Information based on query as of Tuesday, May 7, 2024.
Permit Information
Permit NumberFIR19-00111
StatusFinaled
Name PHOENIX FIRE PROTECTION
Site Address 3711 S COUNCIL SPRING RD
Project NameCouncil Springs
Customer Number 
ePlanReviewYes
Description
***Inspector see notes on plans, and review comments***MAS**New 13,071 Sq Ft 3 Level Bldg to be fully sprinklered per NFPA 13R, 216 Code, Occupancy Code R-2, Const. Type V-A **Underground Permit FIR18-00883**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/26/201911/27/201911/27/2019PPASS
DetailsJim Page
Previously noted items have been corrected, final fire sprinkler inspection is complete.

Contact Ken Orahood ###-#### 30 min prior to Final Insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Final Inspection10/28/201910/29/201910/29/2019AFAIL
DetailsJim Page
Install missing head in entry room 101, heads in kitchen area overspaced off of wall room 101. head painted in room 102, sprinkler head to close to ceiling fan room 102. Missing escutcheon on balcony, room 103. Sprinkler head to close to ceiling fan room 104. sidewall deflector above wood beam room 202 balcony, head sticking to far down through ceiling room 202. Inspection stopped due to defecincies.

Contact Noemi Carrero ###-#### 30 min prior to Final Insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Final Inspection10/24/201910/25/201910/25/2019ACANC
DetailsJim Page
Contact Noemi Carrero - ###-#### 30 min prior to Final Insp start please

Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
INSP-Final Inspection10/23/201910/23/201910/23/2019PFAIL
DetailsJim Page
Provide restricted orifice for inspectors test. Provide annual inspection for backflow assembly. Repair visible leak on riser piping.

Contact Noemi Carrero ###-#### 30 min prior to Final Insp start please

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Final Inspection10/14/201910/18/201910/18/2019ACANC
DetailsTroy Cobbley
Cancel per Noemi due to the project related fire alarm not being ready. Contact Noemi Carrero ###-#### 30 min prior to Final Insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in/Hydro9/6/20199/6/20199/6/2019PDONE
DetailsJim Page
Hydrostatic test for FDC witnessed, no pressure loss observed.

Contact Noemi Carrero ###-#### 30 Min Prior to Hydro on FDC Insp please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Final Inspection6/20/20196/24/20196/24/2019ACANC
DetailsJim Page
Contact Ken Orahood ###-#### 30 min prior to Final Insp start please.

Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
INSP-Sprinkler Rough-in6/17/20196/17/20196/17/2019PPASS
DetailsJim Page
All tenting in place at time of inspection, overhead fire sprinkler piping approved for cover.

Point of contact is Ken Orahood ###-#### please contact him 30 min prior to RTC Insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in/Hydro5/20/20195/21/20195/21/2019ADONE
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed.

Contact Leroy Anderson ###-#### 30 Min Prior to Hydro Insp start please

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in5/9/20195/13/20195/13/2019PPART
DetailsJim Page
Rough to cover inspection for levels 1 and 2 complete, levels 1 and 2 approved for cover. Level 3 rough in inspection complete, tenting/insulation to be installed at a later date, an inspection for tenting is required before cover can be approved, level 3 cover is not approved as of this inspection.

Contact Noemi Carrero ###-#### 30 Min prior to RTC Insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in/Hydro4/25/20194/26/20194/25/2019ACANC
DetailsJim Page
Contact Tyler Loomis ###-#### 30 Min Prior to Hydro Insp start please.

Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
INSP-Sprinkler Rough-in4/24/20194/25/20194/25/2019PFAIL
DetailsJim Page
Need to verify that the dry flex heads used will be supported by the system calcs.

Contact Tyler Loomis ###-#### 30 min prior to RTC Insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Supply line flush4/23/20194/25/20194/25/2019ACANC
DetailsJim Page
Underground supply is on different permit, this request is cancelled.

Contact Tyler Loomis - ###-#### 30 min prior to Flush Insp. start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank