General Inspection | 2/12/2018 | 2/12/2018 | 2/15/2018 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 2/15/2018 | 2/15/2018 | 2/15/2018 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 1/26/2018 | 1/26/2018 | 1/26/2018 | | PASS |
Michael Zawacki
|
|
|
One remaining home. Talked to developer a few weeks ago, soon as witches hats removed I will close permit.
|
General Inspection | 1/11/2018 | 1/11/2018 | 1/11/2018 | | PASS |
Michael Zawacki
|
|
|
One home being built, rest of phase has final stabalization. Called Jim Conger and let him know he can pull out inlet protection. Once BMPs are removed permit can be closed.
|
General Inspection | 12/27/2017 | 12/27/2017 | 12/27/2017 | | PASS |
Michael Zawacki
|
|
|
Last lot has house under construction. Interior work in progress,
|
General Inspection | 12/12/2017 | 12/12/2017 | 12/12/2017 | | PASS |
Michael Zawacki
|
|
|
1 home still under construction. DIs still installed.
|
General Inspection | 11/27/2017 | 11/27/2017 | 11/27/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/10/2017 | 11/10/2017 | 11/13/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/26/2017 | 10/26/2017 | 10/26/2017 | | PASS |
Michael Zawacki
|
|
|
Nearly complete.
|
General Inspection | 10/5/2017 | 10/11/2017 | 10/11/2017 | A | PASS |
Michael Zawacki
|
|
|
Nearing final completion. No dirt or track out. Inlet protection is about half full, will probably need to be cleaned before end of fall.
|
General Inspection | 10/5/2017 | 10/5/2017 | 10/5/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/20/2017 | 9/20/2017 | 9/20/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/5/2017 | 9/5/2017 | 9/8/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/21/2017 | 8/21/2017 | 8/22/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/4/2017 | 8/4/2017 | 8/4/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/20/2017 | 7/20/2017 | 7/20/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/5/2017 | 7/5/2017 | 7/5/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/20/2017 | 6/20/2017 | 6/20/2017 | | PART |
Andy J. Long
|
|
|
WIP on SFHs on Hacienda and Baron. DI bags still installed on subdivision storm drains.
Request is issued to Evans construction to complete clean up on staging and washout lot on Bagley.
|
General Inspection | 6/5/2017 | 6/5/2017 | 6/5/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/19/2017 | 5/19/2017 | 5/19/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/4/2017 | 5/4/2017 | 5/9/2017 | | PEND |
Andy J. Long
|
|
|
To final this subdivision ESC permit:
- remove all temporary BMPs ( DI bags) in strom drains - clean up concrete washout and staging area on Bagley. - remove permit signs on completed & stabilized projects. No significant trackout, no spills or discharges observed. No stockpiles on the street. Some active SFHs in progress by Downey and Evan construction
|
General Inspection | 4/19/2017 | 4/19/2017 | 4/19/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/4/2017 | 4/4/2017 | 4/5/2017 | | FAIL |
Andy J. Long
|
|
|
Need to clean up and remove existing concrete washout and dumped materials. Correction request already issued to Evan Construction & Tahoe.
|
General Inspection | 3/20/2017 | 3/20/2017 | 3/21/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/3/2017 | 3/3/2017 | 3/3/2017 | | PEND |
Andy J. Long
|
|
|
request for new concrete washout facility issued 3/2. RP for D. Evans construction said one would be installed by next week as well as street sweeping...
|
General Inspection | 2/16/2017 | 2/16/2017 | 2/21/2017 | | CANC |
Melissa Jannusch
|
|
|
|
General Inspection | 2/1/2017 | 2/1/2017 | 2/6/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/17/2017 | 1/17/2017 | 1/19/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/30/2016 | 12/30/2016 | 12/30/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/15/2016 | 12/15/2016 | 12/15/2016 | | PASS |
Andy J. Long
|
|
|
WIP on SFH by Z. Evans and Tahoe. Subdivision BMPs installed. No significant trackout or muddy runoff observed. All homes in framing phase or beyond, no concrete or excavation occuring. No corrections.
