Permit Information
Permit NumberESC19-00376
StatusIssued
Name PETER HARRIS
Site Address 2601 N BIRD ST
Project NameLodestar Place Sub
Customer Number 
ePlanReviewNo
Description
2.33 Acre infill subdivision into 13 lots with 12 new proposed homes and 1 existing home to remain. Home demolition permitted seperately. Site grading, utilities, stormwater facilities and common driveways to be installed. Prevent trackout, protect existing storm drains across street. Site preparation inspection is required.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection7/3/20207/3/20207/7/2020 PASS
DetailsMichael Zawacki
Homes have begun on north side of project. all building materials stored on site, site still has washout.
General Inspection5/18/20205/18/20205/18/2020PPASS
DetailsMichael Zawacki
No work on north side of infill. 3 completed homes, 2 under construction. Area is clean, no issues.
General Inspection4/6/20204/6/20204/6/2020PPASS
DetailsMichael Zawacki
No work has begun on north side of project.
New foundation being poured. Pump truck accessed the site from common drive, extra mud dumped on backfill, using on site washout. Common drive is dirty, no trackout.
First common block on north is almost completed.
General Inspection3/2/20203/2/20203/2/2020PFAIL
DetailsMichael Zawacki
One load of washout dumped on vacant north side of project.
All homes on south are being framed. No forms or form trailers on site. Home areas are kept clean. One home is about finished.
Inlets are protected, no trackout or loose trash.
General Inspection1/31/20202/4/20202/4/2020PPASS
DetailsAndy J. Long
No trackout. WIP on framing for homes. No corrections requested at this time. Will need to provide washout container or re-line existing pit on site.
General Inspection1/29/20201/29/20201/31/2020 CANC
DetailsAndy J. Long
rescheduled
Complaint Inspection12/10/201912/12/201912/12/2019APASS
DetailsMichael Zawacki
Site is clean. One foundation in place, one home being framed, one lot excavated.
Next pour will need to provide washout. Excavator removced central washout, wasn't being used everytime and guys using it would drive through mud instaead of drive. Builders now responsible for their own washout.
General Inspection11/13/201911/14/201911/14/2019APASS
DetailsMichael Zawacki
Neighborhood site prep completed. Work has begun on homes. No issues.
Washout may need stabalized road, will monitor.
General Inspection9/19/20199/24/20199/24/2019PPASS
DetailsMichael Zawacki
ACHD right of way and sidewalks have been repaired. Spur road into development installed. Site is graded, all stockpiles and trash removed. Washout still on site. No esc issues.
General Inspection9/6/20199/6/20199/6/2019PPASS
DetailsMichael Zawacki
Wood Bros on site prepping road bed on street for patching.
General Inspection8/16/20198/20/20198/20/2019APASS
DetailsMichael Zawacki
Street around site has been removed. Site has been rough graded and looks like water has been ran. Lined washout on site. Water truck on site, looks like site has been crusted, no current activity.
General Inspection7/25/20197/29/20197/30/2019APASS
DetailsMichael Zawacki
Road has been cut and work in progress. Site has large entrance, lined washout, and is contained. No ESC issues.
Conference7/9/20197/9/20197/9/2019APEND
DetailsAndy J. Long
call about dirt not being watered down


Notified RP to send water truck to crust site and stockpiles. Track Utility crew should also have water truck available if the activity is causing dust.

RP to follow up.
General Inspection7/8/20197/8/20197/8/2019PPASS
DetailsAndy J. Long
track uitilities onsite with small crew. No trackout, BMPs installed.

Large stockpiles on west side of site. Will need to monitor for temporary stabilization/dust abatement if piles to remain inactive.
Site Preparation6/27/20196/27/20196/27/2019PPASS
DetailsMichael Zawacki
Inlet protection installed, wattle on south end of site where lot is above grade. New rock brought for entrance.
Water truck and sweeper will be brought on site.
Conference6/26/20196/26/20196/26/2019PDONE
DetailsAndy J. Long
Work conducted prior to issued ESC permits for scope of work completed. Corrections needed at site and site preparation inspection must be scheduled after paying re-inspection fee charged.
Site Preparation6/25/20196/26/20196/26/2019AFAIL
DetailsMichael Zawacki
Sewer and water installed without ESC permit. 7 inlets around site not protected. Road has been saw cut but not patched, causing tracking down road, In areas where site is not below grade there is no perimeter controls. Multiple ways into site, one rock entrance made with round rocks.
Lined washout on site, permit is displayed but there is no info for RP. Large pile of tires has been dumped on site. Large exposed area with no dust control.