Information based on query as of Tuesday, May 14, 2024.
Permit Information
Permit NumberESC18-01227
StatusIssued
Name EDWARD CONNELL
Site Address 8603 W SLOAN ST
Project NameEaglehawk Subdivsion
Customer Number 
ePlanReviewNo
Description
Site preparation inspection is required. Construction entrance of Bogart is required with angular rock per construction details. Protect MS4 on Bogart. Plan calls for SF perimeter on north, east, and west sides of project. Site parking and access to have permeable pavers & GSI. These areas will need protection during construction in ensure they work properly in post construction.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection8/13/20208/13/20208/13/2020 CANC
DetailsAndy J. Long
General Inspection7/29/20207/29/20207/29/2020 PASS
DetailsAndy J. Long
Work is being completed on parking lot and final landscaping. Will check for site final next inspection
General Inspection7/14/20207/14/20207/14/2020 PASS
DetailsMichael Zawacki
All work looks completed and area landscaped. Some sidewalk repairs were done. DI bags still in street.
General Inspection6/29/20206/29/20207/7/2020 CANC
DetailsAndy J. Long
General Inspection5/20/20205/20/20205/22/2020 CANC
DetailsAndy J. Long
General Inspection5/5/20205/5/20205/5/2020PPASS
DetailsMichael Zawacki
No damage or windblown trash in park. Irragation ditch has been piped, needs landscaping.
Site is clean, new dumpster has been delivered. All units framed, mostly interior work, two are still tyvek wrapped.
Complaint Inspection4/30/20204/30/20205/4/2020PDONE
DetailsAndy J. Long
Notified RP to continue picking up any windblown trash in Magnolia Park daily and checking that all loose wrappings and trash within site are contained.
General Inspection4/17/20204/21/20204/20/2020PPASS
DetailsMichael Zawacki
Some piles of drywall scraps will need to be cleaned up.No trash leaving site, nothing radomly laying around.
General Inspection4/17/20204/17/20204/17/2020 CANC
DetailsAndy J. Long
General Inspection4/2/20204/2/20204/2/2020 PASS
DetailsMichael Zawacki
nO TRASH BLOWN INTO PARK. cREWS ON SITE CLEANING TRASH, TRASH GUY ON SITE REPLACING DUMPSTERS.
sILT FENCE STILL ALONG IRRAGATION DITCH.
nO ESC ISSUES.
General Inspection3/18/20203/18/20203/18/2020 PASS
DetailsMichael Zawacki
No trash has blown into park. Most trash on site is cleaned and in boxes or piled. Some small scraps laying around. No trackout.
BMP Violation2/27/20203/3/20203/2/2020APASS
DetailsMichael Zawacki
Small trash picked up. Still lots of buyilding waster, will need to stay on trash cleanup. Nothing in park.
General Inspection2/27/20202/27/20202/27/2020 FAIL
DetailsMichael Zawacki
Message sent to Ed Kron, listed on job trailer. Site has a bunch of trash, needs a walk through and clean up.
Reinspection scheduled.
General Inspection2/12/20202/12/20202/12/2020PPART
DetailsMichael Zawacki
Lots of dirt within site, none tracking out. Any damage will be to onsite seepage and retention. Two large dumpsters, some loose lumber scraps.
Site Preparation2/7/20202/12/20202/11/2020PCANC
DetailsAndy J. Long
General Inspection1/31/20202/6/20202/7/2020PCANC
DetailsAndy J. Long
rescheduled
General Inspection1/31/20201/31/20201/31/2020 CANC
DetailsAndy J. Long
General Inspection1/16/20201/16/20201/16/2020 PASS
DetailsMichael Zawacki
First few homes completed, framing has begun on next batch. All material stored in lot, washouts on site. Workers parked in the parking lot at park next door.
General Inspection1/1/20201/1/20201/2/2020 PASS
DetailsAndy J. Long
Access (Lucy Day Street) is paved. Concrete washout tubs are on site for use. No trackout or discharges observed
General Inspection12/17/201912/17/201912/17/2019 PART
DetailsMichael Zawacki
Four homes on Sloan nearly completed.
All building materials stored in parking lot.
Concrete and pump trucks on site. Concrete truck is using washout. Pump truck is on back of lot in mud, will need to make sure to clean road and parking lot when done.
General Inspection11/29/201911/29/201911/29/2019 CANC