|
General Inspection | 11/30/2016 | 11/30/2016 | 11/30/2016 | | PASS |
Andy J. Long
|
|
|
WIP on SFHs. Subdivision stormwater facilitiies installed and have sediment protection. Lots of activity, trackout and loose dirt from landscaping activity swept weekly. No trash issues, spills, or other violations observed. Lined concrete washout pit provided
|
General Inspection | 11/15/2016 | 11/15/2016 | 11/15/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/31/2016 | 10/31/2016 | 11/1/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/14/2016 | 10/14/2016 | 10/14/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/28/2016 | 9/29/2016 | 9/30/2016 | A | PASS |
Andy J. Long
|
|
|
Numerous SFHs in progress permitted seperately. No subdivion work remaining. DI bags installed. Concrete washout provided. No discharges or trackout from subdivision.
|
General Inspection | 9/28/2016 | 9/28/2016 | 9/28/2016 | | CANC |
Andy J. Long
|
|
|
rescheduled 9/29
|
General Inspection | 9/13/2016 | 9/13/2016 | 9/13/2016 | | PASS |
Evan Jenkins
|
|
|
work is occuring on multiple SFH's on all flat lots. no issues observed
|
General Inspection | 8/29/2016 | 8/29/2016 | 8/29/2016 | | PASS |
Evan Jenkins
|
|
|
Subdivision is clean. No ESC issues observed at this time. Work occuring on multiple SFH's
|
General Inspection | 8/12/2016 | 8/12/2016 | 8/12/2016 | | PASS |
Evan Jenkins
|
|
|
|
Random Inspection | 7/28/2016 | 7/28/2016 | 7/28/2016 | A | PASS |
Evan Jenkins
|
|
|
work occuring on multiple SFH's. Subdivision is overall in good shape. No ESC conditions observed at this time
|
General Inspection | 7/27/2016 | 7/27/2016 | 7/27/2016 | | PASS |
Andy J. Long
|
|
|
WIP on SFHs by Tahoe and Z. Evans Construction. Two concrete washouts provided, no areas of significant trackout . Sites have trash containment and are relatively clean/well kept. Storm drains fitted with sediment filter bags.
|
General Inspection | 7/12/2016 | 7/12/2016 | 7/12/2016 | | PART |
Evan Jenkins
|
|
|
Multiple SFH's under construction. Concrete washout is near 50% full: needs maintenance. Minor trackout had occured from sundays rains. week curbs and sidewalks and parts of road. No other issues observed
|
General Inspection | 6/27/2016 | 6/27/2016 | 6/27/2016 | | PART |
Evan Jenkins
|
|
|
WIP: on multiple SFH's. Some minor troughout througthout site needs to be swept along with various sidewalk areas
|
General Inspection | 6/10/2016 | 6/10/2016 | 6/10/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/26/2016 | 5/26/2016 | 5/27/2016 | | PASS |
Andy J. Long
|
|
|
WIP on SFHs at Belmar by Tahoe and Zach Evans Construction. DI bags installed, lined concrete washout utilized, and trash contained. No trackout or discharges within or outside of sub. No corrections issued.
|
General Inspection | 5/11/2016 | 5/11/2016 | 5/11/2016 | | PASS |
Andy J. Long
|
|
|
Belmar SFHs in progress by Z. Evans Construction and Tahoe Homes that are permitted seperately. Sites are clean, no trackout or discharges outside of subdivision. Trash containers and designated concrete washout provided.
|
General Inspection | 4/21/2016 | 4/21/2016 | 4/21/2016 | | PASS |
Evan Jenkins
|
|
|
|
Random Inspection | 3/31/2016 | 3/31/2016 | 3/31/2016 | P | PASS |
Andy J. Long
|
|
|
WIP on SFHs by Zach Evans Construction and Tahoe. Lined washouts being used, trash contained, and DI bags are installed. No major trackout. No spills or discharges.
|
Random Inspection | 2/23/2016 | 2/23/2016 | 2/23/2016 | P | PASS |
Andy J. Long
|
|
|
Subdivision work complete. SFHs have seperate ESC permits under ZEvan Const. and Tahoe Homes. DIs have inlet protection that has been maintained. No erosion or sediment coming off lots.
