BLD-Final | 9/26/2019 | 9/26/2019 | 9/26/2019 | P | PASS |
Mike Jordan
|
|
|
James Phone #: ###-####. OK for perm occ.
|
FIRE-Final Inspection | 9/18/2019 | 9/19/2019 | 9/19/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Previous corrections have been addressed. Building inspector to verify gate plan mod. James Phone #: ###-####
|
FIRE-Final Inspection | 7/22/2019 | 7/24/2019 | 7/24/2019 | P | PART |
Troy Cobbley
|
|
|
A temporary for life safety is being given until the knox box is mounted, all signage mounted (Ox tank and fire doors), bollards installed and exit discharge lights tested as discussed.
Zach Phone #: ###-####
|
BLD-Conference | 7/23/2019 | 7/23/2019 | 7/23/2019 | P | PEND |
Mike Jordan
|
|
|
zack Phone #: ###-####. Will be ok for Temp occ. once life/safety has given a temp occ. and the building official has approved the removal of the added gate from the court yard for proper egress width.
|
BLD-Final | 7/19/2019 | 7/22/2019 | 7/22/2019 | P | PEND |
Mike Jordan
|
|
|
James Phone #: 205-908-480. Partial walk through on Area A. Needs to complete fire stopping at plumbing penetrations at rated walls, provide listing for clean out covers. Also area D provide rated fire extinguisher cabinant at rated walls in corridor next to mech room. Still need to ealk areas B, C , D and E.
|
BLD-Conference | 7/19/2019 | 7/19/2019 | 7/19/2019 | P | DONE |
Mike Jordan
|
|
|
|
BLD-Ceiling Grid Inspection | 7/18/2019 | 7/19/2019 | 7/19/2019 | A | PASS |
Mike Jordan
|
|
|
James Phone #: ###-####
|
BLD-Final | 7/12/2019 | 7/15/2019 | 7/15/2019 | P | NR |
Mike Jordan
|
|
|
James Phone #: ###-####
|
FIRE-Conference | 7/2/2019 | 7/3/2019 | 7/3/2019 | A | DONE |
Troy Cobbley
|
|
|
Per the agreement/discussion between myself/Chief Romeo and the general contractor equipment is allowed to be brought into the buidling for final installation as long as the fire sprinkler system is fully functional and the fire alarm system is monitoring the sprinkler system. Today I verified that the fire sprinkler riser devices are interconnected and tested to the new fire alarm system. Off site monitoring was verified. The monitoring is to remain active outside of normal work activities.
james Phone #: ###-####
|
FIRE-Conference | 7/2/2019 | 7/2/2019 | 7/2/2019 | P | DONE |
Troy Cobbley
|
|
|
The superintendant and I went over basic requirements for fire loading the building.
|
BLD-Ceiling Grid Inspection | 6/25/2019 | 6/26/2019 | 6/26/2019 | P | PASS |
Mike Jordan
|
|
|
James Phone #: ###-####. remainder of grid ok.
|
BLD-Ceiling Grid Inspection | 6/14/2019 | 6/17/2019 | 6/17/2019 | P | PASS |
Mike Jordan
|
|
|
james Phone #: ###-####. Kitchen and freezer room only ok to install tile.
|
BLD-Ceiling Grid Inspection | 6/6/2019 | 6/7/2019 | 6/7/2019 | P | PASS |
Mike Jordan
|
|
|
James Phone #: ###-####. Areas D and E grids 16 to 10.
|
FIRE-Final Inspection | 6/4/2019 | 6/6/2019 | 6/6/2019 | P | NR |
Troy Cobbley
|
|
|
Fire Conference - I went over general life safety requirements such as addressing and the fire dept access. James Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 6/5/2019 | 6/6/2019 | 6/6/2019 | A | PASS |
Mike Jordan
|
|
|
james Phone #: ###-####. Area E North east portion only to grid 16 ok.
|
BLD-Ceiling Grid Inspection | 5/20/2019 | 5/21/2019 | 5/21/2019 | P | PART |
Mike Jordan
|
|
|
James Phone #: ###-####. Area 2 ceiling grid. Noted areas at 1hr smoke barrier, 2hr. fire wall and at joints not ready for cover.