DetailsAndy J. Long
General Inspection11/14/201911/14/201911/18/2019 PASS
DetailsMichael Zawacki
Multiple foundations poured and concrete crew working on forms for next foundations. Two washout pans on site, some spillage.
Multiple piles of backfill on site around foundations.
All m,aterials stored in parking lot. No blowing trash or tracking.
General Inspection10/30/201910/30/201910/30/2019 CANC
DetailsAndy J. Long
General Inspection10/11/201910/15/201910/14/2019PPASS
DetailsMichael Zawacki
2 units under construction. Foundations for additional units excavated but not yet poured. Tubs washouts on site. All material stored on parking lot. No loose trash.
General Inspection10/11/201910/11/201910/11/2019 CANC
DetailsAndy J. Long
General Inspection9/26/20199/26/20199/27/2019 PASS
DetailsMichael Zawacki
Two of the buildings are framed. Site is clean, no loose trash,large dumpster on site. Irragation next to site is protected with silt fence. Only one work trailer parked in dirt and not on parkinglot. No issues at site.
General Inspection9/11/20199/11/20199/11/2019 PASS
DetailsMichael Zawacki
WIP on framing on multiple units. Giant dumpster on site. Road is clean. Genie lift on site, will need to watch that it doesn't track mud.
General Inspection8/27/20198/27/20198/27/2019 PASS
DetailsMichael Zawacki
First two foundations have been poured, outpak washout used and still on site. Building material stored on site. Plywood is covering pervious pavers in parking lot.
General Inspection8/12/20198/12/20198/12/2019PPASS
DetailsMichael Zawacki
Parking lot completed, no work begun on homes.
General Inspection7/26/20197/26/20197/26/2019 PASS
DetailsMichael Zawacki
General Inspection7/11/20197/11/20197/11/2019 PASS
DetailsMichael Zawacki
No new construction activity. Parking lot finished, area starting to overgrow.
General Inspection6/26/20196/26/20196/26/2019PPASS
DetailsMichael Zawacki
Parking lot and all sidewalks and parking lot islands completed. No work on any of the lots.
General Inspection5/7/20195/7/20195/7/2019PPASS
DetailsAndy J. Long
WIP installing site developement and landscaping. No trackout or other violations observed.
General Inspection3/18/20193/18/20193/18/2019PPASS
DetailsMichael Zawacki
No current activity. Site is prepped for paving and sidewalks.
General Inspection1/14/20191/14/20191/14/2019PPASS
DetailsMichael Zawacki
Lots of equipment on site, no current activity. No muddy trackout, some gravel on Sloan.
General Inspection12/12/201812/12/201812/12/2018PPART
DetailsMichael Zawacki
Site is inactive, tracks on snow, hasn't been shut down for winter. Rock entrances will need to be rebuilt.
General Inspection11/14/201811/14/201811/14/2018PPART
DetailsMichael Zawacki
No pumping or dewatering at site. Perimeter BMPs removed, silt fence sitting on pallet. Rock entrance onto sloan, no entrance on Bogart.
General Inspection10/23/201810/24/201810/24/2018APASS
DetailsAndy J. Long
dewatering

Initial pump discharge of turbid water retained in settling pond. Clear water now being directly discharged into irrigation ditch. Water is flowing to Spoil Banks canal is clear, no plume observed. RP on duty monitoring.
General Inspection10/19/201810/23/201810/23/2018PPEND
DetailsAndy J. Long
dewatering plan and implementation follow up.

WIP excavating retention basin area and setting pumps. No dewatering occuring yet. Large settling basin constructed. Retention area overflow still planned to be irrigation ditch which flows north to Spoil Banks canal.

Site Preparation10/19/201810/19/201810/19/2018PPASS
DetailsAndy J. Long
BMPs installed, perimeter silt fence to protect Magnolia Park, lined and rock construction entrance installed on Sloan. Site was "crusted" at end of last earth work to prevent wind blown dust.

Site to submit dewatering plan next week. Follow up inspection on Tuesday PM
Site Final8/13/20208/18/2020 P 
DetailsAndy J. Long
General Inspection6/12/20206/12/2020   
DetailsAndy J. Long
General Inspection5/22/20205/28/2020 P 
DetailsAndy J. Long