Corrections isssued to home builders for housekeeping (trash container/cement washout)
|
General Inspection | 1/26/2016 | 1/26/2016 | 1/26/2016 | P | PART |
Andy J. Long
|
|
|
WIP on north end of Belmar Estates has homes by Tahoe and Zach Evans construction. Significant amount of trackout and lack of house keeping, subdivision is unoccupied currently. DIs have protection.
Need to have street sweeper at end of the week.
|
General Inspection | 12/1/2015 | 12/1/2015 | 12/1/2015 | P | PASS |
Andy J. Long
|
|
|
Belmar roads and stormwater infrastructure is now complete. All new DIs have been fitted with sediment filter bags. No trackout from subdivision to Pierce Park. Perimeter to the south in general direction of slight slope is well vegetated with no surface waters in the area.
WIP on landscaping, subdivision fencing and some utility trenching for parcels.
|
General Inspection | 11/3/2015 | 11/3/2015 | 11/3/2015 | A | PASS |
Andy J. Long
|
|
|
WIP on paving roads within already installed curbing. Also need to patch subdivision entrance at Pierce Park so there is some loose sediment currently that will be swept up completion. No discharges occuring, site perimeter is no longer being operated on and no sediment is leaving site and stormwater infrastructure has been installed. No corrections at this time, will monitor sweeping once road work is complete. No recent complaints received.
|
Tracking Control | 10/8/2015 | 10/8/2015 | 10/8/2015 | P | PASS |
Andy J. Long
|
|
|
All roads have now been covered by roadbase so significantly less hauling traffic going forward. Roads are being prepped for paving within site. Sweeping occured last night as requested, road looks better today. Entance was getting muddy from irrigation runoff down Pierce Park, a check dam has been made to dry to keep entrance dry and RP asked neighbor to control irrigation runoff if possible. Entrance covered with road base to cover mud area.
RP stated sweeping to occur today at noon and at end of day. Site to be inactive tomorrow. Approved.
|
Complaint Inspection | 10/7/2015 | 10/7/2015 | 10/7/2015 | P | FAIL |
Andy J. Long
|
|
|
Complaint called in regarding trackout to Pierce Park south of Hill Road.
Observation:
Bringing in dirt and road mix for road paving which will happen later this week, significant heavy truck traffic in and out of site.
Stabilized entrance was removed for utility installation, so now trackout is occuring.
Called developer/RP Jim Conger to request sweeping ASAP to reduce build up. Got vm, will check back...
Coir mats are installed on the storm drains.
CA paving is the contractor.
|
General Inspection | 9/22/2015 | 9/22/2015 | 9/22/2015 | P | PASS |
Evan Jenkins
|
|
|
WIP: No issues observed at this time. No trackout nor dust occuring from construction
|
General Inspection | 8/26/2015 | 8/26/2015 | 8/26/2015 | P | PASS |
Andy J. Long
|
|
|
WIP on sewer and utilities for new Belmar subdivision. Work is concentrated around single trench area so no fugitive dust issues observed. No dewatering discharges observed offsite. No trackout onto Pierce Park; ESC permit sign and CGP information is posted. Approved.
|
Site Preparation | 7/28/2015 | 7/28/2015 | 7/28/2015 | P | PASS |
Andy J. Long
|
|
|
Permit sign posted at entrance, SWPPP and NOI onsite.
Some initial grubbing and outbuilding demolition has occured. No fugitive dust observed. Initial BMPs installed. Will need to add material storage area and concrete washout for curb work.
Approved to excavate.
|
Site Preparation | 7/27/2015 | 7/28/2015 | 7/28/2015 | A | PEND |
Andy J. Long
|
|
|
re-scheduled for PM ride-along
|