Information based on query as of Saturday, May 4, 2024.
Permit Information
Permit NumberFIR17-00508
StatusFinaled
Name SIMPLEX GRINNELL
Site Address 519 N 9TH ST
Project NameBOISE HS GYM & PERF ART'S RENO
Customer Number 
ePlanReviewYes
Description
BOISE HIGH SCHOOL GYMNASIUM & PERFORMING ART'S RENOVATION scope of work is to provide and install a new automatic manual fire alarm system as shown in drawings. This work is associated with building permit BLD17-01000.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/19/20196/19/20196/19/2019PPASS
DetailsJim Page
Final fire alarm inspection complete. Project was reviewed under the 2012 IBC and IFC which required releasing of the access control per section 1008.1.9.8, Ron Johnson allowed the code section 1010.1.9.8 of the 2015 IFC to be applied due to the change in code requirements and application for this project.

Kristin Phone #: ###-####
INSP-Final Inspection6/3/20196/4/20196/4/2019PPART
DetailsJim Page
Previously noted items have been corrected. Access control still needs to be interfaced with the fire alarm system per IFC 1008.1.9.8. Permit will remain in issued status until access control issue is resolved, record of completion has not been signed as of this inspection.

Joe Phone #: ###-####
INSP-Final Inspection5/31/20195/31/20195/31/2019PFAIL
DetailsJim Page
Wall mount speaker strobe is higher than 96 inches off of finish floor, move to code compliant elevation. Coordinate with audio contractor for audio shutdown in gym during active alarm.

late afternoon // Joe Phone #: ###-####
INSP-Final Inspection4/23/20194/24/20194/24/2019PPART
DetailsJim Page
Fire alarm inspection for phase 2 TCO complete.

please go after 3:30, this is a school-Joe Phone #: ###-####
INSP-Final Inspection4/23/20194/23/20194/23/2019PFAIL
DetailsJim Page
Multiple troubles with speaker wiring configuration on fire panel, no audio/visual testing performed.

Gary Phone #: ###-####**please go after 3:30pm WHEN CHILDREN ARE OUT** THANK YOU
INSP-Final Inspection4/19/20194/19/20194/19/2019PFAIL
DetailsJim Page
Fire alarm system not ready to test, trouble count went from 6 to 38, areas that show troubles are part of the TCO phase 1 area.

After 4 // Joe Phone #: ###-####
INSP-Final Inspection4/16/20194/18/20194/18/2019PFAIL
DetailsMark Scharfen
Met with Joe and looked at plans. Went over plans, currently there are 6 troubles on the panel due to points for P3 that are tied in but not live on system. This will leave fire alarm throughout school in trouble.

Started looking at CD and placement settings in mezzanie and found they were set at 'FACP' and 15CD in programming. These needed to be 185CD. Strobe placment in mezz. is high off floor and mentioned that this was discussed with Lee Meridith to split high and low distance from top of bleachers to floor to get maximum strobe setting. All mezzanine strobes will need to be changed and re-tested. Per Joe, they will attempt to schedule inspection for 4/19 but he will not be the technician on site.

Joe- please call for access-needs to be as late as possible becasue this is a school Phone #: ###-####
INSP-Final Inspection2/21/20192/21/20192/21/2019PPART
DetailsJim Page
Finalm fire alarm inspection for TCO Phase 1 complete.
INSP-Alarm Testing2/21/20192/21/20192/21/2019APART
DetailsJim Page
Alarm testing for TCO phase 1 complete.

Phone #: ###-#### Inspection requested via web by Gary Gambino
INSP-Final Inspection2/20/20192/20/20192/20/2019PCANC
DetailsJim Page
Phone #: ###-#### >> Inspection requested via web by Gary Gambino Inspection cancelled from web by: Gary Gambino
INSP-Final Inspection2/18/20192/19/20192/19/2019AFAIL
DetailsJim Page
Trouble on NAC circuit showed up at time of inspection, trouble is in TCO requested area, inspection was stopped.

Phone #: ###-#### Inspection requested via web by Gary Gambino
INSP-Final Inspection2/12/20192/13/20192/13/2019PFAIL
DetailsTroy Cobbley
As builds were missing some points and need updated,.
network addressing from new building to main needs to be fixed in order to show what building the alarm is coming from.
off site reporting does not work correctly. panel will send single alarm signal when panel is in trouble but will not restore or send other alarms till trouble is cleared. spoke with lee meridith and individual alarm/trouble/supervisory signals from panel to aes need to be set up qnd not single zone.
elevator recall and remote mic still need to be tested.
Area A TCO re-inspect Phone #: ###-#### Inspection requested via web by Shane Lesteberg
INSP-Final Inspection1/31/20191/31/20191/31/2019PCANC
DetailsJim Page
This request is cancelled, reference notes entered on 31JAN2019.

Phone #: ###-#### Inspection requested via web by Gary Gambino
INSP-Final Inspection1/30/20191/31/20191/31/2019AFAIL
DetailsJim Page
No inspection was performed on the fire alarm system, Boise school district has a permit still in issued status for an AES communicator install (FIR18-00167). The communicator attached to the mentioned permit has never been inspected. Due to the type of install, the communicator will not report out a general fire alarm if there is a trouble on the main fire panel. Boise High School has had troubles on the fire alarm panel and during the trouble event the school is not monitored for general fire alarm events. No further inspection will be completed on the fire alarm addition to the gymnasium until the AES communicator permit is inspected, passed and operational. Per the conversation with Ron Johnson with Boise Fire, this permit will not be finaled for any type of occupancy until the communicator is inspected and finaled.

Area A re-inspect Phone #: ###-#### Inspection requested via web by Shane Lesteberg
INSP-Final Inspection1/29/20191/30/20191/30/2019AFAIL
DetailsJim Page
Contractor not on site at time of inspection, could not wait for contractor to show up, inspection will need to rescheduled.

Re-inspect for Area A TCO - remote mic issues resolved. Phone #: ###-#### Inspection requested via web by Shane Lesteberg
INSP-Alarm Testing1/28/20191/29/20191/29/2019AFAIL
DetailsJim Page
Address numbers on tampers do not match city approved drawings. Trouble with remote mic, need to resolve issues. As-builts need to be sent to fire alarm plan reviewer.

TCO for area A Phone #: ###-#### Inspection requested via web by Shane Lesteberg
INSP-Final Inspection1/25/20191/28/20191/28/2019PCANC
DetailsJim Page
Cancelled per conversation with GC, inspection will be rescheduled for a later date.

TCO for area A Phone #: ###-#### Inspection requested via web by Shane Lesteberg
INSP-Final Inspection1/15/20191/16/20191/16/2019AFAIL
DetailsJim Page
Networking is not set up between panel and monitoring, did not test any signals due to no verification of alarm through monitoring, no other items were inspected.

request late morning - between 11 and noon inspection. Contact Gary for specific time. Thanks! Phone #: ###-#### Inspection requested via web by Shane Lesteberg
INSP-Final Inspection11/16/201711/16/201711/16/2017PCANC
DetailsJim Page
Anthony Phone #: ###-####