Permit Information
Permit NumberBLD19-04013
StatusIssued
Name BILTMORE COMPANY
Site Address 5892 N FIVE MILE RD
Project NameNorthview Apts Bldg 1
Customer NumberBLD19-04008 FOUNDATION
ePlanReviewYes
Description
(NORTHVIEW APARTMENTS)(BLDG. 1) //6-1-2020 PLAN MODIFICATION #2 REVISED MANUAL J, D AND S REVISED. Jg// - //3-11-2020 PLAN MODIFICATION #1 FOR A CLARIFICATION ON THE FIRE PARTITION ASSEMBLIES AT THE INTERIOR SHEAR WALLS. Jg// Permit for the construction of a 27,096 sq. ft., 3-story, 24-unit apartment building. (Note: this is a building only permit and the foundation only permit is found under BLD19-04008). Work to include general site work and the construction of the new building per the approved plans and attached engineering. Note: Special Inspections required see form 310. This building is to be fully fire sprinklered with a NFPA 13-R system as required for residential occupancy and story increase. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection8/7/20208/10/20208/10/2020ACANC
DetailsTroy Cobbley
Need the project related fire alarm and fire sprinkler permits finaled prior to a life safety inspection. ]
crrened- Matt Phone #: ###-####
BLD-Energy code compliance7/20/20207/20/20207/20/2020PPART
DetailsTell Riley
Matt *screened* Phone #: ###-####//ok pending tenting approval for fire sprinklers prior to cover//
BLD-Framing/Rough-in7/16/20207/17/20207/17/2020APART
DetailsTell Riley
Matt - */Screened*/ Phone #: ###-####last two units first floor//add blocking between joists a bearing wall//ok to insulate//
BLD-Framing/Rough-in7/16/20207/16/20207/17/2020PPART
DetailsDave Hannah
Screened- Mat- call before arrival Phone #: ###-#### 2econ and third floors ok insulate
BLD-Energy code compliance7/15/20207/15/20207/15/2020PPART
DetailsTell Riley
SCREENED // Matt Phone #: ###-####//3rd set of 6 from east end//2 top units still need tenting inspection//other 4 units appear to be ok//
BLD-Framing/Rough-in7/10/20207/13/20207/13/2020APASS
DetailsTony Young
screened // Pat Phone #: ###-####// ok to insulate//
BLD-Framing/Rough-in7/8/20207/8/20207/8/2020PFAIL
DetailsTell Riley
Matt - /*screened*/ Phone #: ###-####//corrections have not been completed to meet plans and specifications//See Matt onsite for CN//
BLD-Framing/Rough-in7/7/20207/8/20207/8/2020ANR
DetailsTell Riley
Matt - /*screened*/ Phone #: ###-####//corrections are not complete//moved to PM//
BLD-Framing/Rough-in7/6/20207/6/20207/6/2020PFAIL
DetailsTell Riley
SCREENED // Matt Phone #: ###-####//2nd six units still need corridor fire wall to meet listing on plans//3rd six units correction notice issued for framing corrections, see Matt onsite for list--also corridor fire wall on these six units needs to meet listing on plans//
BLD-Wall cover6/30/20206/30/20207/1/2020PCANC
DetailsTell Riley
screened // Matt Phone #: ###-####
BLD-Wall cover7/1/20207/1/20207/1/2020PPART
DetailsTell Riley
areas in fire wall to roof deck over center stairways were filled with gyp board and penetrations fire caulked//this was verified by photos sent by contractor//
BLD-Energy code compliance6/26/20206/29/20206/29/2020APART
DetailsTell Riley
ok to cover units 2nd six from east end areas not affected by CN//CN issued for fire wall 1 hr at corridor--does not refelct listing as it current create a cavity above panty areas, fire caulk penetrations//note see detail C3 for corridor ceiling 1 hr construction//
BLD-Energy code compliance6/25/20206/26/20206/26/2020ACANC
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Matthew Bundy
BLD-Wall cover6/23/20206/23/20206/23/2020PPART
DetailsTell Riley