|
BLD-Ceiling Grid Inspection | 5/10/2019 | 5/10/2019 | 5/12/2019 | P | PASS |
Dave Hannah
|
|
|
James- above celing insp Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 5/8/2019 | 5/9/2019 | 5/9/2019 | A | NR |
Mike Jordan
|
|
|
James Phone #: ###-####. Area A above grid not ready. Several assemblies not yet completd.
|
BLD-Framing/Rough-in | 5/2/2019 | 5/3/2019 | 5/3/2019 | A | PASS |
Mike Jordan
|
|
|
James Phone #: ###-####. Walk through for double side at area H. Ok except for bathroom.
|
BLD-Framing/Rough-in | 4/29/2019 | 4/29/2019 | 4/29/2019 | P | PASS |
Mike Jordan
|
|
|
James Phone #: ###-####. Interior steel stud framed walls for area H ok.
|
BLD-Ceiling Grid Inspection | 4/24/2019 | 4/25/2019 | 4/25/2019 | A | PASS |
Mike Jordan
|
|
|
James Phone #: ###-####. Restroom hardlids ok in area D.
|
BLD-Ceiling Grid Inspection | 4/19/2019 | 4/22/2019 | 4/22/2019 | P | PASS |
Mike Jordan
|
|
|
James Phone #: ###-####. Ok to start i stalling ceiing tile in ares A and B.
|
BLD-Framing/Rough-in | 4/16/2019 | 4/17/2019 | 4/17/2019 | A | PASS |
Mike Jordan
|
|
|
James- inspection on Shear rock Phone #: ###-####. Insulation in electrical romm and fire riser room walls. Completion of 1hr. firewall behind freezer ok to cover.
|
BLD-Framing/Rough-in | 4/12/2019 | 4/12/2019 | 4/12/2019 | P | PASS |
Mike Jordan
|
|
|
James Phone #: ###-####. Interior steel stud framed walls area F and G, ok to double side.
|
BLD-Framing/Rough-in | 4/9/2019 | 4/9/2019 | 4/9/2019 | P | PASS |
Mike Jordan
|
|
|
James Phone #: ###-####. OK to one side 1 hr. fire walls in food storage room for install of walk in freezer.
|
BLD-Framing/Rough-in | 4/5/2019 | 4/8/2019 | 4/8/2019 | A | PART |
Mike Jordan
|
|
|
Bobbie Phone #: ###-####. Interior steel stud framed walls and sofits in areas F and G. Work is in progress. Needs to complete puddy pads on corridor 1hr. smoke barrier wall.
|
BLD-Framing/Rough-in | 4/2/2019 | 4/3/2019 | 4/3/2019 | A | PASS |
Mike Jordan
|
|
|
Zack Phone #: ###-####. INterior steel stud frmed walls at area E to gridline 16 and lobby area. Remaing hardlids in Area D ok.
|
BLD-Energy code compliance | 4/2/2019 | 4/2/2019 | 4/2/2019 | P | PASS |
Mike Jordan
|
|
|
Are E, North exterior wall.
|
BLD-Framing/Rough-in | 4/1/2019 | 4/2/2019 | 4/2/2019 | A | PASS |
Mike Jordan
|
|
|
James Phone #: ###-####. Area D bathroom hardlids. Area E interior steel stud walls, and rockwool at top of walls ok.
|
BLD-Ceiling Grid Inspection | 3/21/2019 | 3/22/2019 | 3/22/2019 | P | PASS |
Mike Jordan
|
|
|
above ceiling inspection // James Phone #: ###-####. Bathroom hardlids only, Areas B and C.
|
BLD-Framing/Rough-in | 3/20/2019 | 3/21/2019 | 3/21/2019 | A | PASS |
Mike Jordan
|
|
|
James Phone #: ###-####. Interior steel stud franed walls for data room only. Ok to one side data room only for equipment install.
|
BLD-Framing/Rough-in | 3/18/2019 | 3/19/2019 | 3/19/2019 | A | NR |
Mike Jordan
|
|
|
James Phone #: ###-####. hardlid areas not ready.
