Permit Information
Permit NumberESC19-00402
StatusFinaled
Name WARM SPRINGS INVESTMENT GROUP LLC
Site Address 706 N HAINES ST
Project Name 
Customer Number 
ePlanReviewNo
Description
per attached ESC conditions. BMPs: stabilized entrance, offhaul or store backfill away from front of lot, leakproof concrete washout, downslope perimeter sediment control (filtrex wattle listed), tracking/sweeping controls, receiving storm drain inlet should be located and protected as necessary. Site preparation inspection is REQUIRED.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection5/4/20205/4/20205/4/2020 CANC
DetailsMichael Zawacki
DOC - Permit Finaled5/4/20205/4/20205/4/2020PPASS
DetailsMichael Zawacki
General Inspection4/16/20204/16/20204/16/2020 PASS
DetailsMichael Zawacki
Home is completed, lot is zero scaped with rocks.
General Inspection4/1/20204/1/20204/1/2020 PASS
DetailsAndy J. Long
WIP on interior. Needs final clean up. No correction requests at this time.
General Inspection3/17/20203/17/20203/17/2020 PASS
DetailsMichael Zawacki
Retaining wall done, driveway poured. Front yard has been zero scaped.
General Inspection3/2/20203/2/20203/2/2020 PASS
DetailsAndy J. Long
Near completion. Used concrete washout for driveway. Needs landscaping. BLD open.

No corrections requested.
General Inspection2/14/20202/14/20202/14/2020 PASS
DetailsAndy J. Long
Site prepped for driveway. No trackout, perimeter gator guard installed. Workers parking on street.
Tracking Control1/29/20201/30/20201/30/2020APASS
DetailsMichael Zawacki
Steet cleaned, gator guard reinstalled.
General Inspection1/29/20201/29/20201/29/2020 FAIL
DetailsMichael Zawacki
One person backed onto site and tracked down E Hays Way. Every other worker is parked on road. Overall site clean.
No listed rp, message sent to owner, follow up scheduled.
Tracking Control12/13/201912/13/201912/13/2019PFAIL
DetailsMichael Zawacki
Muddy street. Home still has parcel hold.
BMP Violation11/15/201911/15/201911/15/2019PFAIL
DetailsAndy J. Long
No clean up of street & gutter conducted as requested. No washout pan onsite, evidence of spilled/dumped washout on street, flowing down hill. No stabilized construction entrance.

No perimeter sediment controls installed.

Corrections:
- clean up site, sweep gutter, sweep up dried spilled material
- install sediment control wattle and/or other BMPs on the downhill corner
- pay $55 re-inspection fee
- schedule inspection with ESC inspector

Parcel hold placed on site until corrections complete
General Inspection11/6/201911/6/201911/6/2019PPART
DetailsAndy J. Long
Correction request:

- sweep gutter in front of home
- move trash box back from gutter so small pieces of trash are not in gutter
- provide concrete washout containment for the driveway to be poured next week.
General Inspection10/22/201910/22/201910/22/2019PPEND
DetailsMichael Zawacki
No current issues, truck and trailer parked on dirt, is raining and will probably cause trackout.
Allk materials on site, no blowing trash, trash box on site.
General Inspection9/24/20199/24/20199/24/2019PPASS
DetailsMichael Zawacki
WIP on framing. Trash box on site and being used. All material stored on lot, workers parked on road. Front perimeter controls have been removed, will monitor for trackout and dirt leaving site.
General Inspection7/9/20197/19/20197/19/2019APASS
DetailsMichael Zawacki
Forms have been placed, no pour yet, will need washout. Gator guard around perimeter.
Conference7/8/20197/9/20197/9/2019ADONE
DetailsAndy J. Long
10:15

Review ESC permit requirements and proper gator guard installation.

GC to take next City RP class. Will re-install gatorguard today. Plan is to use an excavated and lined washout pit.

Backfill to begin around the 15th of July.
Site Preparation7/8/20197/8/20197/8/2019PCANC
DetailsAndy J. Long
Dustin Phone #: ###-####

site already started. Rescheduled for site conference to review ESC plan and BMP installations.
General Inspection7/2/20197/9/20197/8/2019PCANC
DetailsAndy J. Long
General Inspection6/27/20197/1/20197/2/2019APART
DetailsAndy J. Long
Dustin Collins
###-####

Road was swept but wattles still not installed properly.

Will follow up with contractor next week for correct installation.
Site Preparation6/27/20196/27/20196/27/2019PFAIL
DetailsAndy J. Long
Need to stake in gatorguard wattle per specs. Permit sign was posted but behind stockpile. Some minor trackout.

Request to GC (new) to take RP class, sweep road, stake in gatorguards.

follow up scheduled...