FIRE-Final Inspection | 8/7/2020 | 8/10/2020 | 8/10/2020 | A | CANC |
Troy Cobbley
|
|
|
Need the project related fire alarm and fire sprinkler permits finaled prior to a life safety inspection. ] crrened- Matt Phone #: ###-####
|
BLD-Energy code compliance | 7/20/2020 | 7/20/2020 | 7/20/2020 | P | PART |
Tell Riley
|
|
|
Matt *screened* Phone #: ###-####//ok pending tenting approval for fire sprinklers prior to cover//
|
BLD-Framing/Rough-in | 7/16/2020 | 7/17/2020 | 7/17/2020 | A | PART |
Tell Riley
|
|
|
Matt - */Screened*/ Phone #: ###-####last two units first floor//add blocking between joists a bearing wall//ok to insulate//
|
BLD-Framing/Rough-in | 7/16/2020 | 7/16/2020 | 7/17/2020 | P | PART |
Dave Hannah
|
|
|
Screened- Mat- call before arrival Phone #: ###-#### 2econ and third floors ok insulate
|
BLD-Energy code compliance | 7/15/2020 | 7/15/2020 | 7/15/2020 | P | PART |
Tell Riley
|
|
|
SCREENED // Matt Phone #: ###-####//3rd set of 6 from east end//2 top units still need tenting inspection//other 4 units appear to be ok//
|
BLD-Framing/Rough-in | 7/10/2020 | 7/13/2020 | 7/13/2020 | A | PASS |
Tony Young
|
|
|
screened // Pat Phone #: ###-####// ok to insulate//
|
BLD-Framing/Rough-in | 7/8/2020 | 7/8/2020 | 7/8/2020 | P | FAIL |
Tell Riley
|
|
|
Matt - /*screened*/ Phone #: ###-####//corrections have not been completed to meet plans and specifications//See Matt onsite for CN//
|
BLD-Framing/Rough-in | 7/7/2020 | 7/8/2020 | 7/8/2020 | A | NR |
Tell Riley
|
|
|
Matt - /*screened*/ Phone #: ###-####//corrections are not complete//moved to PM//
|
BLD-Framing/Rough-in | 7/6/2020 | 7/6/2020 | 7/6/2020 | P | FAIL |
Tell Riley
|
|
|
SCREENED // Matt Phone #: ###-####//2nd six units still need corridor fire wall to meet listing on plans//3rd six units correction notice issued for framing corrections, see Matt onsite for list--also corridor fire wall on these six units needs to meet listing on plans//
|
BLD-Wall cover | 6/30/2020 | 6/30/2020 | 7/1/2020 | P | CANC |
Tell Riley
|
|
|
screened // Matt Phone #: ###-####
|
BLD-Wall cover | 7/1/2020 | 7/1/2020 | 7/1/2020 | P | PART |
Tell Riley
|
|
|
areas in fire wall to roof deck over center stairways were filled with gyp board and penetrations fire caulked//this was verified by photos sent by contractor//
|
BLD-Energy code compliance | 6/26/2020 | 6/29/2020 | 6/29/2020 | A | PART |
Tell Riley
|
|
|
ok to cover units 2nd six from east end areas not affected by CN//CN issued for fire wall 1 hr at corridor--does not refelct listing as it current create a cavity above panty areas, fire caulk penetrations//note see detail C3 for corridor ceiling 1 hr construction//
|
BLD-Energy code compliance | 6/25/2020 | 6/26/2020 | 6/26/2020 | A | CANC |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Matthew Bundy
|
BLD-Wall cover | 6/23/2020 | 6/23/2020 | 6/23/2020 | P | PART |
Tell Riley
|
|
|
Matt Phone #: ###-#### Inspection requested via web by Matthew Bundy//6 units on west end for fur-downs only//framing in these areas ok//pending trades inspections//fire caulk as discussed//
|
BLD-Framing/Rough-in | 6/23/2020 | 6/23/2020 | 6/23/2020 | P | PART |
Tell Riley
|
|
|
Matt Phone #: ###-#### Inspection requested via web by Matthew Bundy//2nd six units east end//see CN onsite//ok ot insulate only//corrections will need completed prior to cover//
|
BLD-Energy code compliance | 6/17/2020 | 6/17/2020 | 6/17/2020 | P | PART |
Tell Riley
|
|
|
Matt *screened* Phone #: ###-####//107, 108,207,208,307,308// energy requirements updated by designer via res check//attic insulation in these units will Be r50//fire caulk complete//
|
BLD-Energy code compliance | 6/15/2020 | 6/16/2020 | 6/16/2020 | A | FAIL |
Tell Riley
|
|
|
screened // Matt Phone #: ###-####//label fire walls in attic--fire caulk penetrations//wall insulation does not meet rescheck//window u-values do not meet rescheck//1 hour rated laydown parapet was not installed for 4' from separation walls at deck//need fire sprinkler tenting inspection//
|
BLD-Framing/Rough-in | 6/11/2020 | 6/12/2020 | 6/12/2020 | A | PART |
Brandon Shaw
|
|
|
Units 107,108, 207, 208, 307, 308
|
BLD-Wall cover | 6/11/2020 | 6/11/2020 | 6/11/2020 | P | PART |
Tell Riley
|
|
|
screened // Matthew Phone #: ###-####//3rd 6 units 2nd floor drops--corrections made//architect approved fire blocking fix for first 4 2nd floor drops//remaining drops will have gyp on walls//
|
CHANGE STATUS TO (ISS) | | | 6/5/2020 | | DONE |
|
|
|
plan mod
|
Plan assigned to (JG) | 6/1/2020 | 6/1/2020 | 6/4/2020 | | PASS |
Javier Guzman
|
|
|
06/09 2nd rev Plan Mod Northview Apts Bldg 1 ePlan, pend Mech
|
Permit Ready to Issue | | | 6/4/2020 | | DONE |
|
|
|
**DO NOT REISSUE - PLAN MOD**
|
Routing - MECHANICAL | 6/3/2020 | | 6/4/2020 | | PASS |
Troy James
|
|
|
Signed off in ePlan by Mechanical Troy James
|
BLD-Wall cover | 6/3/2020 | 6/3/2020 | 6/3/2020 | P | PART |
Tell Riley
|
|
|
screened // Matt Phone #: ###-####//3rd set of 2nd floor units for pre-rock areas//need to fire caulk areas discussed//looked at gyp on first 4 units--need to extend down walls on rated wall side and exterior walls, or provide detail from architect//
|
BLD-Wall cover | 6/2/2020 | 6/3/2020 | 6/3/2020 | A | CANC |
Tell Riley
|
|
|
screened // Matt Phone #: ###-####//moved to pm//no one onsite//
|
Routing - PLAN CHECK | 6/3/2020 | | 6/3/2020 | | PASS |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 6/1/2020 | | 6/2/2020 | | PASS |
Javier Guzman
|
|
|
|
Routing - MECHANICAL | 6/1/2020 | | 6/2/2020 | | FAIL |
Troy James
|
|
|
Emailed corrections to A1 heating
|
Plan Modification Accepted | | | 5/26/2020 | | DONE |
|
|
|
plan mod #2 for manual J
|
BLD-Wall Bracing | 5/21/2020 | 5/22/2020 | 5/22/2020 | A | PASS |
Brandon Shaw
|
|
|
screened// exterior shear and fire caulk 2nd fix fir down// Pat Phone #: ###-####
|
BLD-Other | 5/19/2020 | 5/19/2020 | 5/19/2020 | P | PART |
Tell Riley
|
|
|
rough to cover .. screened // Matt Phone #: ###-####//2nd floor east end 2 apartments//cover ceiling for fur downs only//
|
BLD-Wall Bracing | 5/18/2020 | 5/18/2020 | 5/18/2020 | P | FAIL |
Tell Riley
|
|
|
Matt *screened* Phone #: ###-####//Still need RFI for densglass shear walls in corridors//plans show all shear walls to be wood structural panels, and plans do not have nailing or shear schedule for densglass//
|
BLD-Wall Bracing | 5/11/2020 | 5/12/2020 | 5/12/2020 | A | FAIL |
Tell Riley
|
|
|
Matt Phone #: ###-####//CN issued see onsite//
|
BLD-Other | 5/8/2020 | 5/8/2020 | 5/8/2020 | P | CANC |
Tell Riley
|
|
|
rough to cover // Matt Phone #: ###-####//not ready, need to have rough ins inspected in areas wanting to cover for soffits//
|
BLD-Wall Bracing | 4/16/2020 | 4/17/2020 | 4/17/2020 | P | PART |
Dave Hannah
|
|
|
Screened- Matt Phone #: ###-#### thrid floor int sheer walls ok to cover
|
BLD-Wall Bracing | 4/3/2020 | 4/3/2020 | 4/3/2020 | P | PART |
Tell Riley
|
|
|
*cleared* Please call ahead so site can cleared Pat Phone #: ###-####///second story interior shear walls prior to gyp cover//
|
BLD-Wall Bracing | 3/19/2020 | 3/20/2020 | 3/20/2020 | A | PART |
Tell Riley
|
|
|
please call .... shear // Pat Phone #: ###-####/interior shear on level one ok to cover with gyp//
|
CHANGE STATUS TO (ISS) | | | 3/18/2020 | | DONE |
|
|
|
|
Plan assigned to (JG) | 3/4/2020 | 3/4/2020 | 3/17/2020 | | PASS |
Javier Guzman
|
|
|
03/17 plan mod Northview Apts ePlan
|
Routing - PLAN CHECK | 3/11/2020 | | 3/17/2020 | | PASS |
Javier Guzman
|
|
|
|
Permit Ready to Issue | | | 3/17/2020 | | DONE |
|
|
|
plan mod approved
|
Plan Reviewer's activity | | | 3/6/2020 | | DONE |
Javier Guzman
|
|
|
Provide the following to pass plan modification prescreen:
• Revise: On the plan modification application revise and include the revised S sheets to the application list of all applicable revised sheet numbers to item 3
• Provide revised structural plan sheets S1.00, S1.01, S4.00, S4.10 stamped by an Idaho license engineer
|
Plan Modification Accepted | | | 3/4/2020 | | DONE |
|
|
|
plan mod #1
|
BLD-Framing/Rough-in | 2/18/2020 | 2/18/2020 | 2/18/2020 | P | FAIL |
Tell Riley
|
|
|
Pat - Sheer Wall Inspection Phone #: ###-####//interior fire walls and shear walls--do not meet specifications on plans for UL assembly and sound//discussed with contractor UL assembly per plans and shear walls per structurals//
|
Issue PAID IN FULL permit | | | 2/14/2020 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/14/2020 | | DONE |
|
|
|
|
Telephone call | | | 2/13/2020 | | DONE |
|
|
|
Sheryl from Biltmore requested that we add the ACHD case to our BLD so she can pay the fee.
|
Plan assigned to (JG) | 10/15/2019 | 10/21/2019 | 2/12/2020 | | PASS |
Javier Guzman
|
|
|
3rd rev comp, 01/16 2nd rev, 506 Northview Apts Building pend fire
|
Routing - PLAN CHECK | 2/5/2020 | | 2/12/2020 | | PASS |
Julie Romig
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/12/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/12/2020 | | DONE |
|
|
|
met (in ePlan) Need GC
|
Routing - PLAN CHECK | 1/30/2020 | | 2/4/2020 | | FAIL |
Javier Guzman
|
|
|
See email from Julie Romig regarding corrections required.
|
Routing - PLUMBING | 1/30/2020 | | 2/4/2020 | | PASS |
Dan Ediger
|
|
|
Per plans and the ISPC
|
Routing - FIRE | 1/30/2020 | 1/30/2020 | 1/30/2020 | | PASS |
Joe Bruce
|
|
|
1-Hour fire rated riser room now shown on plans (A101 and A102).
|
Routing - FIRE | 1/10/2020 | 1/10/2020 | 1/28/2020 | | FAIL |
|
|
|
Resubmittal Northview Apt - Update the plans to show the required fire rated assemblies at walls and ceiling for the fire riser room. **JHB**
|
Plan resubmittals requested | | | 1/28/2020 | | DONE |
Joe Bruce
|
|
|
Sent an email to Sheryl Smith with Biltmore Co. for a resubmittal.