|
BLD-Conference | 3/13/2019 | 3/13/2019 | 3/13/2019 | P | DONE |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 3/4/2019 | 3/5/2019 | 3/5/2019 | A | PASS |
Mike Jordan
|
|
|
Zach Phone #: ###-####. Interior steel stud framed wall in area C ok to cover. Area H electrical room ok to one side to hang electrical panels.
|
BLD-Energy code compliance | 3/5/2019 | 3/5/2019 | 3/5/2019 | A | PASS |
Mike Jordan
|
|
|
Zach Phone #: ###-####. Area C.
|
BLD-Framing/Rough-in | 2/28/2019 | 3/1/2019 | 3/1/2019 | A | PASS |
Mike Jordan
|
|
|
Base layer of 5/8 type x rock on 2hr. fire wall at area C and D seperation.
|
BLD-Framing/Rough-in | 2/27/2019 | 2/27/2019 | 2/27/2019 | P | PASS |
Mike Jordan
|
|
|
Work in progress on areas b and C.
|
BLD-Energy code compliance | 2/27/2019 | 2/27/2019 | 2/27/2019 | P | PASS |
Mike Jordan
|
|
|
Area B and area C exterior walls ok to cover.
|
BLD-Framing/Rough-in | 2/22/2019 | 2/27/2019 | 2/27/2019 | A | CANC |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 2/22/2019 | 2/22/2019 | 2/22/2019 | P | PASS |
Mike Jordan
|
|
|
Interior steel stud framed walls for areas B and C. All menbrane penetrations have been protected at rated walls. Still needs to insulate exterior walls .
|
BLD-Framing/Rough-in | 2/20/2019 | 2/21/2019 | 2/21/2019 | A | NR |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 2/20/2019 | 2/21/2019 | 2/21/2019 | A | NR |
Mike Jordan
|
|
|
James Phone #: ###-####
|
BLD-Framing/Rough-in | 2/13/2019 | 2/14/2019 | 2/14/2019 | P | PASS |
Mike Jordan
|
|
|
Parapet construction at areas D and E.
|
BLD-Framing/Rough-in | 2/13/2019 | 2/13/2019 | 2/13/2019 | P | PEND |
Mike Jordan
|
|
|
Weekly visit to check on work in progress. Sheetrocking remaing walls in area A, one side sheet rock in area B from roof deck to ceiling elevation. More work on @hr. fire wall seperating Area C and D. Will inspect parapet construction on 2-14-19.
|
BLD-Framing/Rough-in | 2/7/2019 | 2/13/2019 | 2/13/2019 | A | CANC |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 2/8/2019 | 2/8/2019 | 2/8/2019 | P | PASS |
Mike Jordan
|
|
|
Area A exterior walls.
|
BLD-Framing/Rough-in | 2/7/2019 | 2/8/2019 | 2/8/2019 | A | PASS |
Mike Jordan
|
|
|
James Phone #: ###-####. Area C exterior walls ok to cover on exterior side only. Area A ok to sheet rock. Araa B Ok to start one sideing only.
|
BLD-Framing/Rough-in | 2/6/2019 | 2/7/2019 | 2/7/2019 | A | PART |
Mike Jordan
|
|
|
exterior framing /// James Phone #: ###-####. Exterior steel stud framed walls at areas D and E, work is still in progess. Still needs to repair headers fro areas C .
|
BLD-Framing/Rough-in | 1/31/2019 | 2/1/2019 | 2/1/2019 | P | FAIL |
Mike Jordan
|
|
|
James Phone #: ###-####. Area B interior steel stud framed walls. Needs to complete top of wall and mebrane penetration protection at 1hr. smoke barriers and 1hr. fire barries and recall framing inspection when completed.
|
BLD-Framing/Rough-in | 1/17/2019 | 1/18/2019 | 1/18/2019 | A | PASS |
Mike Jordan
|
|
|
James Phone #: ###-####. Interior steel stud framed walls (sound walls and smoke partitions) at area A only ok to one side.
|
BLD-Framing/Rough-in | 1/10/2019 | 1/11/2019 | 1/11/2019 | A | PASS |
Mike Jordan
|
|
|
James Phone #: ###-####. Exterior wall framing at area 2, ok to cover exterior side only.
