Information based on query as of Thursday, May 9, 2024.
Permit Information
Permit NumberBLD16-02008
StatusFinaled
Name ESI
Site Address 505 W IDAHO ST
Project Name5th & Idaho
Customer NumberBLD16-02007 PLAZA, GRD16-00039
ePlanReviewYes
Description
(5th & IDAHO) DO NOT FINAL THIS PERMIT UNTIL THE GRADING AND PLAZA PERMITS ARE FINALED. Construct a five story plus 1 story basement building consisting of approximately 101,000 GSF with a residential area of approximately 70,500 GSF including ancillary space. The structure will be a concrete parking garage, plaza and street grade concrete lid with wood framing systems for floors one through five along with the roof deck. The exterior envelope will be brick, EIFS, aluminum storefront, vinyl windows and a membrane roof system. Streetscape, excavation and underground utilities reviewed under permit GRD16-00039.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/14/20196/14/20196/14/2019PPASS
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Conference6/13/20196/13/20196/13/2019PPASS
DetailsDave Hannah
Adam Phone #: ###-#### handrails on 5th st ok
BLD-Conference5/9/20195/10/20195/10/2019ADONE
DetailsDave Hannah
BLD-Conference5/9/20195/9/20195/9/2019PDEFR
DetailsBrandon Shaw
Adam Phone #: ###-####
BLD-Aging Inspection5/1/20195/1/20195/2/2019 PEND
DetailsDave Hannah
BLD-Final2/1/20192/4/20192/4/2019APASS
DetailsDave Hannah
Phase 5 TCO Plan, Final inspection of Phase 5 roof patio. Call Adam before heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
FIRE-Final Inspection2/1/20192/4/20192/4/2019APASS
DetailsJim Page
Final pahse 5 for project complete, final inspection for life fire safety complete.

Phase 5 TCO Plan, Final inspection of Phase 5 roof patio. Call Adam before heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference1/8/20191/9/20191/9/2019ADONE
DetailsDave Hannah
Conference to Review ADA at Roof Deck Countertop. AKJ. Phone #: ###-#### Inspection requested via web by Adam Johnson
FIRE-Final Inspection12/21/201812/21/201812/21/2018PPART
DetailsJim Page
Final life fire safety inspection for phase 4 TCO complete. Phase 3 of TCO aggreement still needs to be completed for life fire safety.

Phase 4 TCO, Plaza Park. Call Adam with any questions. ###-####. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Final12/20/201812/20/201812/20/2018PPART
DetailsDave Hannah
Phase 4 TCO, Plaza Park. Call Adam with any questions. ###-####. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson phase 4 ok
BLD-Final12/5/201812/5/201812/5/2018PPART
DetailsDave Hannah
TCO final inspections, phase 2, Loft Units. Please contact Adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson ok for tco
FIRE-Final Inspection12/5/201812/5/201812/5/2018PPART
DetailsJim Page
Life fire safety inspection for Phase 2 TCO complete.

TCO final inspections, phase 2, Loft Units, follow up to walk last week. Please contact Adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Final11/30/201811/30/201811/30/2018PPEND
DetailsDave Hannah
Request for TCO, Phase 5 of the TCO plan, Parking Garage. Please call adam when heading to site. Thanks.AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson ok for tco of garage
FIRE-Final Inspection11/30/201811/30/201811/30/2018PPART
DetailsJim Page
Final life fire safety inspection for Phase 5 TCO complete.

Request for TCO, Phase 5 of the TCO plan, Parking Garage. Please call adam when heading to site. Thanks.AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Final11/12/201811/13/201811/16/2018 DONE
DetailsDave Hannah
Requesting inspection for Phase 1 TCO plan final. Please coordinate with Adam for details prior to heading to site. ###-####. Thanks AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Final11/14/201811/14/201811/15/2018PPEND
DetailsDave Hannah
TCO Phase 1 inspection. Please call Adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Final11/15/201811/15/201811/15/2018APEND
DetailsDave Hannah
Items corrected and ready to review for phase 1. Late morning call Adam when heading to site. Thanks. Akj. Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Final11/15/201811/15/201811/15/2018PPART
DetailsDave Hannah
Items corrected and ready to review for phase 1. Late morning call Adam when heading to site. Thanks. Akj. Phone #: ###-#### Inspection requested via web by Adam Johnson phase one ok for tco
FIRE-Final Inspection11/15/201811/15/201811/15/2018APART
DetailsJim Page
Per conversations with Ron Johnson, Tim Frost and Lee Meridith items for phase 1 TCO complete.

