Information based on query as of Saturday, May 11, 2024.
Permit Information
Permit NumberESC17-01200
StatusFinaled
Name BRENT H CONGER
Site Address 6707 S EISENMAN RD
Project NameGowen Industrial Park
Customer Number 
ePlanReviewNo
Description
Rough grading permit and fee for total area of disturbance. GRD for drainage is not yet approved. SWPPP provided and approved. CGP eNOI IDR000N7. Initial site prep conducted under ESC16-00843. Special investigation fee for starting with out permits. Void ESC17-01013, no duplicate ESC permits. Update 11/20/2017. This permit modified to include construction of building A at the site.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final5/10/20195/10/20195/10/2019PPASS
DetailsMichael Zawacki
General Inspection5/10/20195/10/20195/10/2019 CANC
DetailsAndy J. Long
General Inspection4/25/20194/25/20194/25/2019 PASS
DetailsMichael Zawacki
Still some bare areas, no ESC issues.
General Inspection4/10/20194/10/20194/15/2019 PASS
DetailsMichael Zawacki
One empty lot on the northwest corner, no ground cover. Grass is starting to grow on terraced slopes. Area is landscaped. Dasco is working next to site.
General Inspection3/26/20193/26/20193/26/2019 CANC
DetailsAndy J. Long
General Inspection3/11/20193/11/20193/12/2019 CANC
DetailsAndy J. Long
General Inspection2/22/20192/22/20192/27/2019 PASS
DetailsMichael Zawacki
Work completed, mostly stabalized. No issues.
General Inspection2/7/20192/7/20192/7/2019 PASS
DetailsMichael Zawacki
Site is clean, most ground work completed.
General Inspection1/22/20191/22/20191/22/2019 CANC
DetailsAndy J. Long
General Inspection1/7/20191/7/20191/8/2019 PEND
DetailsAndy J. Long
Former RP has moved companies. Need to find new contact with Layton Construction.

No offsite discharges or trackout. 3 Buildings complete, some open areas still remain within business park.

There is some erosion on the bank at bottom of site near railroad tracks as well as some construction trash that needs to be picked up.
Site Final11/13/201811/14/201811/15/2018PNR
DetailsMichael Zawacki
General Inspection11/12/201811/12/201811/13/2018 CANC
DetailsAndy J. Long
General Inspection10/26/201810/26/201810/26/2018 PART
DetailsMichael Zawacki
Old silt fence by auto auction can be removed. Gravel bags and inlet protection can be removed from cul-de-sac. Some bare areas still in industrial area, will mpnitor for final stabalization.
General Inspection10/11/201810/11/201810/11/2018PPASS
DetailsAndy J. Long
All 3 buildings are constructed. Some areas of site need stabilization and to monitor areas that have been seeded. Site is paved and stormwater is retained on site. No corrections requested
Conference9/28/201810/1/201810/1/2018PCANC
DetailsAndy J. Long
data entry error
General Inspection9/28/20189/28/20189/28/2018 CANC
DetailsAndy J. Long
General Inspection9/6/20189/13/20189/13/2018APASS
DetailsMichael Zawacki
All lots paved and sidewalks complete. Landscapers are working on sod and final stabalization.
General Inspection9/6/20189/6/20189/6/2018 CANC
DetailsAndy J. Long
General Inspection8/22/20188/22/20188/22/2018 PASS
DetailsMichael Zawacki
All lots paved, curb, gutters, and sidewalks completed. Currently spreading topsoil back over site. Expected to hydroseed are in next few weeks.
General Inspection8/7/20188/7/20188/7/2018 PASS
DetailsMichael Zawacki
Site prep for paving. Graders and water truck leveling road base. Building exterior work completed, curb, gutter, and sidewalks installed.
General Inspection7/20/20187/20/20187/20/2018 PASS
DetailsMichael Zawacki
WIP on retention pond. 2 buildings completed, some of area paved. No dust or other ESC issues.
Random Inspection6/25/20186/25/20186/25/2018PPASS
DetailsAndy J. Long
Gowen Industrial park buildings and site improvements are in progress.

SWPPP and Boise ESC permit sign posted on Eisenman and Beechcraft. No trackout from site entrances, concrete washout facility located on site. MS4 stormdrains have sediment protection.

No corrections requested. See also ESC17-01043
General Inspection5/24/20185/24/20185/24/2018PPASS
DetailsMichael Zawacki
Entire site inspection. WIP on 3 tilt ups. Curbing is about half complete, site is free from dust and loose trash. Concrete washout is almost full. Some light trackout.
General Inspection5/10/20185/10/20185/10/2018PPASS
DetailsMichael Zawacki
Shells of two tilt ups complete and working on cores. WIP on construction of third tilt up. Site is prepped for curb, paving supposed to be in a month. Water truck on site, very little dust for size of site. Entrance and curbs are being installed off of Eisenman.
General Inspection3/27/20183/27/20183/27/2018PPASS
DetailsMichael Zawacki
Large site, 2 buildings up and work on 3rd pad. Inspect all together. Washout is clean and maintained, no trackout or other issues. Site is mostly below grade and no dirt is leaving site. Worker parking area is pit run and not muddy, only one way in or out. Lots of water currently on site, dust is not an issue. Machines in mud are not leaving site.
General Inspection2/21/20182/21/20182/21/2018PPASS
DetailsMichael Zawacki
Work on 2 tilt up buildings, 3rd will begin when weather breaks. Site is in good shape. Only request is to repair or replace rock in entrance, it is compacted and wont do much good when there is mud.
General Inspection1/4/20181/11/20181/11/2018PPASS
DetailsMichael Zawacki
Site is graded so all water stay on. No trackout at time of inspection. Washout and stable entrance on site. No loose trash. Only concern is some secondary containment for form oils. Talked to superintendent while on site.
General Inspection1/4/20181/4/20181/4/2018PPART
DetailsAndy J. Long
No trackout or discahrges from site. Perimeter silt fence installed at bottom of property. Trench work occurring through middle of site.

Sandy roadmix material has been laid on flat areas of site where building will be. Some of this material has been tracked out to Beechcraft Street. Will check for conditions as temperatures arrive.
General Inspection11/8/201711/8/201711/8/2017PPASS
DetailsMichael Zawacki
Grading and building up pads for future construction. Entrance in use and street free from track out. No dust observed. Fuel is stored in a containment. No drainage offsite, all water stays on.
General Inspection10/12/201710/12/201710/12/2017PPASS
DetailsMichael Zawacki
Syman handling erosion control. Perimeter controls installed. Contractor will be storing fuel on site, said they will have containment and keep spill kits in area. Graders have been taking care of dust, very clean site for size of exposed area. Exposed area may exceed 5 acres. Most stormwater will drain to low spots on site. Permit displayed at entrance, SWPPP book in job trailer. Road free from track out.