Site Final | 10/17/2019 | 10/25/2019 | 10/25/2019 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 10/17/2019 | 10/17/2019 | 10/17/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/2/2019 | 10/2/2019 | 10/2/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/17/2019 | 9/17/2019 | 9/18/2019 | | PASS |
Michael Zawacki
|
|
|
Nearly completed, site is landscaped, no issues. Grading permit has been closed.
|
General Inspection | 9/2/2019 | 9/2/2019 | 9/3/2019 | | PASS |
Michael Zawacki
|
|
|
Home and landscaping completed. Driveway is done. No ESC issues.
|
General Inspection | 8/16/2019 | 8/16/2019 | 8/16/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/1/2019 | 8/1/2019 | 8/2/2019 | | PASS |
Michael Zawacki
|
|
|
Landcapers on site. New section of sidewalk poured/repaired. Washout was used.
|
General Inspection | 7/17/2019 | 7/17/2019 | 7/17/2019 | | PASS |
Andy J. Long
|
|
|
Landscaping in progress
|
General Inspection | 7/2/2019 | 7/2/2019 | 7/2/2019 | | PASS |
Michael Zawacki
|
|
|
No dirt leaving site. Fence installation has begun.
|
General Inspection | 6/14/2019 | 6/14/2019 | 6/14/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/13/2019 | 5/15/2019 | 5/15/2019 | A | PART |
Michael Zawacki
|
|
|
Majority cleaned, still some gravel at curb.
|
General Inspection | 5/10/2019 | 5/10/2019 | 5/13/2019 | | PART |
Michael Zawacki
|
|
|
Some trackout from track steer at bottom of driveway. Follow up scheduled.
|
General Inspection | 4/25/2019 | 4/25/2019 | 4/25/2019 | | PASS |
Andy J. Long
|
|
|
NO signigicant trackout. Project staying within clearing limits and surrounded by preserved vegetation. RP stated that the disturbed slope above the driveway cut will get another hydroseeding and landscaping is starting to occur. No corrections at this time.
|
Tracking Control | 4/8/2019 | 4/10/2019 | 4/10/2019 | A | PART |
Michael Zawacki
|
|
|
Still some mud in gutter in front of driveway and some on sidewalk, rest of site clean. RP aware.
|
Tracking Control | 4/8/2019 | 4/8/2019 | 4/8/2019 | P | FAIL |
Michael Zawacki
|
|
|
Lots of trackout, message sent to RP, follow up inspection on 4-10
|
General Inspection | 4/2/2019 | 4/2/2019 | 4/2/2019 | | PASS |
Michael Zawacki
|
|
|
Some rock work behind home. No material or equipment leaving lot, no ESC issues.
|
General Inspection | 3/18/2019 | 3/18/2019 | 3/22/2019 | | PASS |
Michael Zawacki
|
|
|
Site is clean, no trackout or runoff.
|
General Inspection | 3/1/2019 | 3/1/2019 | 3/1/2019 | | PART |
Michael Zawacki
|
|
|
Some trackout from driveway.
|
General Inspection | 2/12/2019 | 2/12/2019 | 2/13/2019 | | PASS |
Michael Zawacki
|
|
|
Site is contained, no runoff or trackout.
|
General Inspection | 1/25/2019 | 1/25/2019 | 1/25/2019 | | PASS |
Michael Zawacki
|
|
|
2 parcel home. Old trackout has been cleaned. Site is trash free and clean. No new ESC issues.
|
General Inspection | 1/10/2019 | 1/10/2019 | 1/10/2019 | | FAIL |
Michael Zawacki
|
|
|
Home covers two parcels. Someone has driven through mud on side and tracked onto sidewalk and road. Remainder of lot is clean. Sent message to RP.
|
General Inspection | 12/19/2018 | 12/19/2018 | 12/19/2018 | | PASS |
Michael Zawacki
|
|
|
Home being built on two parcels. Site contained, large natural buffer. Workers parking on street and walking. No dirt coming from driveway.
|
General Inspection | 12/3/2018 | 12/3/2018 | 12/3/2018 | | PASS |
Andy J. Long
|
|
|
Snow covered. No trackout. No muddy runoff observed in the thawing conditions.
|
General Inspection | 11/7/2018 | 11/7/2018 | 11/7/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/23/2018 | 10/23/2018 | 10/23/2018 | | PASS |
Michael Zawacki
|
|
|
Buffer is around home, no runoff or rilling. All trash is contained to box off of driveway. No trackout, blocksome and gravel bags on road.
|
General Inspection | 8/14/2018 | 8/14/2018 | 8/14/2018 | P | PASS |
Michael Zawacki
|
|
|
Home is on two parcels. Working on framing. Nothing leaving site. Area above driveway has been tracked, blocksoe on inlets. Gravel snake check bags on road, are clean.
|
General Inspection | 6/18/2018 | 6/18/2018 | 6/18/2018 | P | PART |
Andy J. Long
|
|
|
Slope above driveway did not vegetate/stabilize as expected. Lots of rills running down the cut bank. Correction request:
- install 2 rows of wattles, 2"minimum trench, firmly anchored every 4-5' - schedule site walk through
Verbal correction to RP Eric.
|
Conference | 5/18/2018 | 5/18/2018 | 5/18/2018 | P | PEND |
Michael Zawacki
|
|
|
Lots of trackout leaving site. RP is aware and is on list of areas to fix.
|
Random Inspection | 5/16/2018 | 5/16/2018 | 5/16/2018 | P | PASS |
Michael Zawacki
|
|
|
Post rain event. No issues with site.
|
General Inspection | 4/6/2018 | 4/18/2018 | 4/18/2018 | A | PASS |
Michael Zawacki
|
|
|
Exposed hillside has been tracked and hydro seeded. Roadmix drive in place. DIs by site protected. Nothing leaving lots.
|
General Inspection | 4/6/2018 | 4/6/2018 | 4/6/2018 | P | PASS |
Andy J. Long
|
|
|
Graded hillsides have been tracked and hydroseeded. Permit signs posted. Minimal trackout. See also ESC18-00110
|
BMP Violation | 3/20/2018 | 3/21/2018 | 3/22/2018 | P | PASS |
Michael Zawacki
|
|
|
Access road has been removed from sidewalk. BMPs now in place protecting entrance and storm inlets.
|
BMP Violation | 3/14/2018 | 3/14/2018 | 3/20/2018 | P | PEND |
Andy J. Long
|
|
|
Road built across sidewalk.
|
General Inspection | 5/30/2019 | 5/30/2019 | | | |
Andy J. Long
|
|
|
|