General Inspection | 2/22/2018 | 2/22/2018 | 2/23/2018 | | PASS |
Andy J. Long
|
|
|
Temporary BMPs for project have been removed. Construction activity at SW corner of 11th and Myrtle is covered under JUMP permit, ESC12-00403
|
DOC - Permit Finaled | 2/23/2018 | 2/23/2018 | 2/23/2018 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 1/22/2018 | 1/22/2018 | 1/22/2018 | | PASS |
Michael Zawacki
|
|
|
Site walk through. Area is stabalized and landscaping is complete. Area in center is fenced off but there is no work or ground disturbances. Currently no active construction on site.
|
General Inspection | 12/21/2017 | 12/21/2017 | 12/26/2017 | | PASS |
Michael Zawacki
|
|
|
Site walkthrough. Area of project is fenced off but no work going on. No exposed areas at time. Ground is snow covered. Eco melt deicer is being used throughout project. The base is beet pulp and salt, looks dirty and smells bad but is harmless. Area is functioning corporate office and is clean and well maintained. No violations have been observed prior to walkthrough. Very central location that is passed by inspectors and observed every day.
|
General Inspection | 11/20/2017 | 11/20/2017 | 11/20/2017 | | PEND |
Andy J. Long
|
|
|
awaiting for all construction activities to be completed at SW corner of JUMP & SWHQ. Staging and former laydown areas should be cleaned/de-mobilized and stabilized as necessary.
|
General Inspection | 10/19/2017 | 10/19/2017 | 10/26/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/18/2017 | 9/18/2017 | 9/19/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/17/2017 | 8/17/2017 | 8/18/2017 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 7/17/2017 | 7/17/2017 | 7/17/2017 | | PASS |
Andy J. Long
|
|
|
WIP on SW corner of JUMP plaza at 11th & Myrtle. Staging areas still being utilized by Hoffman at 13th (between Connector on-ramps) and SE corner of 11th & Myrtle. No trackout or discharges in construction areas. No corrections requested.
Will need to clean up all staging areas before ESC permit can be finaled.
|
General Inspection | 6/15/2017 | 6/15/2017 | 6/15/2017 | | PASS |
Andy J. Long
|
|
|
WIP on courtyard structures, paths and landscaping. Building is complete and occupied. Will keep open to ensure areas are cleaned and staging areas south of Myrtle and west of 13th are cleaned. NO immediate corrections.
|
General Inspection | 5/15/2017 | 5/15/2017 | 5/15/2017 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 4/14/2017 | 4/14/2017 | 4/18/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/14/2017 | 3/14/2017 | 3/15/2017 | P | PEND |
Andy J. Long
|
|
|
Vertical construction of SWHQ is complete, with much of the building occupied. Some site improvements, landscaping, and final clean up remains. No active construction at time of inspection, construction access is at 11th & Myrtle. Temporary MS4 inlet protect around Front, Myrtle, 11th, & 9th has been removed.
Correction needed:
- need to address clean up of concrete washout and debris in offsite laydown area #3 west of 13th Street
|
General Inspection | 2/20/2017 | 2/20/2017 | 2/21/2017 | | CANC |
Melissa Jannusch
|
|
|
Holiday
|
General Inspection | 1/19/2017 | 1/19/2017 | 1/26/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/19/2016 | 12/19/2016 | 12/19/2016 | | PASS |
Andy J. Long
|
|
|
No trackout from construction access on 11th and Myrtle. WIP on SWHQ courtyard area. No discharges or runoff occuring.
|
General Inspection | 11/17/2016 | 11/17/2016 | 11/21/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/17/2016 | 10/17/2016 | 10/17/2016 | | PASS |
Andy J. Long
|
|
|
Vertical and interior construction in progress. Buildig footprint complete. WIP on Simplot HQ and Jump plaza area, no significant trackout or muddy runoff observed. MS4 inlets around site still have sediment filter bags installed.
Note: JUMP final ESC12-00403 should include removing DI bags on 9th Street @ Myrtle and Front, and full perimeter sweep including staging & parking areas
|
General Inspection | 9/15/2016 | 9/15/2016 | 9/16/2016 | | PASS |
Andy J. Long
|
|
|
Vertical construction and plaza work in progress. No spills or discharges exitiing site, no significant trackout.
|
General Inspection | 8/15/2016 | 8/15/2016 | 8/16/2016 | | PASS |
Andy J. Long
|
|
|
Vertical construction in progress. Some trackout from site to Myrtle occurs but is swept periodically. DI bags installed. No discharges or major trackout occuring. No complaints received
|
General Inspection | 7/14/2016 | 7/14/2016 | 7/14/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 6/13/2016 | 6/13/2016 | 6/13/2016 | | PASS |
Evan Jenkins
|
|
|
Construction near completion. Minor earth work occuring in center of project. No sediment leaving the site at this time.
|
General Inspection | 5/12/2016 | 5/12/2016 | 5/12/2016 | | PART |
Andy J. Long
|
|
|
Vertical construction in progress. No significant trackout and no discharges or spills observed coming from site.
Correction request: - sweep gutters on Myrtle and 11th street to remove loose sediment and sand tracked from site.
|
General Inspection | 4/11/2016 | 4/11/2016 | 4/11/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/10/2016 | 3/10/2016 | 3/10/2016 | | PART |
Andy J. Long
|
|
|
WIP. No major trackout. Strom drains have sediment bags. Need to sweep gutters on Myrtle to east of construction area entrance by the JUMP.
|
General Inspection | 2/8/2016 | 2/8/2016 | 2/8/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 1/7/2016 | 1/7/2016 | 1/7/2016 | | PASS |
Evan Jenkins
|
|
|
Computer Issues: Inspection was performed in mid afternoon. No ESC issues observed at that time
|
General Inspection | 12/7/2015 | 12/7/2015 | 12/7/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: no trackout observed. Only vertical construction occuring at this time
|
General Inspection | 11/6/2015 | 11/6/2015 | 11/9/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: No issues observed at this time. Vertical construction currently taking place
|
General Inspection | 10/5/2015 | 10/6/2015 | 10/6/2015 | P | PASS |
Andy J. Long
|
|
|
WIP. Perimeter is barricaded and surrounded by curbing. Vertical frame work is in progress. No significant trackout from site or laydown yards observed. No corrections issued.
|
General Inspection | 10/5/2015 | 10/5/2015 | 10/5/2015 | | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 9/3/2015 | 9/3/2015 | 9/3/2015 | | PASS |
Evan Jenkins
|
|
|
Verticle Construction still occuring. No trackout nor other ESC issues at this time
|
General Inspection | 8/3/2015 | 8/3/2015 | 8/3/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: no violations observed during inspection
|