Site Final | 5/10/2019 | 5/10/2019 | 5/10/2019 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 5/10/2019 | 5/10/2019 | 5/10/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/25/2019 | 4/25/2019 | 4/25/2019 | | PASS |
Michael Zawacki
|
|
|
Still some bare areas, no ESC issues.
|
General Inspection | 4/10/2019 | 4/10/2019 | 4/15/2019 | | PASS |
Michael Zawacki
|
|
|
One empty lot on the northwest corner, no ground cover. Grass is starting to grow on terraced slopes. Area is landscaped. Dasco is working next to site.
|
General Inspection | 3/26/2019 | 3/26/2019 | 3/26/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/11/2019 | 3/11/2019 | 3/12/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/22/2019 | 2/22/2019 | 2/27/2019 | | PASS |
Michael Zawacki
|
|
|
Work completed, mostly stabalized. No issues.
|
General Inspection | 2/7/2019 | 2/7/2019 | 2/7/2019 | | PASS |
Michael Zawacki
|
|
|
Site is clean, most ground work completed.
|
General Inspection | 1/22/2019 | 1/22/2019 | 1/22/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/7/2019 | 1/7/2019 | 1/8/2019 | | PEND |
Andy J. Long
|
|
|
Former RP has moved companies. Need to find new contact with Layton Construction.
No offsite discharges or trackout. 3 Buildings complete, some open areas still remain within business park.
There is some erosion on the bank at bottom of site near railroad tracks as well as some construction trash that needs to be picked up.
|
Site Final | 11/13/2018 | 11/14/2018 | 11/15/2018 | P | NR |
Michael Zawacki
|
|
|
|
General Inspection | 11/12/2018 | 11/12/2018 | 11/13/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/26/2018 | 10/26/2018 | 10/26/2018 | | PART |
Michael Zawacki
|
|
|
Old silt fence by auto auction can be removed. Gravel bags and inlet protection can be removed from cul-de-sac. Some bare areas still in industrial area, will mpnitor for final stabalization.
|
General Inspection | 10/11/2018 | 10/11/2018 | 10/11/2018 | P | PASS |
Andy J. Long
|
|
|
All 3 buildings are constructed. Some areas of site need stabilization and to monitor areas that have been seeded. Site is paved and stormwater is retained on site. No corrections requested
|
Conference | 9/28/2018 | 10/1/2018 | 10/1/2018 | P | CANC |
Andy J. Long
|
|
|
data entry error
|
General Inspection | 9/28/2018 | 9/28/2018 | 9/28/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/6/2018 | 9/13/2018 | 9/13/2018 | A | PASS |
Michael Zawacki
|
|
|
All lots paved and sidewalks complete. Landscapers are working on sod and final stabalization.
|
General Inspection | 9/6/2018 | 9/6/2018 | 9/6/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/22/2018 | 8/22/2018 | 8/22/2018 | | PASS |
Michael Zawacki
|
|
|
All lots paved, curb, gutters, and sidewalks completed. Currently spreading topsoil back over site. Expected to hydroseed are in next few weeks.
|
General Inspection | 8/7/2018 | 8/7/2018 | 8/7/2018 | | PASS |
Michael Zawacki
|
|
|
Site prep for paving. Graders and water truck leveling road base. Building exterior work completed, curb, gutter, and sidewalks installed.
|
General Inspection | 7/20/2018 | 7/20/2018 | 7/20/2018 | | PASS |
Michael Zawacki
|
|
|
WIP on retention pond. 2 buildings completed, some of area paved. No dust or other ESC issues.
|
Random Inspection | 6/25/2018 | 6/25/2018 | 6/25/2018 | P | PASS |
Andy J. Long
|
|
|
Gowen Industrial park buildings and site improvements are in progress.
SWPPP and Boise ESC permit sign posted on Eisenman and Beechcraft. No trackout from site entrances, concrete washout facility located on site. MS4 stormdrains have sediment protection.
No corrections requested. See also ESC17-01043
|
General Inspection | 5/24/2018 | 5/24/2018 | 5/24/2018 | P | PASS |
Michael Zawacki
|
|
|
Entire site inspection. WIP on 3 tilt ups. Curbing is about half complete, site is free from dust and loose trash. Concrete washout is almost full. Some light trackout.
|
General Inspection | 5/10/2018 | 5/10/2018 | 5/10/2018 | P | PASS |
Michael Zawacki
|
|
|
Shells of two tilt ups complete and working on cores. WIP on construction of third tilt up. Site is prepped for curb, paving supposed to be in a month. Water truck on site, very little dust for size of site. Entrance and curbs are being installed off of Eisenman.
|
General Inspection | 3/27/2018 | 3/27/2018 | 3/27/2018 | P | PASS |
Michael Zawacki
|
|
|
Large site, 2 buildings up and work on 3rd pad. Inspect all together. Washout is clean and maintained, no trackout or other issues. Site is mostly below grade and no dirt is leaving site. Worker parking area is pit run and not muddy, only one way in or out. Lots of water currently on site, dust is not an issue. Machines in mud are not leaving site.
|
General Inspection | 2/21/2018 | 2/21/2018 | 2/21/2018 | P | PASS |
Michael Zawacki
|
|
|
Work on 2 tilt up buildings, 3rd will begin when weather breaks. Site is in good shape. Only request is to repair or replace rock in entrance, it is compacted and wont do much good when there is mud.
|
General Inspection | 1/4/2018 | 1/11/2018 | 1/11/2018 | P | PASS |
Michael Zawacki
|
|
|
Site is graded so all water stay on. No trackout at time of inspection. Washout and stable entrance on site. No loose trash. Only concern is some secondary containment for form oils. Talked to superintendent while on site.
|
General Inspection | 1/4/2018 | 1/4/2018 | 1/4/2018 | P | PART |
Andy J. Long
|
|
|
No trackout or discahrges from site. Perimeter silt fence installed at bottom of property. Trench work occurring through middle of site.
Sandy roadmix material has been laid on flat areas of site where building will be. Some of this material has been tracked out to Beechcraft Street. Will check for conditions as temperatures arrive.
|
General Inspection | 11/8/2017 | 11/8/2017 | 11/8/2017 | P | PASS |
Michael Zawacki
|
|
|
Grading and building up pads for future construction. Entrance in use and street free from track out. No dust observed. Fuel is stored in a containment. No drainage offsite, all water stays on.
|
General Inspection | 10/12/2017 | 10/12/2017 | 10/12/2017 | P | PASS |
Michael Zawacki
|
|
|
Syman handling erosion control. Perimeter controls installed. Contractor will be storing fuel on site, said they will have containment and keep spill kits in area. Graders have been taking care of dust, very clean site for size of exposed area. Exposed area may exceed 5 acres. Most stormwater will drain to low spots on site. Permit displayed at entrance, SWPPP book in job trailer. Road free from track out.
|