Information based on query as of Monday, April 29, 2024.
Permit Information
Permit NumberBLD18-03122
StatusFinaled
Name BILTMORE COMPANY
Site Address 11715 W KING ST
Project NameFairview Apartments - Bldg 3
Customer Number 
ePlanReviewYes
Description
(FAIRVIEW APARTMENTS) (BLDG 3) (DRH17-00532) (GRD18-00035) Permit for the construction of Building 3, a 27,059 sq ft, 3-story, 24-unit apartment building. This building is one of six buildings within a multi-family development, which includes (3) three-story, 24-unit multi-family buildings and (3) two-story, 8-unit buildings for a total of 96 units on the site. Work to include general site work and the construction of the new building per the approved plans. Special Inspections required per attached Form 310. All buildings are to be fully fire sprinklered with an NFPA 13-R system as required for residential occupancy and story increase. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/24/201910/24/201910/24/2019PPASS
DetailsTell Riley
PATT Phone #: ###-####//corrections made//window opening devices installed on windows under 36" sill--only a couple units//all other required inspections complete--verified online//signed card for all units//
BLD-Final10/23/201910/23/201910/23/2019PNR
DetailsTell Riley
Pat Phone #: ###-####//need to fire caulk around furnaces// need to adjust door hinge springs//
FIRE-Final Inspection10/22/201910/22/201910/22/2019PPASS
DetailsTroy Cobbley
Life safety passed.

Matt Phone #: ###-####
FIRE-Final Inspection10/18/201910/21/201910/21/2019AFAIL
DetailsTroy Cobbley
The smoke alarm in 102 still has not been relocated.

Matt Phone #: ###-####
FIRE-Final Inspection10/18/201910/18/201910/18/2019PPART
DetailsTroy Cobbley
Life safety on units 101 202 203 302 303 103 104 203 204 303 304 is complete. 102 had a smoke alarm too close to the restroom door. // Matt ###-####
BLD-Final10/18/201910/18/201910/18/2019PPART
DetailsTell Riley
partial final for apartments 105, 106, 205, 206, 305 and 306// Matt ###-####//the six listed above ok for temp occupancy//
FIRE-Final Inspection10/14/201910/15/201910/15/2019APART
DetailsTroy Cobbley
Life safety passed for apartments 105, 106, 205, 206, 305 and 306.

matt Phone #: ###-####
FIRE-Final Inspection10/10/201910/10/201910/10/2019PPART
DetailsTroy Cobbley
Life safety passed for apartments 107,108, 207, 208, 307 and 308.- Pat Phone #: ###-####
BLD-Energy code compliance9/10/20199/10/20199/10/2019PPASS
DetailsTell Riley
mATT Phone #: ###-####//last six units//101,102,201,202,301,303//ok to cover//
FIRE-Final Inspection9/6/20199/9/20199/9/2019AFAIL
DetailsJim Page
As noted in Troy Cobbleys entry on the 29AUG2019 inspection request, tenting inspection for fire sprinklers needs to be requested under the associated FIR permit, not the BLD permit.

tinting.... last six // Pat Phone #: ###-####
BLD-Framing/Rough-in9/6/20199/6/20199/6/2019PPASS
DetailsTell Riley
pat Phone #: ###-####/last six units ok to insulate//will check minor corrections at insulation inspection//
BLD-Energy code compliance8/30/20199/3/20199/3/2019APART
DetailsTell Riley
Matt Phone #: ###-####//corrections made//ok to cover//fire sprinklers were approved per troy//103,104,203,204,303,304//
BLD-Other8/28/20198/29/20198/29/2019AFAIL
DetailsTroy Cobbley
Wrong inspection number scheduled. Should be a FIR. Tenting is not approved. tenting // Pat Phone #: ###-####
BLD-Framing/Rough-in8/27/20198/28/20198/28/2019APART
DetailsTell Riley
Matt Phone #: ###-####//corections onsite//ok to insualate walls only//need tenting and sprinkler inspection prior to energy inspection//do not cover or insulate any sprinklers or associated piping//103,104,203,204,303,304//
BLD-Energy code compliance8/20/20198/21/20198/21/2019PPART
DetailsTell Riley
Matt- Phone #: ###-####//105,106,205,206,305,306//
BLD-Framing/Rough-in8/16/20198/19/20198/19/2019APASS
DetailsTell Riley
2nd six // Pat Phone #: ###-####//framing for 105.106.205.206.305.306//add bearing blocks under trusses//ok to insulate//
BLD-Energy code compliance8/8/20198/8/20198/9/2019PPASS
DetailsTell Riley
Matt Phone #: ###-####//framing corrections made//107,108,207,208,307,308 only//
BLD-Framing/Rough-in8/6/20198/6/20198/6/2019PPART
DetailsTell Riley
Pat Phone #: ###-####//first six 7's and 8's ok to insulate//get fire sprinkler rough prior to insulation//check list of corrections with Pat onsite.//
BLD-Wall Bracing6/18/20196/18/20196/18/2019PPASS
DetailsTell Riley
shear // bill Phone #: ###-####//shear nailing and holddowns ok per plans//
BLD-Foundation3/18/20193/19/20193/19/2019PPASS
DetailsJim Sly
Dane Phone #: ###-####
BLD-Foundation3/15/20193/18/20193/18/2019PPASS
DetailsMike Jordan
Dane Phone #: ###-####
BLD-Footing3/13/20193/14/20193/14/2019PPASS
DetailsJim Sly
Dane Phone #: ###-####
BLD-Footing3/13/20193/14/20193/13/2019APASS
DetailsDave Hannah
Dane Phone #: ###-####