Site Final | 10/17/2019 | 10/17/2019 | 10/17/2019 | P | PASS |
Andy J. Long
|
|
|
Staging area within the Zoo is now used by facility staff. All temp BMPs removed. No ESC requiests
|
General Inspection | 10/17/2019 | 10/17/2019 | 10/17/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/2/2019 | 10/2/2019 | 10/2/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/17/2019 | 9/17/2019 | 9/17/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/2/2019 | 9/2/2019 | 9/3/2019 | | CANC |
Andy J. Long
|
|
|
|
Site Final | 8/15/2019 | 8/16/2019 | 8/16/2019 | A | NR |
Andy J. Long
|
|
|
No temporary BMPs left around the perimeter, wattles along the water feature have been removed. CM company still has a staging and work area at the southeast corner of the zoo, will keep open till all work is complete
|
General Inspection | 8/15/2019 | 8/15/2019 | 8/15/2019 | | CANC |
Andy J. Long
|
|
|
|
Site Final | 7/31/2019 | 7/30/2019 | 8/1/2019 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/31/2019 | 7/31/2019 | 7/31/2019 | | CANC |
Andy J. Long
|
|
|
|
Site Final | 7/16/2019 | 7/16/2019 | 7/16/2019 | A | DEFR |
Michael Zawacki
|
|
|
Construction entrances closed. Will need to schedule access with zoo.
|
General Inspection | 7/16/2019 | 7/16/2019 | 7/16/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/1/2019 | 7/1/2019 | 7/1/2019 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/14/2019 | 6/14/2019 | 6/14/2019 | | PASS |
Michael Zawacki
|
|
|
Section within zoo is completed and open. Anteater pavillion is interior work, lot has been paved and packed pit run along building. New area is almost completed. Walkways are paved, almost all the area is landscaped. Some work remaining on some enclosures.
|
General Inspection | 5/30/2019 | 5/30/2019 | 6/3/2019 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 5/13/2019 | 5/13/2019 | 5/13/2019 | | PASS |
Michael Zawacki
|
|
|
3 work areas all contained. Anteater pavillion up and work is interior, outside still needs stabalization and is contained. Area inside zoo looks like work is on punch list. Expansion has lots going on, no ESC issues.
|
General Inspection | 4/26/2019 | 4/26/2019 | 4/29/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/11/2019 | 4/11/2019 | 4/17/2019 | | NR |
Michael Zawacki
|
|
|
Most structure built, starting to lat out paths. Sites are all clean.
|
General Inspection | 3/27/2019 | 3/27/2019 | 3/27/2019 | | PASS |
Michael Zawacki
|
|
|
Staging area has been moved. No ESC or runoff issues. Inside area is muddy, no trackout. Rock entrance has been removed for new pad, will be reinstalled when back access is closed and they need to go through front again. Will need to watch out for loose and blowing trash and keep creek free from trash.
|
General Inspection | 3/12/2019 | 3/12/2019 | 3/12/2019 | | PASS |
Michael Zawacki
|
|
|
All worksites contained. No dirt leaving site, road has been built higher in low areas, tracking is being swept.
|
General Inspection | 2/22/2019 | 2/22/2019 | 2/27/2019 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 2/7/2019 | 2/7/2019 | 2/7/2019 | | PASS |
Michael Zawacki
|
|
|
All locations are clean. Met zoo director while on site and he is happy with the work of contractors.
|
General Inspection | 1/21/2019 | 1/21/2019 | 1/23/2019 | | PASS |
Michael Zawacki
|
|
|
All work areas are cleaned and contained. Concrete washout is nearly full of water.
|
General Inspection | 1/2/2019 | 1/2/2019 | 1/2/2019 | | PASS |
Michael Zawacki
|
|
|
Work on demo has begun in new ant eater area, building is gone and parking lot being ripped up. Site is frozen solid, no mud issues. Some trackout that the RP wll clean. No major issues.
|
Site Preparation | 12/13/2018 | 12/18/2018 | 12/18/2018 | A | PASS |
Michael Zawacki
|
|
|
Wattle along creek. Asphalt will be last to be demoed, shed next to creek not being removed. Will you parking lot in park for staging, access site through current gate, all paved. Will monitor site during demo and construction and modify BMPs as needed.
|
General Inspection | 12/11/2018 | 12/11/2018 | 12/11/2018 | | PASS |
Michael Zawacki
|
|
|
Pit run road above grade completed through site. Low areas are all muddy, road prevents vehicles from tracking in mud. No trackout from either side of zoo. Anteater exhibit hasn't begun.
