Electrical Rough-In | 8/5/2020 | 8/5/2020 | 8/5/2020 | P | PASS |
James Ady
|
|
|
SCREENED // Mark Phone #: ###-#### 0ffice walls only ok to cover
|
Electrical Rough-In | 8/4/2020 | 8/4/2020 | 8/4/2020 | P | PASS |
James Ady
|
|
|
Screened- Mark Phone #: ###-#### Hard lids and wall rough in as marked and dated on contractor print. ok to cover
|
Electrical Rough-In | 7/29/2020 | 7/29/2020 | 7/29/2020 | P | PASS |
James Ady
|
|
|
mark *screened* Phone #: ###-#### office walls only ok to cover
|
Electrical Rough-In | 7/22/2020 | 7/23/2020 | 7/23/2020 | A | PASS |
James Ady
|
|
|
Screened- 10 days ago framer tested positive for Covid- workers were quaranteen & area sanitize, WAS INFORM THAT THIS INSPECTION MAY BE CANCEL- Mark Phone #: ###-#### 8 offices as marked on contractor print walls only ok to cover
|
Electrical Rough-In | 7/14/2020 | 7/14/2020 | 7/14/2020 | P | PASS |
James Ady
|
|
|
some framers quarantined on job site // Mark Phone #: ###-#### Pictures accepted office area Rough in walls only ok to cover as marked on contractor print
|
Electrical Rough-In | 7/8/2020 | 7/8/2020 | 7/8/2020 | P | PASS |
James Ady
|
|
|
Mark - */Screened*/ Phone #: ###-#### 8 offices as marked on contractor print walls only
|
Electrical Rough-In | 7/6/2020 | 7/6/2020 | 7/6/2020 | P | PASS |
James Ady
|
|
|
screened // Mark Phone #: ###-#### Virtual inspection done due to covid. rooms 271e,f,g,h and j. and room 271l,m,n, and p. walls only ok to cover
|
Electrical Rough-In | 6/26/2020 | 6/29/2020 | 6/29/2020 | A | PASS |
James Ady
|
|
|
screened // Mark Phone #: ###-#### Offices 270D, 270C and team room 270F and 270G walls only ok to cover
|
Electrical Rough-In | 6/8/2020 | 6/8/2020 | 6/8/2020 | P | PASS |
James Ady
|
|
|
Screened- Chad Phone #: ###-#### underground for turn style entry ok to cover
|
Final | 5/26/2020 | 5/27/2020 | 5/27/2020 | A | PART |
James Ady
|
|
|
Screened- Mark Phone #: ###-#### 1st floor phase 1 area A and B final ok
|
Final | 5/11/2020 | 5/12/2020 | 5/12/2020 | A | PART |
James Ady
|
|
|
part final- Mark **screened** Phone #: ###-#### 2nd floor TCO only Areas A and B
|
Electrical Rough-In | 5/6/2020 | 5/7/2020 | 5/7/2020 | A | PASS |
James Ady
|
|
|
Mark Phone #: ###-#### Vestibule only ok to cover
|
Final | 4/30/2020 | 4/30/2020 | 4/30/2020 | P | CANC |
James Ady
|
|
|
screened // Mark Phone #: ###-####
|
Electrical Rough-In | 4/30/2020 | 4/30/2020 | 4/30/2020 | P | PASS |
James Ady
|
|
|
screened // Mark Phone #: ###-#### Rough in coffee bar and reception desk ok to cover
|
Final | 4/21/2020 | 4/22/2020 | 4/22/2020 | A | CANC |
James Ady
|
|
|
Mark Phone #: ###-#### Not ready for final Hot check only. See RI detail
|
Electrical Rough-In | 4/22/2020 | 4/22/2020 | 4/22/2020 | A | PASS |
James Ady
|
|
|
Mark Phone #: ###-#### 1st floor N offices hot checked and ready to final (marked on contractor print)
|
Rough-In Permanent Service | 4/9/2020 | 4/9/2020 | 4/9/2020 | P | PASS |
James Ady
|
|
|
overhead rough in - Mark screened for COVID-19 symptoms Phone #: ###-#### Inspection done via photos due to COVID-19 distancing.. Room 142B ceiling only ok to cover
|
Final | 4/6/2020 | 4/6/2020 | 4/6/2020 | P | PART |
James Ady
|
|
|
Part Final 1st floor -- Mark ***cleared*** Phone #: ###-#### 1st floor cubicals and center offices partial final ok
|
Electrical Rough-In | 4/6/2020 | 4/6/2020 | 4/6/2020 | P | PASS |
James Ady
|
|
|
2nd floor Hall way-- Mark ***cleared*** Phone #: ###-#### Second floor hallway, 1st floor quiet room ceilings only ok to cover
|
Electrical Rough-In | 3/26/2020 | 3/27/2020 | 3/27/2020 | A | PASS |
James Ady
|
|
|
bldg 36 2nd fl ceilling/ 1st floor corid. // mark Phone #: ###-#### 1st floor offices and corridor ceiling only ok to cover
|
Electrical Rough-In | 3/23/2020 | 3/23/2020 | 3/23/2020 | P | PASS |
James Ady
|
|
|
Mark Phone #: ###-#### offices ok to set furniture
|
Electrical Rough-In | 3/18/2020 | 3/18/2020 | 3/18/2020 | P | PASS |
James Ady
|
|
|
1B high ceiling // Mark Phone #: ###-#### Vendor room 142 E-F Soffit, Drop lids rooms 132B. 131 E-H A-D, 130A 120C-F,. Soffits 132A-B, Hot check room 200B, 231A,B,C,D,E,F,G,H,J,K,L,M,N,P, 220B,220E
