Permit Information
Permit NumberELE19-04228
StatusIssued
Name QUALITY ELECTRIC INC
Site Address 8000 S FEDERAL WAY
Project Name 
Customer Number19103
ePlanReviewNo
Description
Addition: Electrical work for Early Start package on Micron Bldg 36, per approved contract documents
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Electrical Rough-In8/5/20208/5/20208/5/2020PPASS
DetailsJames Ady
SCREENED // Mark Phone #: ###-#### 0ffice walls only ok to cover
Electrical Rough-In8/4/20208/4/20208/4/2020PPASS
DetailsJames Ady
Screened- Mark Phone #: ###-#### Hard lids and wall rough in as marked and dated on contractor print. ok to cover
Electrical Rough-In7/29/20207/29/20207/29/2020PPASS
DetailsJames Ady
mark *screened* Phone #: ###-#### office walls only ok to cover
Electrical Rough-In7/22/20207/23/20207/23/2020APASS
DetailsJames Ady
Screened- 10 days ago framer tested positive for Covid- workers were quaranteen & area sanitize, WAS INFORM THAT THIS INSPECTION MAY BE CANCEL- Mark Phone #: ###-#### 8 offices as marked on contractor print walls only ok to cover
Electrical Rough-In7/14/20207/14/20207/14/2020PPASS
DetailsJames Ady
some framers quarantined on job site // Mark Phone #: ###-#### Pictures accepted office area Rough in walls only ok to cover as marked on contractor print
Electrical Rough-In7/8/20207/8/20207/8/2020PPASS
DetailsJames Ady
Mark - */Screened*/ Phone #: ###-#### 8 offices as marked on contractor print walls only
Electrical Rough-In7/6/20207/6/20207/6/2020PPASS
DetailsJames Ady
screened // Mark Phone #: ###-#### Virtual inspection done due to covid. rooms 271e,f,g,h and j. and room 271l,m,n, and p. walls only ok to cover
Electrical Rough-In6/26/20206/29/20206/29/2020APASS
DetailsJames Ady
screened // Mark Phone #: ###-#### Offices 270D, 270C and team room 270F and 270G walls only ok to cover
Electrical Rough-In6/8/20206/8/20206/8/2020PPASS
DetailsJames Ady
Screened- Chad Phone #: ###-#### underground for turn style entry ok to cover
Final5/26/20205/27/20205/27/2020APART
DetailsJames Ady
Screened- Mark Phone #: ###-#### 1st floor phase 1 area A and B final ok
Final5/11/20205/12/20205/12/2020APART
DetailsJames Ady
part final- Mark **screened** Phone #: ###-#### 2nd floor TCO only Areas A and B
Electrical Rough-In5/6/20205/7/20205/7/2020APASS
DetailsJames Ady
Mark Phone #: ###-#### Vestibule only ok to cover
Final4/30/20204/30/20204/30/2020PCANC
DetailsJames Ady
screened // Mark Phone #: ###-####
Electrical Rough-In4/30/20204/30/20204/30/2020PPASS
DetailsJames Ady
screened // Mark Phone #: ###-#### Rough in coffee bar and reception desk ok to cover
Final4/21/20204/22/20204/22/2020ACANC
DetailsJames Ady
Mark Phone #: ###-#### Not ready for final Hot check only. See RI detail
Electrical Rough-In4/22/20204/22/20204/22/2020APASS
DetailsJames Ady
Mark Phone #: ###-#### 1st floor N offices hot checked and ready to final (marked on contractor print)
Rough-In Permanent Service4/9/20204/9/20204/9/2020PPASS
DetailsJames Ady
overhead rough in - Mark screened for COVID-19 symptoms Phone #: ###-#### Inspection done via photos due to COVID-19 distancing.. Room 142B ceiling only ok to cover
Final4/6/20204/6/20204/6/2020PPART
DetailsJames Ady
Part Final 1st floor -- Mark ***cleared*** Phone #: ###-#### 1st floor cubicals and center offices partial final ok
Electrical Rough-In4/6/20204/6/20204/6/2020PPASS
DetailsJames Ady
2nd floor Hall way-- Mark ***cleared*** Phone #: ###-#### Second floor hallway, 1st floor quiet room ceilings only ok to cover
Electrical Rough-In3/26/20203/27/20203/27/2020APASS
DetailsJames Ady
bldg 36 2nd fl ceilling/ 1st floor corid. // mark Phone #: ###-#### 1st floor offices and corridor ceiling only ok to cover
Electrical Rough-In3/23/20203/23/20203/23/2020PPASS
DetailsJames Ady
Mark Phone #: ###-#### offices ok to set furniture