Items corrected and ready to review for phase 1. Late morning call Adam when heading to site. Thanks. Akj. Phone #: ###-#### Inspection requested via web by Adam Johnson
FIRE-Final Inspection11/14/201811/14/201811/14/2018PFAIL
DetailsTroy Cobbley
see fire inspection comments in documents 11-14-18TCO Phase 1 inspection. Review items from walk yesterday with Ron. Please call Adam when heading to site. ###-####.Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
FIRE-Final Inspection11/12/201811/13/201811/14/2018PFAIL
DetailsAdele J Schaffeld-Griffin
see fire inspections in documents 11-13-18Requesting inspection for Phase 1 TCO plan final. Please coordinate with Adam for details prior to heading to site. ###-####. Thanks AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
FIRE-Conference11/9/201811/9/201811/9/2018PPASS
DetailsJim Page
Fire conference complete.

Scheduled meeting at 1PM for TCO plan
FIRE-Conference11/8/201811/8/201811/8/2018PDONE
DetailsJim Page
Fire conference complete, discussed corrective items before TCO.

Would like to review ESI''s TCO plan in the office. Also would like to walk Level 3,4 and 5 for Pre-Final walk. Please call me before heading to the site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference11/8/201811/8/201811/8/2018PDONE
DetailsDave Hannah
Would like to review ESI''s TCO plan in the office. Also would like to walk Level 3,4 and 5 for Pre-Final walk. Please call me before heading to the site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference10/24/201810/24/201810/25/2018PPASS
DetailsDave Hannah
Lobby hard lid drops at restroom and sales office. Call Adam when heading to site. Thanks AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Wall cover10/18/201810/19/201810/19/2018APASS
DetailsDave Hannah
Blown in insulation at the covered parking area, ready for inspection so we can cover. Call Adam with questions. Thanks akj Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference10/17/201810/17/201810/17/2018PPART
DetailsDave Hannah
Loft Units, 112, 114, 115. Also Lobby and corridor high soffits and beam wraps, call adam when heading to site.

Thanks akj Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference10/15/201810/16/201810/16/2018APART
DetailsMike Jordan
Soffits in loft units, 1st. floor, 3 units each on west and east sides of building. Noted areas still required fire stopping or need to be boxed out.
BLD-Conference10/14/201810/15/201810/15/2018ADEFR
DetailsBrandon Shaw
Review soffits in loft units. Review assemblies at lobby area. Please call Adam thank. AKJwhen heading to site. Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in10/9/201810/9/201810/9/2018PFAIL
DetailsDave Hannah
A handful of items to review on L1 sofits and lobby. Call Adam when heading to site. Thanks. Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference10/8/201810/9/201810/9/2018ACANC
DetailsDave Hannah
A handful of items to review on L1 sofits and lobby. Call Adam when heading to site. Thanks. Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference10/1/201810/1/201810/1/2018PPASS
DetailsDave Hannah
Please find Trevor to discuss a few items related to the project. Thanks. Akj. Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference9/26/20189/26/20189/27/2018PPASS
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Energy code compliance9/21/20189/24/20189/24/2018APASS
DetailsDave Hannah
1st floor lobby, ready for cover. Verify insulation per walk on Thursday with Adam. Call adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in9/20/20189/20/20189/20/2018PPART
DetailsDave Hannah
Lobby area, Detail walk required with Adam. Please call when heading to site.###-####, thanks akj Phone #: ###-#### Inspection requested via web by Adam Johnson ok to insulate
BLD-Conference9/18/20189/18/20189/18/2018PDONE
DetailsDave Hannah
Review firestop at carport parking, West of ramp. Ready to cover hard lids and patch insulation. Please call Adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference9/11/20189/12/20189/12/2018APASS
DetailsDave Hannah
Trevor and Adam would like to discuss a few different topics. Please call Adam when available to come to site. Thanks AKJ ###-####. Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Wall cover9/7/20189/7/20189/7/2018APASS
DetailsJim Sly
Inspection of fireproofing patch at future retail. Insulation complete ready to cover. Please call Adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in8/30/20188/30/20188/30/2018PPASS
DetailsDave Hannah
Review retail monakote patching in the retail space. Want to continue insulation at ceiling adjacent to these patches. A few other items may be available, please find Adam or Trevor when on site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in8/28/20188/28/20188/28/2018PPART
DetailsDave Hannah
Retail Space, Rough in inspection for insulate. Please notify adam when heading to site. Thanks. AKJ. Phone #: ###-#### Inspection requested via web by Adam Johnson ok to insulate
BLD-Framing/Rough-in8/27/20188/27/20188/27/2018PPASS
DetailsDave Hannah
Framing cover on 1st floor lofts that are ready. Coordinate with Adam when on site. AKJ ###-####.

Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in8/20/20188/23/20188/23/2018PPASS
DetailsDave Hannah
Adam-inspection is not for the plan mod Phone #: ###-####
BLD-Framing/Rough-in8/20/20188/22/20188/23/2018PPART
DetailsDave Hannah
Adam-inspection is not for the plan mod Phone #: ###-####
BLD-Framing/Rough-in8/16/20188/16/20188/17/2018PPART
DetailsDave Hannah
1st floor loft unit framing inspection. Looking to start insulation after MEC verification. Please call adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson ok nto insulate ext walls
BLD-Wall cover8/9/20188/13/20188/13/2018PPASS
DetailsDave Hannah
3rd floor soffits for cover. MEP inspections are on for AM Monday. Please call Adam before visiting site. Thanks, AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in8/10/20188/13/20188/13/2018APASS
DetailsDave Hannah
3rd floor soffits for cover. MEP inspections Were Completed Friday. Please call Adam before visiting site. Thanks, AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in8/1/20188/2/20188/2/2018APASS
DetailsDave Hannah
Reworked assemblies on remaining Level 4 soffits.

Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference7/30/20187/30/20187/31/2018PDONE
DetailsDave Hannah
Recap list for inspection needs. Coordinate with Adam when on site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in7/30/20187/31/20187/31/2018APART
DetailsDave Hannah
5th Floor Corridor Soffits, Confirmed and ready for cover.

4th Floor unit soffits, 416 to 410. In Progress with Firestop repairs. akj Phone #: ###-#### Inspection requested via web by Adam Johnson 5th floor only
BLD-Conference7/25/20187/25/20187/25/2018PPASS
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Framing/Rough-in7/19/20187/19/20187/19/2018PPASS
DetailsDave Hannah
Level 5 soffits, 12 to 15.
Level 2 draft stop at corridor.
Call Adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in7/17/20187/18/20187/18/2018APASS
DetailsDave Hannah
2nd floor south east units ready for cover inspection. 209 to 216.Call Adam when you are heading to site. Thanks. akj Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference7/17/20187/17/20187/17/2018PFAIL
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Framing/Rough-in7/16/20187/16/20187/16/2018PPASS
DetailsDave Hannah
Catch up from Friday. MEP inspections complete on Level 2, seeking approval to insulate. 5th floor pick up at soffit areas. Please call Adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in7/12/20187/13/20187/16/2018PPART
DetailsDave Hannah
Remaining units for soffit cover on Level 5, Rooms 17,18,19, 9, 11, 12, 13, 14, 15, 16.

Mike A. Is covering for Adam. Please call Mike, ###-####.