|
BLD-Framing/Rough-in | 1/2/2019 | 1/2/2019 | 1/2/2019 | P | PART |
Mike Jordan
|
|
|
MJ Phone #: ###-####. Exterior walls for area A ok to dens glass exterior side only.
|
BLD-Wall Bracing | 12/13/2018 | 12/14/2018 | 12/14/2018 | A | CANC |
Mike Jordan
|
|
|
James Phone #: ###-####
|
BLD-Framing/Rough-in | 12/14/2018 | 12/14/2018 | 12/14/2018 | A | PASS |
Mike Jordan
|
|
|
James Phone #: ###-####. Area E chevron bracing ok.
|
BLD-Framing/Rough-in | 12/7/2018 | 12/7/2018 | 12/7/2018 | P | PART |
Mike Jordan
|
|
|
Work in progress on exterior steel stud walls at area a on grids 1 thru 8 on grids A,d and G. Still needs to install bridging, clips on lower sills and reshoot bottom track with correct shot pins. ok to sheet exterior in this area only.
|
BLD-Framing/Rough-in | 12/6/2018 | 12/7/2018 | 12/7/2018 | A | NR |
Mike Jordan
|
|
|
James Phone #: ###-####. Needs to provide exterior wall details for welding, stud type ,spacong and connections.
|
BLD-Concrete | 11/19/2018 | 11/20/2018 | 11/20/2018 | P | CANC |
Mike Jordan
|
|
|
rebar-James Phone #: ###-####
|
BLD-Foundation | 11/19/2018 | 11/20/2018 | 11/20/2018 | A | PART |
Mike Jordan
|
|
|
stem wall // James Phone #: ###-####. Stemwalls for area 3, Needs to clean dirt and debrie from bottom. Will have special inspection. Special inspector to verify bottom of stemwall has been cleaned.
|
BLD-Concrete | 11/5/2018 | 11/5/2018 | 11/5/2018 | P | PART |
Mike Jordan
|
|
|
rebar- James Phone #: ###-####. Welded wire mesh and turn downs for interior slb on grade at area 2. Footings in area 4 on grids K and 7.
|
BLD-Framing/Rough-in | 10/31/2018 | 11/1/2018 | 11/1/2018 | A | DEFR |
Mike Jordan
|
|
|
steel -James Phone #: ###-####. Will have special inspection.
|
BLD-Foundation | 10/23/2018 | 10/24/2018 | 10/24/2018 | A | PART |
Mike Jordan
|
|
|
rebar-James Phone #: ###-####. Interior column pad footings for area C.
|
BLD-Foundation | 10/3/2018 | 10/5/2018 | 10/5/2018 | A | PASS |
Mike Jordan
|
|
|
rebar // James Phone #: ###-####. Rmainder of area 2 and interior column pad footings in area 2. Prevoios exterior column pad footings on area 2 that were missing the top mat have been repaired. Exterior footings for area 3.
|
BLD-Foundation | 9/19/2018 | 9/20/2018 | 9/20/2018 | A | PART |
Mike Jordan
|
|
|
James Phone #: ###-####. Exterior perimeter footings for Area 2. Noted 4 F4B type column pad footings that require top and bottom mats of #4 rebar. Only one mat has been installed at this time. Special inspector to verify repair of these 4 F4B column pad footings prior to concrete placement.
|
BLD-Concrete | 9/18/2018 | 9/19/2018 | 9/19/2018 | A | PASS |
Mike Jordan
|
|
|
rebar- James Phone #: ###-####. Exterior footings for area A and interior column pad footings for area A on grid e and D.1 (first 4 only from south end).
|
BLD-Conference | 9/17/2018 | 9/17/2018 | 9/17/2018 | P | CANC |
Mike Jordan
|
|
|
James-rebar Phone #: ###-####. Cancelled per contractor via phone call.
|
BLD-Foundation | 9/14/2018 | 9/17/2018 | 9/17/2018 | A | NR |
Mike Jordan
|
|
|
James-rebar Phone #: ###-####. No city approved plans on jobsite. rescheduled for pm inspection.
|