|
General Inspection | 11/23/2018 | 11/26/2018 | 11/30/2018 | P | PASS |
Michael Zawacki
|
|
|
Site is low spot and holding water, getting very muddy. Sand and fill is being brough to elevate road. Very light trackout, foreman said he would sweep it up.
|
General Inspection | 11/21/2018 | 11/21/2018 | 11/23/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/2/2018 | 11/6/2018 | 11/8/2018 | A | PASS |
Michael Zawacki
|
|
|
Site is contained. Wattle needs to be replaced along creek behind new pavillion in zoo, also need to watch for rain coming of roof and rilling. Will monitor for trackout as it starts to get wet.
|
General Inspection | 10/24/2018 | 10/25/2018 | 11/2/2018 | P | PEND |
Andy J. Long
|
|
|
|
General Inspection | 10/19/2018 | 10/22/2018 | 10/24/2018 | A | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 10/18/2018 | 10/18/2018 | 10/19/2018 | | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 10/3/2018 | 10/3/2018 | 10/3/2018 | | PASS |
Michael Zawacki
|
|
|
Site is clean and well kept, BMPs in place. Will watch for trackout with coming rain.
|
General Inspection | 9/13/2018 | 9/13/2018 | 9/13/2018 | | PASS |
Michael Zawacki
|
|
|
Secondary containment has been added to mortar mixers. Masons using water on saw, dust is not an issue. Getting ready to start next phase in maintenance area, will schedule prep inspection when required.
|
General Inspection | 8/29/2018 | 8/29/2018 | 8/29/2018 | | PASS |
Michael Zawacki
|
|
|
Site is clean and well maintained. Asked for secondary containment around mortar mixers, removal of some waste left over from sidewalk on and around road.
|
General Inspection | 8/9/2018 | 8/9/2018 | 8/9/2018 | A | PASS |
Michael Zawacki
|
|
|
Inspected both sides of project. Foundation was poured this morning, washout used. Gave them ok to dump extra concrete on ground to cure and treat as solid waste, washout must be into containment. Site is free from any dust or trackout.
|
Conference | 7/20/2018 | 7/24/2018 | 7/24/2018 | A | PASS |
Andy J. Long
|
|
|
check on suez project...
Dewatering & water line flushing was conducted yesterday and was land applied to the grassy area in Julia Davis Park. No discharge to waterway through the Zoo occurred. Excavation and temporary holding pit have been filled in. Wattles were not disturbed.
Reveiwed dewatering and flushing rules with water line project operator Justin with Gully Excavation.
No violations.
|
General Inspection | 7/19/2018 | 7/20/2018 | 7/20/2018 | A | PASS |
Andy J. Long
|
|
|
No trackout, offsite discharges, or other issues observed. RP on site with SWPPP info and site BMP map available.
Permit info is posted at each entrance. Wattles installed to protect the Punque River are in good conditon. Tree protection fences are installed.
Correction request:
- have Ecopan concrete washouts serviced
Working with Parks and Rec, Suez subcontractor, and Zoo management in regards to the water line work occuring and the flush discharge set up next to Pungwe River area. Status pending.
|
General Inspection | 6/20/2018 | 6/20/2018 | 6/21/2018 | P | PASS |
Michael Zawacki
|
|
|
Site is clean and contained. Road is closed and being used for storage. Stockpiles are surrounded by wattle. Pond along site is protected by wattle. Only issue is one of the eco pans is starting to overflow.
|
General Inspection | 5/9/2018 | 5/10/2018 | 5/10/2018 | A | PASS |
Michael Zawacki
|
|
|
Signage has been updated as requested. Secondary perimeter controls installed by wattle at pond edge. No ESC issues on site.
|
Site Preparation | 4/24/2018 | 4/24/2018 | 4/25/2018 | P | PASS |
Andy J. Long
|
|
|
Zoo Boise site walk through conducted 11:30 PM 4/24 with RP & project superintendant Justin Palm with CM Company.
ESC permit sign will be posted on main job board. CGP signage info provided to RP for posting.
Site perimeter has been fenced off. Crew has worked with Forestry to mark off tree protection areas. Sediment Control wattles have been installed along the river stream. Additional stakes will be placed this week, did not trench in to protect tree roots. Vegetative buffer will be marked with construction fence. Will inspect during rain event to find discharge points.
Onsite stormwater drains that discharge to zoo river have sediment protection. They will be demolished during first phase of construction, RP will construction temporary drainage swales/basins in the interim. Need to determine re-use of the stormwater vault and cyclone filter installed, to be discussed with Public Works.
Approved for construciton, initial BMPs are ready. Follow up inspection scheduled.
|