Information based on query as of Sunday, April 28, 2024.
Permit Information
Permit NumberBLD18-02795
StatusFinaled
Name PETRA INC
Site Address 12251 W FRANKLIN RD
Project NameFloor Trader Outlet
Customer Number 
ePlanReviewYes
Description
(CJD INVESTMENTS, DBA FLOOR TRADER OUTLET) //Plan modification to remove select pavement from scope of site work on the south lot 2 until south lot is developed. 6-17-2019 JG// Permit to construct a new 36,532 sq. ft. two story building (23,503 sq. ft. 1st story and 11,227 sq. ft. 2nd story) and related site improvements. Approval is contingent upon adhering to the approved plans on file, attached engineering and plan review report. Scope of work includes: construction of footing foundation, slab on grade concrete floor, construction of concrete tilt-up exterior envelope walls, open web steel roof joists, membrane roof assembly, construction of interior bearing CMU walls to create an office and a retail area with a storage mezzanine area above, construction of interior non-bearing walls to create (6) offices, a break room, fire riser room, a janitors closet and (4) accessible restrooms, new Hi/Lo drinking fountain, a new elevator, new elevator equipment room, millwork, new suspended acoustic and gypsum ceilings, light fixtures, electrical work, plumbing work, mechanical work and interior finishes to be in compliance with Ch. 8 of the current IBC. Note 1: Special inspection required see attached 310 form. Note 2: Racking/Shelving over 8’ requires a separate racking permit. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/18/20197/19/20197/19/2019APASS
DetailsMike Jordan
Chad Phone #: ###-####
BLD-Final7/2/20197/8/20197/8/2019PCANC
DetailsMike Jordan
Frankie-elevator only Phone #: ###-####
FIRE-Final Inspection7/2/20197/5/20197/5/2019PPASS
DetailsTroy Cobbley
life safety passed

Frankie-elevator only Phone #: ###-####
FIRE-Final Inspection7/3/20197/3/20197/3/2019PPASS
DetailsTroy Cobbley
Life safety passed.

Franky Phone #: ###-####
BLD-Final6/19/20196/20/20196/20/2019APASS
DetailsMike Jordan
Franky- Phone #: ###-####. OK for temp occ. Will be ok or perm occ. once trades sign perm.
FIRE-Final Inspection6/18/20196/19/20196/19/2019APART
DetailsTroy Cobbley
A temporary for life safety is ok with Chief Ron's permission until the elevator has been installed and tested. Chad Phone #: ###-####
BLD-Final6/11/20196/11/20196/11/2019PCANC
DetailsMike Jordan
BLD-Conference6/11/20196/11/20196/11/2019PDONE
DetailsMike Jordan
Walk through. Needs to complete fire caulking and lower breakroom counter. for ADA.
BLD-Final6/10/20196/11/20196/11/2019ACANC
DetailsMike Jordan
Chad Phone #: ###-####
FIRE-Final Inspection6/7/20196/7/20196/7/2019PFAIL
DetailsTroy Cobbley
Provide sign offs for the project related fire sprinkler and fire alarm permits, Provide emergency light for the Fire Pump Room, Provide testing/inspection for the elevator, Provide singage for the Fire Pump/Riser Room.

Chad- Phone #: ###-####
FIRE-Conference5/24/20195/24/20195/24/2019PDONE
DetailsTroy Cobbley
Chad and I spoke about fire dept signage, addressing and inspection scheduling for fire pump certification.
BLD-Ceiling Grid Inspection5/23/20195/23/20195/23/2019PPASS
DetailsMike Jordan
Chad Phone #: ###-####. 1st. floor ceiling grid ok.
BLD-Framing/Rough-in5/10/20195/13/20195/13/2019APASS
DetailsMike Jordan
Chad Phone #: ###-####. fireblocking around duck work at 2nd. floor penetrations.
BLD-Framing/Rough-in5/1/20195/2/20195/2/2019APART
DetailsJim Sly
chad Phone #: ###-####
Roof screenwall framing.....OK.
BLD-Wall Bracing5/1/20195/1/20195/1/2019PFAIL
DetailsMike Jordan
chad Phone #: ###-####Steel stud framing for screen walls on roof. Needs to provide more screws as per the approved plans.
BLD-Wall cover4/30/20194/30/20194/30/2019PPART
DetailsDave Hannah
Chad Phone #: ###-#### inter layer of sheet rock at stairs ok
BLD-Framing/Rough-in4/29/20194/29/20194/29/2019PPASS
DetailsMike Jordan
chad Phone #: ###-####. Interior steel stud framed walls 1st. floor ok.
BLD-Foundation4/9/20194/10/20194/10/2019APASS
DetailsMike Jordan
rebar Phone #: ###-####. Reinforcement for interior slab on grade at 2nd floor.
FIRE-Conference4/5/20194/9/20194/9/2019ADONE
DetailsTroy Cobbley
Chad and I went over fire extinguisher placement, knox box location (deferred to Fire Dept), fire pump room requirements and sprinkler obstructions and small safety factor for the overhead system.