Matt Phone #: ###-#### Inspection requested via web by Matthew Bundy//6 units on west end for fur-downs only//framing in these areas ok//pending trades inspections//fire caulk as discussed//
BLD-Framing/Rough-in6/23/20206/23/20206/23/2020PPART
DetailsTell Riley
Matt Phone #: ###-#### Inspection requested via web by Matthew Bundy//2nd six units east end//see CN onsite//ok ot insulate only//corrections will need completed prior to cover//
BLD-Energy code compliance6/17/20206/17/20206/17/2020PPART
DetailsTell Riley
Matt *screened* Phone #: ###-####//107, 108,207,208,307,308// energy requirements updated by designer via res check//attic insulation in these units will Be r50//fire caulk complete//
BLD-Energy code compliance6/15/20206/16/20206/16/2020AFAIL
DetailsTell Riley
screened // Matt Phone #: ###-####//label fire walls in attic--fire caulk penetrations//wall insulation does not meet rescheck//window u-values do not meet rescheck//1 hour rated laydown parapet was not installed for 4' from separation walls at deck//need fire sprinkler tenting inspection//
BLD-Framing/Rough-in6/11/20206/12/20206/12/2020APART
DetailsBrandon Shaw
Units 107,108, 207, 208, 307, 308
BLD-Wall cover6/11/20206/11/20206/11/2020PPART
DetailsTell Riley
screened // Matthew Phone #: ###-####//3rd 6 units 2nd floor drops--corrections made//architect approved fire blocking fix for first 4 2nd floor drops//remaining drops will have gyp on walls//
BLD-Wall cover6/3/20206/3/20206/3/2020PPART
DetailsTell Riley
screened // Matt Phone #: ###-####//3rd set of 2nd floor units for pre-rock areas//need to fire caulk areas discussed//looked at gyp on first 4 units--need to extend down walls on rated wall side and exterior walls, or provide detail from architect//
BLD-Wall cover6/2/20206/3/20206/3/2020ACANC
DetailsTell Riley
screened // Matt Phone #: ###-####//moved to pm//no one onsite//
BLD-Wall Bracing5/21/20205/22/20205/22/2020APASS
DetailsBrandon Shaw
screened// exterior shear and fire caulk 2nd fix fir down// Pat Phone #: ###-####
BLD-Other5/19/20205/19/20205/19/2020PPART
DetailsTell Riley
rough to cover .. screened // Matt Phone #: ###-####//2nd floor east end 2 apartments//cover ceiling for fur downs only//
BLD-Wall Bracing5/18/20205/18/20205/18/2020PFAIL
DetailsTell Riley
Matt *screened* Phone #: ###-####//Still need RFI for densglass shear walls in corridors//plans show all shear walls to be wood structural panels, and plans do not have nailing or shear schedule for densglass//
BLD-Wall Bracing5/11/20205/12/20205/12/2020AFAIL
DetailsTell Riley
Matt Phone #: ###-####//CN issued see onsite//
BLD-Other5/8/20205/8/20205/8/2020PCANC
DetailsTell Riley
rough to cover // Matt Phone #: ###-####//not ready, need to have rough ins inspected in areas wanting to cover for soffits//
BLD-Wall Bracing4/16/20204/17/20204/17/2020PPART
DetailsDave Hannah
Screened- Matt Phone #: ###-#### thrid floor int sheer walls ok to cover
BLD-Wall Bracing4/3/20204/3/20204/3/2020PPART
DetailsTell Riley
*cleared* Please call ahead so site can cleared Pat Phone #: ###-####///second story interior shear walls prior to gyp cover//
BLD-Wall Bracing3/19/20203/20/20203/20/2020APART
DetailsTell Riley
please call .... shear // Pat Phone #: ###-####/interior shear on level one ok to cover with gyp//
BLD-Framing/Rough-in2/18/20202/18/20202/18/2020PFAIL
DetailsTell Riley
Pat - Sheer Wall Inspection Phone #: ###-####//interior fire walls and shear walls--do not meet specifications on plans for UL assembly and sound//discussed with contractor UL assembly per plans and shear walls per structurals//
FIRE-Final Inspection8/13/20208/14/2020 A 
DetailsJim Page
Matt *screened Phone #: ###-####