|
Electrical Rough-In | 3/13/2020 | 3/13/2020 | 3/13/2020 | P | PASS |
James Ady
|
|
|
BLD36 // Sec. fl 3 offices, 1st hard lids, s.e. t grid .... Mark Phone #: ###-#### Corrections in Offices and down bath made ok to cover. SE open office area 11ft ceiling ok to cover
|
Electrical Rough-In | 3/12/2020 | 3/12/2020 | 3/12/2020 | P | PART |
James Ady
|
|
|
second floor celing and firt floor hard lids- Mark Phone #: ###-#### Office 241 missing VAV covers, Offices 231N and 231J Fire alarm not installed Patial cover of remaining office drop lids ok, 1st floor mens and womens restroom, portal entry and help desk hard lid ok to cover
|
Electrical Rough-In | 3/6/2020 | 3/6/2020 | 3/6/2020 | P | PASS |
James Ady
|
|
|
Mark- 2nd floor north east corner soutn stairwell Phone #: ###-#### NE corner drop ceiling ok to cover, 2nd floor south stair hard lid ok, 1st floor hard lid Offices 130D and C, Team rooms 130 G and F, open area 130E ok to cover
|
Electrical Rough-In | 3/5/2020 | 3/5/2020 | 3/5/2020 | P | PART |
James Ady
|
|
|
Second floor, east side ceiling // Mark Phone #: ###-#### SE ceiling only ok to cover (Note: NE inspected and ready for cover once SOE cords and Transmission cable removed by others.)
|
Electrical Rough-In | 3/2/2020 | 3/3/2020 | 3/3/2020 | A | PASS |
James Ady
|
|
|
Chad Phone #: ###-#### 1st floor Mens and Ladies restrooms ok to cover. 2nd floor Bull pin soffits ok to cover.
|
Electrical Rough-In | 2/28/2020 | 2/28/2020 | 2/28/2020 | P | PASS |
James Ady
|
|
|
Mark Phone #: ###-#### Drop ceiling only as marked on contractor print
|
Electrical Rough-In | 2/18/2020 | 2/18/2020 | 2/18/2020 | P | PASS |
Rock A. Hudson
|
|
|
Mark Phone #: ###-#### Phase 1 level 2 hardlids rough in ok cover
|
Electrical Rough-In | 2/6/2020 | 2/7/2020 | 2/7/2020 | A | PASS |
James Ady
|
|
|
Chad Phone #: ###-#### New doorway cut into brick wall only 2nd floor Walls only
|
Electrical Rough-In | 1/27/2020 | 1/28/2020 | 1/28/2020 | A | PASS |
James Ady
|
|
|
Mark Phone #: ###-#### Restroom, janitor closet walls only ok
|
Electrical Rough-In | 1/17/2020 | 1/17/2020 | 1/17/2020 | P | PASS |
James Ady
|
|
|
Mark Phone #: ###-#### as marked on print walls only ok to cover
|
Rough-In Permanent Service | 1/10/2020 | 1/10/2020 | 1/10/2020 | P | CANC |
James Ady
|
|
|
APPROVAL FOR COVER, CHADRICK Phone #: ###-#### no service needed
|
Electrical Rough-In | 1/10/2020 | 1/10/2020 | 1/10/2020 | P | PASS |
James Ady
|
|
|
APPROVAL FOR COVER, CHADRICK Phone #: ###-#### Areas marked on print ok to cover
|
Electrical Rough-In | 1/3/2020 | 1/3/2020 | 1/3/2020 | P | PASS |
James Ady
|
|
|
for cover // Chadrick Phone #: ###-#### 2nd floor areas only as marked on contractor print walls only ok to cover
|
Electrical Rough-In | 12/20/2019 | 12/20/2019 | 12/20/2019 | P | PASS |
James Ady
|
|
|
Chadrick Phone #: ###-#### Walls only as marked on print 1st and 2nd floor areas ok to cover
|
Electrical Rough-In | 12/13/2019 | 12/13/2019 | 12/13/2019 | P | PASS |
James Ady
|
|
|
for cover - Chadrick Phone #: ###-#### Vender meeting room and TV walls as marked on print.. ok to cover
|
Electrical Rough-In | 12/9/2019 | 12/9/2019 | 12/9/2019 | P | PASS |
James Ady
|
|
|
COVER INSPECTION, AS EARLY AS POSSIBLE PLEASE. CONTACT IS CHAD SANDOVAL Phone #: ###-#### Inspection requested via web by Scott Campbell As marked on contractor printout. (TV walls ok to oneside only) Partial rough in ok
|
Conference | 12/2/2019 | 12/2/2019 | 12/2/2019 | P | PASS |
James Ady
|
|
|
Contact is Chad Sandoval Phone #: ###-#### Inspection requested via web by Scott Campbell Discussed work allowed under early start permit. Electrical install allowed, if changes are required upon final plan review, changes will be made and will require additional inspections. Top out of walls to a height of 10ft ok to allow for duct work to bel installed. NO ONE SIDING will be allowed. Inspections are required as Per BCC.
|
Issue PAID IN FULL permit | | | 11/1/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 11/1/2019 | | DONE |
|
|
|
This permit was created on the web by Scott Campbell
|