Thanks, AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in7/12/20187/12/20187/12/2018PPASS
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Framing/Rough-in7/9/20187/10/20187/10/2018ACANC
DetailsDave Hannah
Walk 3rd floor areas for areas ready to insulate. Please call Adam when heading to site. Thanks, AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson ok to insulate
BLD-Framing/Rough-in7/5/20187/5/20187/5/2018PPART
DetailsDave Hannah
Dave. Adam is out. Hope will walk with you. 3rd floor cover so we can insulate. Thanks. Akj Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Wall cover7/2/20187/3/20187/3/2018APASS
DetailsDave Hannah
4th floor insulation complete. Walk with Adam to verify draft stop and cover. Call Adam when heading to site. akj Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in6/27/20186/28/20186/29/2018APASS
DetailsDave Hannah
Area B cover inspection at 4th floor. Call Adam when heading to the site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson Phone #: ###-#### Inspection requested via web by Adam Johnson ok to insulate ext walls
BLD-Framing/Rough-in6/27/20186/27/20186/27/2018PCANC
DetailsDave Hannah
Area B cover inspection at 4th floor. Call Adam when heading to the site. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson Inspection cancelled from web by: Adam Johnson
BLD-Framing/Rough-in6/26/20186/27/20186/27/2018APART
DetailsDave Hannah
Framing Inspection, level 4. Call Adam when heading to site. Thanks, AKJ. Phone #: ###-#### Inspection requested via web by Adam Johnson see sign off sheet ok to insulate
BLD-Framing/Rough-in6/22/20186/25/20186/25/2018PPART
DetailsTony Young
4th Floor framing inspection, firestop OK, ready to insulate following AM MEP inspections passing. Whomever is covering for Hannah, please call Adam before heading to site. ###-####. Thanks akj Phone #: ###-#### Inspection requested via web by Adam Johnson,, 4TH FLOOR area A,, work in progress on fire caulking,, need to block at 10' on double walls,, ceiling/roof in 401 ok to foam,, ok to start insulation in exterior walls
BLD-Wall cover6/18/20186/20/20186/20/2018PNR
DetailsDave Hannah
Pre walk Level 4, prep for insulation, review of fire stop assemblies. . Call Adam when heading to site. akj 061818 Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Wall cover6/13/20186/20/20186/20/2018APASS
DetailsDave Hannah
Pre-walk level five west, Insulation complete, ready for inspection. MEP cover inspections in field binder for reference. Please call Adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Wall cover6/18/20186/19/20186/19/2018PPEND
DetailsDave Hannah
Continued walk of 5th floor. Areas of cover. Follow up to Fridays walk on a few key areas. Call Adam when heading to site. akj 061818 Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in6/13/20186/15/20186/18/2018PPASS
DetailsDave Hannah
Pre-walk level five west. In prep for pre insulate. Will be part Thursday, Part Friday. Please call Adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in6/13/20186/14/20186/14/2018PPEND
DetailsDave Hannah
Pre-walk level five west. In prep for pre insulate. Will be part Thursday, Part Friday. Please call Adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference6/4/20186/5/20186/5/2018APASS
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Conference5/30/20185/30/20185/30/2018PPASS
DetailsDave Hannah
Remaining shear inspection at North East and East Elevation, three up. Contact Adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference5/25/20185/25/20185/25/2018PPASS
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Conference5/23/20185/24/20185/24/2018PPASS
DetailsDave Hannah
Exterior Sheathing at North Elevation to level 3. Notes in office to discuss other topics. Draft Stop ect. Call Adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference5/23/20185/23/20185/23/2018PPART
DetailsDave Hannah
Request a late AM inspection of East elevation exterior nailing at shear-Pre Rock inspection. Call Adam before heading to site. Thanks akj Phone #: ###-#### Inspection requested via web by Adam Johnson ok up to level 3
BLD-Conference5/21/20185/22/20185/22/2018APASS
DetailsDave Hannah
Roof Inspection, Nailing and straps, west side of roof. Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference5/9/20185/10/20185/10/2018APASS
DetailsDave Hannah
