via web by Kris Linnell
BLD-Wall Bracing11/19/201911/19/201911/19/2019APASS
DetailsMike Jordan
Earliest availability preferred. Inspect remaining Sheathing nailing on SE Corner of Building 12. Phone #: ###-#### Inspection requested via web by Kris Linnell
BLD-Framing/Rough-in11/8/201911/12/201911/12/2019ACANC
DetailsMike Jordan
Exterior Nail inspection Phone #: ###-#### Inspection requested via web by Kris Linnell
BLD-Wall Bracing11/12/201911/12/201911/12/2019APASS
DetailsMike Jordan
Exterior Nail inspection Phone #: ###-#### Inspection requested via web by Kris Linnell. Exterior and interior shear walls, floors 1 to 3 ok to cover.
BLD-Framing/Rough-in10/18/201910/21/201910/21/2019PFAIL
DetailsMike Jordan
First Floor Shear Inspection Phone #: ###-#### Inspection requested via web by Kris Linnell. 1st floor shear, missing fateners and holddowns.
BLD-Conference9/17/20199/18/20199/18/2019ADONE
DetailsMike Jordan
Per Mike Jordan, Framing Consultation prior to framing for building 12. Phone #: ###-#### Inspection requested via web by Kris Linnell
BLD-Concrete9/10/20199/11/20199/11/2019PPART
DetailsTell Riley
Building Slab and interior footing pour scheduled for 6A.M. Thursday Morning. Phone #: ###-#### Inspection requested via web by Kris Linnell//vapor barrier ok//add bar to footings as discussed onsite// ok pending specials//
BLD-Foundation8/23/20198/26/20198/26/2019PPASS
DetailsMike Jordan
Building 11 North Half Stem Walls Rebar inspection. Concrete pour set for Tuesday 0730. Phone #: ###-#### Inspection requested via web by Kris Linnell
CHANGE STATUS TO (ISS)  8/14/2019 DONE
Plan assigned to (JAR)7/24/20197/24/20198/6/2019 DONE
DetailsJulie Romig
1st Rev Comp - Plan Mod - Rosewood Bldg 12
Permit Ready to Issue  8/6/2019 DONE
PLAN MOD - DO NOT REISSUE UNTIL PLAN MOD FEES FOR BLD19-04520 HAVE BEEN PAID
Routing - PUBLIC WORKS7/30/2019 8/6/2019 PASS
DetailsAngela Hardy
Signed off in ePlan and Tidemark under BLD18-04520 by AMH on 7/30/19
Routing - Design Review8/5/2019 8/5/2019 PASS
DetailsAndrea Tuning
BLD-Energy code compliance8/1/20198/2/20198/2/2019APASS
DetailsMike Jordan
chris Phone #: ###-####. Rifid insulation on interior of stemwall under slab on grade.
Routing - Design Review7/30/2019 8/1/2019 FAIL
DetailsAndrea Tuning
Remove trash enclosure from adjacent to Susan Drive on all grading plans and site plans
Routing - PLAN CHECK7/30/2019 8/1/2019 PASS
DetailsJulie Romig
Pending DR approval
Routing - PLUMBING7/30/2019 7/30/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC
BLD-Foundation7/25/20197/26/20197/26/2019APART
DetailsTell Riley
Bob-stem wall-says plan mod is for sewer not for this inspection Phone #: ###-####//north end building//walls ok pending specials// adjust wall rebar at location discussed onsite//
Plan Modification Accepted  7/24/2019 DONE
plan mod accepted in e plan for BLD18-04520, BLD18-04521 & BLD18-04519-updates to the utilities-PW, water lines ectC1.0,C2.0, C2.1, P2.1, A0.1, A2.2,A2.3,A4.3,A10.0, S2.2, S2.3, S2.4, S5.1-assigned to JAR-no valuations will change
BLD-Footing7/22/20197/23/20197/23/2019APART
DetailsMike Jordan
Concrete at 1230 // bob Phone #: ###-####. Perimeter footings and column pad footings. Will have special inspection. Noted several areas were rebar does not have the 3 inch minimum clearance required. Special inspector to verify 3inch min. clearance prior to concrete placement.
