Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberESC16-00853
StatusFinaled
Name JUSTIN REYNOLDS
Site Address 3327 E ECHO CT
Project NameLot 4 Block 8 El Paseo
Customer Number 
ePlanReviewNo
Description
single family home. Flat hillside lot. Perimeter sediment controls, construction entrance, and waste management (incl. concrete washout) are REQUIRED. ESC site preparation required.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection10/30/201710/30/201710/30/2017 CANC
DetailsMichael Zawacki
DOC - Permit Finaled10/30/201710/30/201710/30/2017PPASS
DetailsMichael Zawacki
General Inspection10/13/201710/13/201710/13/2017 CANC
DetailsAndy J. Long
General Inspection9/28/20179/28/20179/28/2017 PEND
DetailsAndy J. Long
HOme complete and says SOLD. Yard has been landscaped. DI on culdesac can have sediment filter mat left installed due to the active site on Echo.

Correction:
- need to clean up or address stockpile on adjacent lot.
General Inspection9/13/20179/13/20179/19/2017 CANC
DetailsAndy J. Long
General Inspection8/29/20178/29/20178/30/2017 CANC
DetailsAndy J. Long
General Inspection8/14/20178/14/20178/17/2017 CANC
DetailsAndy J. Long
General Inspection7/28/20177/28/20177/28/2017 CANC
DetailsAndy J. Long
General Inspection7/13/20177/13/20177/13/2017 PART
DetailsAndy J. Long
No trackout, loose trash or discharges.

Correction request to relocate stucco crew staging area off adjacent lot that has been source of track out and contention.
Site Preparation6/21/20176/28/20176/27/2017ACANC
DetailsMelissa Jannusch
Site Preparation6/16/20176/27/20176/26/2017APASS
DetailsAndy J. Long
Note: trackout follow up; no site prep, home already in progress.

Trackout has been cleaned up and adajacent lot entrace has been blocked. RP notified to prohibit subcontractors from using or staging anything on this lot.
Site Preparation6/16/20176/21/20176/21/2017ACANC
DetailsMelissa Jannusch
General Inspection6/16/20176/16/20176/16/2017 PEND
DetailsMelissa Jannusch
Trackout onto Echo court. Called RP for Lasher construction Brian Murdoch and requested that he get a standalone ESC staging permit for 3309
Echo ct. since this site has had multiple trackout infractions caused by both Lasher construction and Sunrise construction who is currently building next door. This will ensure corrective actions are written for the correct site, company, and RP. I told the RP that the fee for this ESC staging permit can be applied toward the future ESC permit that will be attached to the building permit for the SFH that will be built on this site.

Called RP for adjacent lot 3327 Echo and spoke with RP Justin Reynolds who takes responsibility for the current trackout violation and will be responsible for cleaning it. I told him that Lasher construction will be getting an ESC permit for the site and that he should disallow his contractors from entering his site through Lasher’s site. He has placed several cones with caution tape in attempt to keep workers out of the vacant site but they were recently moved.

Justin also says the excavator is the same for both companies which may be adding to the confusion for the subcontractors.

Having 3309 Echo court get an ESC permit should help ensure that corrective actions reach the right RP and keep Echo court free from trackout.

Actions to be taken:

3327 Echo ct. with RP Justin Reynold will clean trackout in Echo court. RP will tell staff to not enter the lot through the 3309 Echo ct. Follow up next week.

3309 Echo ct. with RP Bryan Murdoch will apply for ESC staging permit. The fee for this permit can be applied for a future ESC building permit on this site. Follow up on permit application next week.
General Inspection6/1/20176/1/20176/2/2017 PASS
DetailsAndy J. Long
Trackout from adjacent lot has been swept. RP on site. Trash has been removed and RP sweeping sidewalks/gutter. Requested that accumulated dirt in front of DI mat be cleaned.

The washout dumped next door will also be cleaned up per RP-GC Justin. No discharges or fugitive dust issues. No new corrections.
General Inspection5/17/20175/17/20175/17/2017 PASS
DetailsMelissa Jannusch
DI Protection needs maintenance. No other corrections.
General Inspection5/2/20175/2/20175/2/2017 CANC
DetailsAndy J. Long
General Inspection4/14/20174/14/20174/17/2017 PASS
DetailsAndy J. Long
General Inspection3/30/20173/30/20173/30/2017PPASS
DetailsMelissa Jannusch
Trackout has been cleaned up.
Tracking Control3/16/20173/22/20173/22/2017PPASS
DetailsMelissa Jannusch
WIP on SFHs in subdivision. No corrections requested.
Tracking Control3/9/20173/16/20173/16/2017PPEND
DetailsMelissa Jannusch
Sweeper was not available until next week. RP has sweeper scheduled for next week. okay.
General Inspection3/7/20173/7/20173/9/2017 FAIL
DetailsMelissa Jannusch
Met RP Justin on site. Corrections requested: clean up trackout maintenance on DI filters. Follow up scheduled for next week.
General Inspection2/17/20172/17/20172/21/2017 CANC
DetailsMelissa Jannusch
General Inspection2/2/20172/2/20172/3/2017 CANC
DetailsAndy J. Long
Site Preparation10/5/201610/6/201610/6/2016APASS
DetailsAndy J. Long
Onsite inspection with RP Justin. Permit sign posted, site plan available. Perimeter wattle and vegetative buffer to remain installed throughout construction to the south, New wattle to be installed on east side to treat any sheet flow that may occur. Lot is below grade of sidewalk.

Construction entrance to be installed after foundation excavation. Requested that backfill stockpile be flattened to reduce wind blown dust.

DI sediment mat installed, requesting maintenance from active project ESC16-00683
General Inspection1/12/20171/12/2017   
DetailsAndy J. Long