Permit Information
Permit NumberESC15-00871
StatusFinaled
Name CHAD OLSEN
Site Address 7955 W PREECE DR
Project NameImperial Acres
Customer Number 
ePlanReviewNo
Description
(IMPERIAL ACRES - TOWNE POINTE 4 PLEXES) - Grading permit to excavate, grade and compact site earth materials in preparation for a new townhome buildings to be constructed.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final4/12/20174/14/20174/13/2017PPASS
DetailsAndy J. Long
check that MS4 has has DI bag removed on south side of Preece.

DI bag removed. Apartments stabilized. ESC permit conditions satisfied.
General Inspection4/12/20174/12/20174/12/2017 PEND
DetailsAndy J. Long
verbal request to RP Chad to remove DI bag from MS4 on south side of Preece in front of project...

Agreed, will be ready for site final by Friday.
General Inspection3/28/20173/28/20173/28/2017 PEND
DetailsAndy J. Long
General Inspection3/13/20173/13/20173/13/2017 CANC
DetailsAndy J. Long
General Inspection2/24/20172/24/20172/24/2017 PEND
DetailsAndy J. Long
Construction and stabilzation complete. Need to remove temporary DI bags from two MS4 inlets on street before ESC final. Notify RP Chad next inspection.
General Inspection2/9/20172/9/20172/9/2017 CANC
DetailsAndy J. Long
General Inspection1/25/20171/25/20171/27/2017 CANC
DetailsAndy J. Long
General Inspection1/10/20171/10/20171/11/2017 CANC
DetailsAndy J. Long
General Inspection12/26/201612/26/201612/28/2016 CANC
DetailsAndy J. Long
Site Final12/2/201612/9/201612/14/2016ACANC
DetailsAndy J. Long
General Inspection12/2/201612/2/201612/2/2016 CANC
DetailsAndy J. Long
rescheduled for site final
General Inspection11/17/201611/17/201611/17/2016 PASS
DetailsAndy J. Long
All multifamily buildings now complete. Final site improvements of landscaping and clean up are in progress. Onsite drainage facilities are installed, cleaned, and stabilized.

RP onsite, will call for Site Final inspection in December. Note , the 6 seperate ESC permits have been finaled.
General Inspection11/2/201611/2/201611/3/2016 CANC
DetailsAndy J. Long
General Inspection10/14/201610/18/201610/17/2016APASS
DetailsAndy J. Long
General Inspection10/13/201610/13/201610/14/2016 CANC
DetailsAndy J. Long
General Inspection9/28/20169/28/20169/28/2016 PART
DetailsAndy J. Long
Preece Street is clean, sediment bag installed. RP Chad onsite. Canal bank is stabile and vegetated with volunteer plants, no work or stockpiling in area.

RP stated site trash containers are being hauled offsite. Requested that onsite infiltration swale have sediment protection at inlet to prevent from clogging. Further work and grooming is required on installation, but RP stated he will install a sediment barrier and clean around inlet area.
General Inspection9/13/20169/13/20169/13/2016 PASS
DetailsEvan Jenkins
work in progress
General Inspection8/29/20168/29/20168/29/2016 PART
DetailsEvan Jenkins
sweep preece dr.
verbal warning to RP Chad
General Inspection8/12/20168/12/20168/12/2016 PASS
DetailsEvan Jenkins
streets/currbs/streets have been swept. Trash has been removed. As of now, contractors are meeting ESC requirements
BMP Violation7/27/20167/28/20167/28/2016APASS
DetailsAndy J. Long
RP swept entire sidewalk frontage, parking lot entrance apron, gutters, and emptied out material in DI bag. Trash and mateials within site was put inside dumpsters.

Approved, corrections complete.
BMP Violation7/27/20167/27/20167/27/2016ACANC
DetailsAndy J. Long
data entry error, should be for 7/28
General Inspection7/27/20167/27/20167/27/2016 FAIL
DetailsAndy J. Long
Loose sediment, dirt, gravel and unprotected stockpiles stored on pavement with potential to runoff site with stormwater. No housekeeping has occured this week.

Verbal CN to Chad to have hard surfaces swept, in particular the sidewalk and gutter on Preece.

RP stated it will be swept and cleaned tonight. Follow up inspection scheduled for tommorrow
General Inspection7/12/20167/12/20167/12/2016 PASS
DetailsAndy J. Long
General Inspection6/27/20166/27/20166/27/2016 PASS
DetailsAndy J. Long
Complaint Inspection6/9/20166/9/20166/9/2016APASS
DetailsAndy J. Long
Dust complaint received:

Water supply and hoses on site for dust control. Requested that in afternoon need to spray down stockpiles.

BMPs installed on site, DIs have sediment filters, lined concrete washout area is provided.

Requested that trash bin be used. Hauling off materials as they go. No windblown trash across street or along canal.

Permit sign posted. No dust at time of inspection.
General Inspection5/31/20165/31/20165/31/2016 PASS
DetailsEvan Jenkins
WIP: No ESC issues observed on construction site
General Inspection5/13/20165/16/20165/16/2016APASS
DetailsAndy J. Long
WIP on site development for apartments. Permit posted. No trackout from site, no fugitive dust issues or discharges. Not yet complete at re-finishing strip of road where new utilitiew were installed.
General Inspection5/11/20165/11/20165/13/2016 CANC
DetailsAndy J. Long
rescheduled for Monday
General Inspection4/26/20164/26/20164/26/2016 PASS
DetailsEvan Jenkins
WIP: no discharges observed at this time
Site Preparation4/5/20164/8/20164/8/2016PPASS
DetailsAndy J. Long
Note - not a site prep,construction already in progress.

Street was swept, no discharges, no fugitive dust. Will need to stabilize the canal bank
General Inspection4/5/20164/5/20164/5/2016 PASS
DetailsAndy J. Long
WIP in installing utilities and sidewalk improvements on Preece. Canal is now flowing, no turbidity increase detected after passing through site but will check for stabilization schedule. Minimal trackout, will check back later in week on progress
General Inspection3/16/20163/16/20163/16/2016 PASS
DetailsAndy J. Long
Permit sign posted. Construction entrance installed. No trackout or discharges. No activity at time of inspection.
General Inspection2/23/20162/23/20162/23/2016 PASS
DetailsEvan Jenkins
Site Preparation1/27/20161/28/20161/28/2016APASS
DetailsAndy J. Long
Chad - ###-####

SWO posted for starting w/o issued permit. Permit now issued and paid for. Check for BMPs and conditions.

Permit sign now posted, SWPPP on site, caution tape blocking off hole, Most of work occured in ROW and some stockpiling on the future lots.

SWO removed. Will need to install construction entrance once sewer and water work is complete. DI across street is installed from subdivsion across street (homes still in progress). Very flat site. Canal bank & berm is above grade of rest of lot, no sheet flow to canal and a vegetative buffer is on the ESC plan.

Approved to resume.