General Inspection | 12/25/2018 | 12/25/2018 | 12/26/2018 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 12/26/2018 | 12/26/2018 | 12/26/2018 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 12/10/2018 | 12/10/2018 | 12/10/2018 | | PASS |
Andy J. Long
|
|
|
snow covered conditions. Construction complete. Project is in monitoring phase for slope revegetation
|
General Inspection | 11/23/2018 | 11/23/2018 | 11/23/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/8/2018 | 11/8/2018 | 11/8/2018 | | PEND |
Andy J. Long
|
|
|
|
General Inspection | 10/24/2018 | 10/24/2018 | 10/24/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/9/2018 | 10/9/2018 | 10/9/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/24/2018 | 9/24/2018 | 9/24/2018 | | PEND |
Andy J. Long
|
|
|
Will wait for next stair step phase on Camel's Back
|
General Inspection | 9/7/2018 | 9/7/2018 | 9/7/2018 | | PEND |
Andy J. Long
|
|
|
|
General Inspection | 8/23/2018 | 8/23/2018 | 8/23/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/8/2018 | 8/8/2018 | 8/8/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/24/2018 | 7/24/2018 | 7/24/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/9/2018 | 7/9/2018 | 7/9/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/20/2018 | 6/22/2018 | 6/22/2018 | A | PASS |
Andy J. Long
|
|
|
No erosion issues along the stairs and slope stabilzing walls. Some blankets have come lose but vegetation is growing. Matted area on north section with ECBs is sparsely vegetated.
Area is maintained by Ridge to Rivers and Parks and Rec.
No ESC corrections.
|
General Inspection | 6/19/2018 | 6/19/2018 | 6/20/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/4/2018 | 6/4/2018 | 6/4/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/18/2018 | 5/18/2018 | 5/18/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/30/2018 | 4/30/2018 | 5/3/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/3/2018 | 5/3/2018 | 5/3/2018 | P | PEND |
Andy J. Long
|
|
|
Staging area and access road to top of Camel's Back has revegetated well, no erosion or runoff issues observed.
Rock retaining walls have helped stabilized the chute, but areas in between have sparse vegetation growing through erosion control blanket. Some areas of blanket are improperly installed and not trench in at top of slope and perpinducular to slope.
Will check with PW Hillside and Parks n Rec to see if we want to have these installations fixed and a more native mix installed.
|
General Inspection | 4/13/2018 | 4/13/2018 | 4/13/2018 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 3/29/2018 | 3/29/2018 | 3/29/2018 | | PASS |
Michael Zawacki
|
|
|
No signs of failure from bottom.
|
General Inspection | 3/14/2018 | 3/14/2018 | 3/14/2018 | | PEND |
Andy J. Long
|
|
|
waiting for vegetation establishment under ECB installation.
|
General Inspection | 2/27/2018 | 2/27/2018 | 2/27/2018 | | PASS |
Michael Zawacki
|
|
|
Frozen.
|
General Inspection | 2/12/2018 | 2/12/2018 | 2/15/2018 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 1/26/2018 | 1/26/2018 | 1/26/2018 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 1/11/2018 | 1/11/2018 | 1/12/2018 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 12/27/2017 | 12/27/2017 | 12/29/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/12/2017 | 12/12/2017 | 12/14/2017 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 11/27/2017 | 11/27/2017 | 11/27/2017 | | PASS |
Michael Zawacki
|
|
|
Observation from Base. Appears stable, no rills coming down hill.
|
General Inspection | 11/10/2017 | 11/10/2017 | 11/13/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/11/2017 | 10/11/2017 | 10/11/2017 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 9/26/2017 | 9/26/2017 | 9/26/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/11/2017 | 9/11/2017 | 9/13/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/25/2017 | 8/25/2017 | 8/25/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/10/2017 | 8/10/2017 | 8/14/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/26/2017 | 7/26/2017 | 7/26/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/5/2017 | 7/5/2017 | 7/6/2017 | | PEND |
Andy J. Long
|
|
|
Hillside erosion controls (blankets and seeding) appears to be stabilizing slopes along the new stairs for Camels Back chute resotoration. Approximately 50-60% vegetation coverage. No rips or tears in blanket observed.
Area north of summit with ECBs has not vegetated well. May need a new application in Fall.
No immediate corrections, will continue to monitor.
|
General Inspection | 5/12/2017 | 5/12/2017 | 5/12/2017 | P | PEND |
Andy J. Long
|
|
|
Project complete. Permit open to monitor revegetation/slope stabilization. Erosion control blankets have been installed, in some areas incorrectly- may need to repair and reseed this Fall. Do not close this permit
|
General Inspection | 11/21/2016 | 11/21/2016 | 11/21/2016 | A | PART |
Andy J. Long
|
|
|
ESC permit signs posted at bottom of hill in park and at 9th street staging area. No trackout, sediment runoff or other materials leaving work and staging area.
Silt fence installed be first rock wall of the chut stabilization project.
Corrections:
- install perimeter control at bottom of access road on back side. Need water bars or drainage to control to prevent concentrating runoff on the access road - provide erosion control wattle below new drainage outside of chute and/or mulch to cover the bare disturbed ground. - remove stockpiles off wire back fence along top of hill and/or install wattle along rim.
Notified RP via phone. No activity at time of inspection.
|
General Inspection | 10/26/2017 | 10/26/2017 | | | |
Michael Zawacki
|
|
|
|