Adam Phone #: ###-#### ok to cover south ext wall
BLD-Conference5/1/20185/2/20185/3/2018PPART
DetailsDave Hannah
Adam Phone #: ###-#### sear west side ok
BLD-Conference4/26/20184/27/20184/27/2018ADONE
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Conference4/17/20184/18/20184/18/2018PPART
DetailsDave Hannah
Inspection of 1st floor shear walls at exterior. Also inspection on 2nd floor Earthbound devices in the pre rock areas as discussed Tuesday. Supplemental information from Engineer available in the office. Please contact Adam when available to visit site. Phone #: ###-#### Inspection requested via web by Adam Johnson more first floor shear and 4 holds on 2and 3 floor the ones in the wall behind showers ok pens pulled
BLD-Conference4/16/20184/17/20184/17/2018PPART
DetailsDave Hannah
Adam Phone #: ###-#### shear wall on first floor south side of bldg
BLD-Conference4/11/20184/12/20184/12/2018AFAIL
DetailsDave Hannah
Andrew Phone #: ###-#### shear on first floor
BLD-Conference4/3/20184/4/20184/5/2018PDONE
DetailsDave Hannah
Adam-Adam says this has nothing to do with the plan mod that''s in the office Phone #: ###-####
BLD-Conference3/28/20183/29/20183/29/2018PDONE
DetailsDave Hannah
Adam-doesn''t have anything to do with the plan mod that''s in for review Phone #: ###-####
BLD-Conference3/22/20183/22/20183/23/2018PDONE
DetailsDave Hannah
Adam-pleae call when on way so Adam can meet you for the conference Phone #: ###-####
BLD-Conference3/22/20183/22/20183/22/2018ACANC
DetailsDave Hannah
Adam-pleae call when on way so Adam can meet you for the conference Phone #: ###-####
BLD-Conference3/21/20183/21/20183/22/2018PCANC
DetailsDave Hannah
Adam-pleae call when on way so Adam can meet you for the conference Phone #: ###-####
BLD-Conference3/8/20183/9/20183/9/2018PDONE
DetailsDave Hannah
12:30 Conference as requested by KPFF to review structural framing, ASI 10 per City Review. Meeting at 5th and Idaho conference room. Please call Adam with any questions.. ###-####. akj Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference3/9/20183/9/20183/9/2018ADONE
DetailsDave Hannah
12:30 Conference as requested by KPFF to review structural framing, ASI 10 per City Review. Meeting at 5th and Idaho conference room. Please call Adam with any questions.. ###-####. akj Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference3/8/20183/8/20183/8/2018PDONE
DetailsDave Hannah
Walk 2nd floor framing. Review a few things with Trevor and Adam. Please call Adam when heading to site. ###-####. akj Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in2/28/20182/28/20183/1/2018APART
DetailsDave Hannah
Framing walk 2nd floor. Ongoing. Call Adam when heading to site. Thanks. Akj Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference2/27/20182/27/20182/28/2018PCANC
DetailsDave Hannah
Framing walk 2nd floor. Ongoing. Call Adam when heading to site. Thanks. Akj Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference2/19/20182/20/20182/20/2018APART
DetailsDave Hannah
Framing shear inspection at 2nd floor walls. Call Adam when in route. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson crew working on second floor .
BLD-Conference2/12/20182/15/20182/16/2018ADONE
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Conference1/29/20181/29/20181/29/2018PDONE
DetailsDave Hannah
Status update of project. Framing review. On site conference request. Call Adam when heading to site. ###-####. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference12/20/201712/21/201712/21/2017ADONE
DetailsDave Hannah
Framing Pre-Construction meeting at 11:00 AM. We will meet in the conference room atop wise guys. Call Adam with any questions. Thanks. akj Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference11/27/201711/27/201711/27/2017PDONE
DetailsDave Hannah
Dave, Please call Adam, ###-####. thanks. akj Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference10/20/201710/26/201710/26/2017ADONE
DetailsDave Hannah
Request for Dave Hannah attendance to PT PreCon Meeting, 5th and Idaho Subcontractor conference room. Meeting at 10:30. Call Adam for details, ###-####.
Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference10/23/201710/24/201710/24/2017ADONE
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Conference10/2/201710/3/201710/3/2017ADONE
DetailsDave Hannah
Adam Phone #: ###-####