|
Routing - PLAN CHECK | 1/10/2020 | | 1/21/2020 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLUMBING | 1/10/2020 | | 1/16/2020 | | FAIL |
Dan Ediger
|
|
|
See Changemark
|
Routing PW Sewer Design | 1/10/2020 | | 1/15/2020 | | PASS |
DeAnn Brown
|
|
|
|
Routing - MECHANICAL | 1/10/2020 | | 1/15/2020 | | PASS |
Troy James
|
|
|
Outside air duct shall run to return plenum for all units.
|
Route to Impact Fee Review | 11/27/2019 | 11/30/2019 | 11/29/2019 | | PASS |
Travis P Black
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 11/27/2019 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 10/21/2019 | | 11/27/2019 | | FAIL |
Javier Guzman
|
|
|
|
Routing - FIRE | 10/15/2019 | 10/21/2019 | 11/25/2019 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed architect
|
Routing Off Site - STRUCTURAL | 10/21/2019 | | 11/19/2019 | | PASS |
Javier Guzman
|
|
|
signed off in ePlan by AHJ Engineers
|
Routing - PLANNING | 10/21/2019 | | 11/5/2019 | | PASS |
Celine Acord
|
|
|
Comply with Design Review conditions / PUD18-00022
|
Routing - PLUMBING | 10/21/2019 | | 10/26/2019 | | FAIL |
Dan Ediger
|
|
|
See changemarks
|
Routing - MECHANICAL | 10/21/2019 | | 10/25/2019 | | FAIL |
Troy James
|
|
|
Emailed manual j designer and applicant corrections.
|
Routing PW Street Lights | 10/22/2019 | | 10/23/2019 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Sewer Design | 10/22/2019 | | 10/23/2019 | | FAIL |
DeAnn Brown
|
|
|
Show sewer services as installed. Refer to changemarks.
|
Routing PW Solid Waste | 10/22/2019 | | 10/23/2019 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Drainage | 10/22/2019 | | 10/22/2019 | | PASS |
Brian Murphy
|
|
|
|
Routing - Addressing | 10/21/2019 | | 10/22/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 10/21/2019 | | 10/22/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 10/21/2019 | | 10/22/2019 | | PASS |
Michael Zawacki
|
|
|
Please refer to ESC19-00034 for main site esc permit
|
Routing - Design Review | 10/21/2019 | | 10/22/2019 | | PASS |
Katelyn Menuge
|
|
|
Redlined parking dimensions and need for parking blocks or 6-inch curbing. If covered bicycle parking is under the stairs we need three bicycle spaces under each stairwell.
|
Intake Approval | | | 10/15/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 10/14/2019 | | FAIL |
Javier Guzman
|
|
|
For prescreen review provide and upload the following:
• A portion of the previous request below was not addressed Per ePlan submittal standards the reserve the bottom right corner on the drawing plans for the City electronic stamps. Leave a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block on plan sheet A205. see ePlan standards at https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
• Revised plan sheets A401, A404, A405 came back sized 11” x 8” and are required per checklist to be a minimum 18” x 24” and Per ePlan submittal standards the reserve the bottom right corner on the drawing plans for the City electronic stamps. Leave a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block on plan sheet A401, A404, A405. see ePlan standards at https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
|
Intake Approval | | | 10/9/2019 | | FAIL |
Javier Guzman
|
|
|
For prescreen review provide and upload the following:
• Uploaded engineering calculations are required to be stamped, signed and dated by an Idaho licensed engineer
• Per checklist Include on site plan A1.1 Site Plan Clearly marked “Fire Department Access Roadways”
• Per checklist clearly mark on site plan A1.1 Site Plan location of Fire Hydrants
• Per ePlan submittal standards the reserve the bottom right corner on the drawing plans for the City electronic stamps. Leave a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block on plan sheet L1, A101, A103, A205, A401, A404, A405, S0.00. see ePlan standards at https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
|
Application received | | | 10/8/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 8 2019 11:20AM
|
FIRE-Final Inspection | 8/13/2020 | 8/14/2020 | | A | |
Jim Page
|
|
|
Matt *screened Phone #: ###-####
|
Routing - Design Review | 1/16/2020 | | | | PASS |
Katelyn Menuge
|
|
|
Updated Redlines, parkng striping, curbing and bike rack requirements
|