Plan assigned to (JAR)6/24/20196/24/20196/25/2019 CANC
DetailsJulie Romig
Plan Mod for BLD18-04520 (Bldg 11)
CHANGE STATUS TO (ISS)  6/25/2019 DONE
Plan mod was for BLD18-04520 only per Julie
Routing - Design Review3/6/2019 6/25/2019 FAIL
DetailsAndrea Tuning
The applicant should consolidate the parcels into one large parcel or enter into a cross access/shared parking agreement in regard to parking, pedestrian networks and trash collection.

Replace the street trees on Susan Drive that were removed from this version of the landscape plan.
Plan Modification Accepted  6/24/2019 DONE
plan mod: Split Bld 12 into 2 blds with a 2-hour fire rated fire wall, reducing the construction type from VA to VB. Sheets A0.1, A2.2, A2.3, A4.3, A10.0, S2.2, S2.3, S2.4, S5.1
Telephone call  5/29/2019 DONE
Spoke with Wendy informing about fees. She stated their project, but they didn't pay for them and will look in to it. informed her a check would need to be brought in our if they use a different account they may pay online
Telephone call  5/22/2019 DONE
left a message ###-####- Jeff Chapman with Wright Brothers, that we need RP and information on ACHD
Issue PAID IN FULL permit  5/22/2019 DONE
Print Occupancy Form  5/22/2019 DONE
Expiration Notice5/21/20196/12/20195/21/2019 DONE
DetailsBrittany Hill
Plan assigned to (JAR)1/2/20191/3/20195/16/2019 DONE
DetailsJulie Romig
1st Rev Comp - 4th Comp - 506 Rosewood Apts Bldg 12
Routing PW Drainage1/10/2019 5/16/2019 PASS
DetailsBrian Murphy
Routing PW Street Lights1/10/2019 5/16/2019 PASS
DetailsTom Marshall
Routing - PLAN CHECK5/13/2019 5/16/2019 PASS
DetailsJulie Romig
PLANS/APPL TAKEN TO FRONT DESK  5/16/2019 DONE
Permit Ready to Issue  5/16/2019 DONE
MET
NEED ACHD (DO NOT ISSUE WITHOUT BLD18-04520)
NEED RP
Routing - Addressing5/15/2019 5/15/2019 PASS
DetailsDoug Chausow
Routing - Design Review5/14/2019 5/14/2019 PASS
DetailsAndrea Tuning
Routing - PLANNING5/14/2019 5/14/2019 PASS
DetailsNicolette Womack
Routing PW Sewer Design5/13/2019 5/13/2019 PASS
DetailsDeAnn Brown
Routing - PLAN CHECK4/24/2019 5/2/2019 FAIL
DetailsJulie Romig
All IBC Plan Review items passed. Corrections required per DR, Planning, PW Sewer Design: easements/agreements required.
Routing PW Sewer Design4/24/2019 5/2/2019 PASS
DetailsDeAnn Brown
Routing - PLAN CHECK4/10/2019 4/22/2019 FAIL
DetailsJulie Romig
Routing PW Sewer Design4/10/2019 4/11/2019 FAIL
DetailsDeAnn Brown
Notes on sheet C2.0 still call out an existing 18" sewer main, when it is a 15" sewer main. Notes also use slopes for 6-inch services that match the service invert to the mainline invert. Services should tap mainline at or above 80% full level. Please revise.
Routing - PLANNING4/10/2019 4/10/2019 FAIL
DetailsNicolette Womack
Need to consolidate the parcels or provide a cross access/share parking agreement
Routing PW Sewer Design3/21/2019 3/27/2019 FAIL
DetailsDeAnn Brown
Changemarks from the first two review sessions have not been addressing. Revise and resubmit.
Routing - PLAN CHECK3/21/2019 3/26/2019 FAIL
DetailsJulie Romig
Routing - Design Review3/21/2019 3/21/2019 FAIL
DetailsAndrea Tuning
The applicant should consolidate the parcels into one large parcel or enter into a cross access/shared parking agreement in regard to parking, pedestrian networks and trash collection.