Electrical Rough-In3/18/20203/18/20203/18/2020PPASS
DetailsJames Ady
1B high ceiling // Mark Phone #: ###-#### Vendor room 142 E-F Soffit, Drop lids rooms 132B. 131 E-H A-D, 130A 120C-F,. Soffits 132A-B, Hot check room 200B, 231A,B,C,D,E,F,G,H,J,K,L,M,N,P, 220B,220E
Electrical Rough-In3/13/20203/13/20203/13/2020PPASS
DetailsJames Ady
BLD36 // Sec. fl 3 offices, 1st hard lids, s.e. t grid .... Mark Phone #: ###-#### Corrections in Offices and down bath made ok to cover. SE open office area 11ft ceiling ok to cover
Electrical Rough-In3/12/20203/12/20203/12/2020PPART
DetailsJames Ady
second floor celing and firt floor hard lids- Mark Phone #: ###-#### Office 241 missing VAV covers, Offices 231N and 231J Fire alarm not installed Patial cover of remaining office drop lids ok, 1st floor mens and womens restroom, portal entry and help desk hard lid ok to cover
Electrical Rough-In3/6/20203/6/20203/6/2020PPASS
DetailsJames Ady
Mark- 2nd floor north east corner soutn stairwell Phone #: ###-#### NE corner drop ceiling ok to cover, 2nd floor south stair hard lid ok, 1st floor hard lid Offices 130D and C, Team rooms 130 G and F, open area 130E ok to cover
Electrical Rough-In3/5/20203/5/20203/5/2020PPART
DetailsJames Ady
Second floor, east side ceiling // Mark Phone #: ###-#### SE ceiling only ok to cover (Note: NE inspected and ready for cover once SOE cords and Transmission cable removed by others.)
Electrical Rough-In3/2/20203/3/20203/3/2020APASS
DetailsJames Ady
Chad Phone #: ###-#### 1st floor Mens and Ladies restrooms ok to cover. 2nd floor Bull pin soffits ok to cover.
Electrical Rough-In2/28/20202/28/20202/28/2020PPASS
DetailsJames Ady
Mark Phone #: ###-#### Drop ceiling only as marked on contractor print
Electrical Rough-In2/18/20202/18/20202/18/2020PPASS
DetailsRock A. Hudson
Mark Phone #: ###-####
Phase 1 level 2 hardlids rough in ok cover
Electrical Rough-In2/6/20202/7/20202/7/2020APASS
DetailsJames Ady
Chad Phone #: ###-#### New doorway cut into brick wall only 2nd floor Walls only
Electrical Rough-In1/27/20201/28/20201/28/2020APASS
DetailsJames Ady
Mark Phone #: ###-#### Restroom, janitor closet walls only ok
Electrical Rough-In1/17/20201/17/20201/17/2020PPASS
DetailsJames Ady
Mark Phone #: ###-#### as marked on print walls only ok to cover
Rough-In Permanent Service1/10/20201/10/20201/10/2020PCANC
DetailsJames Ady
APPROVAL FOR COVER, CHADRICK Phone #: ###-#### no service needed
Electrical Rough-In1/10/20201/10/20201/10/2020PPASS
DetailsJames Ady
APPROVAL FOR COVER, CHADRICK Phone #: ###-#### Areas marked on print ok to cover
Electrical Rough-In1/3/20201/3/20201/3/2020PPASS
DetailsJames Ady
for cover // Chadrick Phone #: ###-#### 2nd floor areas only as marked on contractor print walls only ok to cover
Electrical Rough-In12/20/201912/20/201912/20/2019PPASS
DetailsJames Ady
Chadrick Phone #: ###-#### Walls only as marked on print 1st and 2nd floor areas ok to cover
Electrical Rough-In12/13/201912/13/201912/13/2019PPASS
DetailsJames Ady
for cover - Chadrick Phone #: ###-#### Vender meeting room and TV walls as marked on print.. ok to cover
Electrical Rough-In12/9/201912/9/201912/9/2019PPASS
DetailsJames Ady
COVER INSPECTION, AS EARLY AS POSSIBLE PLEASE. CONTACT IS CHAD SANDOVAL Phone #: ###-#### Inspection requested via web by Scott Campbell As marked on contractor printout. (TV walls ok to oneside only) Partial rough in ok
Conference12/2/201912/2/201912/2/2019PPASS
DetailsJames Ady
Contact is Chad Sandoval Phone #: ###-#### Inspection requested via web by Scott Campbell Discussed work allowed under early start permit. Electrical install allowed, if changes are required upon final plan review, changes will be made and will require additional inspections. Top out of walls to a height of 10ft ok to allow for duct work to bel installed. NO ONE SIDING will be allowed. Inspections are required as Per BCC.