Chad Phone #: ###-####
FIRE-Conference4/4/20194/5/20194/5/2019ACANC
DetailsJim Page
Rescheduled conference for 09APR2019 per conversation with point of contact.

Chad Phone #: ###-####
BLD-Conference4/2/20194/3/20194/3/2019ADONE
DetailsMike Jordan
Chad ###-####
BLD-Other3/29/20194/1/20194/1/2019APART
DetailsMike Jordan
welding for mezzanine // Chad Phone #: ###-####. Work in progress on puddle welds on mezz. decking. Ok for concrete pending special inspection.
BLD-Foundation3/18/20193/19/20193/19/2019ACANC
DetailsMike Jordan
rebar // chad Phone #: ###-####
BLD-Concrete3/7/20193/7/20193/7/2019PPART
DetailsMike Jordan
Chad- Rebar inspction Phone #: ###-####. Cmu wall, FF to 4ft. elevation. Ok pending special inspection.
BLD-Foundation3/4/20193/4/20193/4/2019PDEFR
DetailsMike Jordan
masonry rebar // Chad Phone #: ###-####
BLD-Foundation2/28/20193/1/20193/1/2019APART
DetailsMike Jordan
Chad Phone #: ###-####. MAsonry elevator shaft, top of stemwall to 4ft. elevation. Will do hight lift, cleanouts ok, engineer of record ok. Ok pending special inspection.
BLD-Other2/25/20192/26/20192/26/2019ADEFR
DetailsMike Jordan
welding // Chad Phone #: ###-####.
BLD-Foundation2/19/20192/20/20192/20/2019PCANC
DetailsMike Jordan
rebar - pouring at 2pm // Chad Phone #: ###-####
BLD-Foundation1/30/20191/31/20191/31/2019PPART
DetailsMike Jordan
Chad Phone #: ###-####. Work in progress on rebar for tilt panels. Engineer of record to provide RFI for panels #27 and #29 noting in place reinforcement is ok. Special inspector on site. ok to place concrete pending special inspection.
BLD-Foundation1/29/20191/30/20191/30/2019PPART
DetailsMike Jordan
Chad Phone #: ###-####. Panels 22 through 30. panels 27 and 29 rebar is incorrect. Ok to place concregte pending special inspection.
BLD-Footing12/20/201812/20/201812/20/2018PPART
DetailsMike Jordan
Chad-footings & panel Phone #: ###-#### Work in progress. Special inspector on site. Ok to place concrete pending special inspection.
BLD-Foundation12/14/201812/14/201812/14/2018PDEFR
DetailsMike Jordan
rebar // Chad Phone #: ###-####
BLD-Foundation12/12/201812/13/201812/13/2018PPASS
DetailsMike Jordan
rebar // chad Phone #: ###-####. Panels 1,2,3,4,5 and 6 ok.
BLD-Other12/5/201812/5/201812/5/2018PPART
DetailsDave Hannah
rebar // Chad Phone #: ###-#### wire mess ok
BLD-Foundation11/8/201811/9/201811/9/2018PPART
DetailsMike Jordan
Chad=-slab Phone #: ###-####. Work in progress on interior thickend footings and interior slab on grade. Will have special inspection.
BLD-Foundation11/8/201811/8/201811/8/2018PCANC
DetailsMike Jordan
Chad-slab-would like as late as possible Phone #: ###-####
BLD-Foundation11/1/201811/1/201811/1/2018PPASS
DetailsMike Jordan
rebar // Chad Phone #: ###-####. Interior and exterior column pad footings.