Provide a minimum of 66 bicycle parking spaces on the site with 17 of these spaces being covered. To provide a safe, covered and efficient location for the bicycles, the applicant will be required to design the spaces to be a minimum of 6 feet long and 2.5 feet wide and have an overhead clearance of 7-feet if covered. A 4-foot wide aisle is required between rows of bicycle parking or nearby walls. Stationary racks shall be located on improved non-permeable surfaces and anchored to the ground.
All light poles and fixtures shall be located outside of the required setbacks and landscape planters which contain trees as required by the landscape ordinance. All lighting shall also be designed and located so as to prevent glare or direct light from falling onto adjoining properties or streets. The illumination of all light fixtures shall not exceed two foot candles as measured 1-foot above the ground at property lines shared with residentially zoned or used parcels. All new pole lighting shall feature 100 percent cut-off light fixtures and all new wall lighting shall have full cut-off shields.
Routing - PLAN CHECK3/6/2019 3/19/2019 FAIL
DetailsJulie Romig
Routing PW Sewer Design3/6/2019 3/13/2019 FAIL
DetailsDeAnn Brown
Corrections noted in last review were not included in new set. Please see changemarks for noted corrections/changes.
Routing Off Site - STRUCTURAL3/6/2019 3/12/2019 PASS
DetailsJulie Romig
KPFF 2nd Review
Route to Impact Fee Review2/13/20192/16/20192/14/2019 PASS
DetailsShannon Cade
Review requested for Commercial Permit
1st review completed  2/12/2019 DONE
DetailsJulie Romig
Routing - PLAN CHECK1/3/2019 2/12/2019 FAIL
DetailsJulie Romig
Routing - FIRE1/2/20191/3/20192/5/2019 PASS
DetailsMark Scharfen
IFC Fire code complete. 02.05.2019
Routing Off Site - STRUCTURAL1/3/2019 1/16/2019 FAIL
DetailsJulie Romig
KPFF
Routing PW Sewer Design1/10/2019 1/14/2019 FAIL
DetailsDeAnn Brown
See changemarks in eplanreview. Contact DeAnn Brown ###-#### for record drawings.
Routing - PUBLIC WORKS1/3/2019 1/10/2019 PASS
DetailsMorgan Webb
Routing - Erosion and Sediment1/3/2019 1/9/2019 PASS
DetailsAndy J. Long
ESC site map and SWPPP approved. RP tbd, must be provided before permit may be issued . Site preparation inspection is REQUIRED
Routing - MECHANICAL1/3/2019 1/9/2019 PASS
DetailsTroy James
Routing - PLUMBING1/3/2019 1/9/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - Design Review1/3/2019 1/3/2019 FAIL
DetailsAndrea Tuning
The applicant should consolidate the parcels into one large parcel or enter into a cross access/shared parking agreement in regard to parking, pedestrian networks and trash collection.
Provide a minimum of 66 bicycle parking spaces on the site with 17 of these spaces being covered. To provide a safe, covered and efficient location for the bicycles, the applicant will be required to design the spaces to be a minimum of 6 feet long and 2.5 feet wide and have an overhead clearance of 7-feet if covered. A 4-foot wide aisle is required between rows of bicycle parking or nearby walls. Stationary racks shall be located on improved non-permeable surfaces and anchored to the ground.
All light poles and fixtures shall be located outside of the required setbacks and landscape planters which contain trees as required by the landscape ordinance. All lighting shall also be designed and located so as to prevent glare or direct light from falling onto adjoining properties or streets. The illumination of all light fixtures shall not exceed two foot candles as measured 1-foot above the ground at property lines shared with residentially zoned or used parcels. All new pole lighting shall feature 100 percent cut-off light fixtures and all new wall lighting shall have full cut-off shields.
Intake Approval  1/2/2019 PASS
DetailsJoe Bruce
Prescreen approval by JHB
Application received  12/20/2018 DONE
Application submitted via PDS Online on Dec 20 2018 3:07PM
Routing - PLANNING1/3/2019    
Routing - Addressing1/3/2019    
Routing PW Solid Waste1/10/2019    
DetailsEvan Carpenter
Routing - PLANNING3/21/2019    
Routing - Design Review4/10/2019   FAIL
DetailsAndrea Tuning
Submit a recorded cross access agreement.
Routing PW Drainage4/10/2019