General Inspection | 6/7/2019 | 6/7/2019 | 6/7/2019 | | PASS |
Andy J. Long
|
|
|
Grading and infrastructure complete. Site now under coverage by Blackrock Home parkcenter BLVD townhome permits. Temp BMPs and final clean up to be covered by Blackrock, no further inspections on this permit.
|
DOC - Permit Finaled | 6/7/2019 | 6/7/2019 | 6/7/2019 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 5/23/2019 | 5/23/2019 | 5/23/2019 | | PART |
Michael Zawacki
|
|
|
Some mud and trash on Brookridge. Plywood being used to keep forklift from tearing up grass. Most of site clean, mess looks to be from drywaller not cleaning after unloading material.
|
General Inspection | 5/8/2019 | 5/8/2019 | 5/8/2019 | | PASS |
Michael Zawacki
|
|
|
All foundations poured, first wall has gone up. No issues.
|
General Inspection | 4/23/2019 | 4/23/2019 | 4/23/2019 | | PASS |
Michael Zawacki
|
|
|
All pads completed and alley clean. No work, all current work is west on the 4200 block of Parkcenter.
|
General Inspection | 4/5/2019 | 4/5/2019 | 4/8/2019 | | PASS |
Michael Zawacki
|
|
|
All pads and foundations poured. Alleyway is clean.
|
General Inspection | 3/21/2019 | 3/21/2019 | 3/25/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/6/2019 | 3/6/2019 | 3/6/2019 | | PART |
Michael Zawacki
|
|
|
Lots of dirt in alleyways. Few trash piles even though boxes have been provided.
|
General Inspection | 2/19/2019 | 2/19/2019 | 2/26/2019 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 2/4/2019 | 2/4/2019 | 2/7/2019 | | PART |
Michael Zawacki
|
|
|
Dirt on alleys to east where crew is on site installing forms. Some styrofoam has blown towards pasture.
|
General Inspection | 1/18/2019 | 1/18/2019 | 1/18/2019 | | PART |
Michael Zawacki
|
|
|
Concrete unlimited on site installing forms. Some trackout that needs to be swept.
|
General Inspection | 1/2/2019 | 1/2/2019 | 1/7/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/17/2018 | 12/17/2018 | 12/17/2018 | | PASS |
Michael Zawacki
|
|
|
No new activity. Site is clean and old washout was cleaned and rebuilt.
|
BMP Violation | 11/27/2018 | 11/29/2018 | 11/29/2018 | A | PASS |
Michael Zawacki
|
|
|
Alleys have been cleaned. Old washout cleaned and removed, new washout installed and clean. No activity at time of inspection.
|
General Inspection | 11/26/2018 | 11/26/2018 | 11/27/2018 | | FAIL |
Andy J. Long
|
|
|
Corrections issued to BlackRock for their DHETH phases along Parkcenter Blvd.
- pick up trash in pasture and storm drain swales south of all townhome phases recently completed or in progress. - install DI bag in alley in DHETH #7 east of Shadywood on north side of the blvd. - concrete washout is failed and needs removal. - new washout pit or above ground containment must be installed ASAP.
Corrections issued to Joey w/ Blackrock
|
General Inspection | 11/9/2018 | 11/9/2018 | 11/9/2018 | | FAIL |
Michael Zawacki
|
|
|
Trackout onto alleys and into street.
|
General Inspection | 10/25/2018 | 10/25/2018 | 10/26/2018 | | FAIL |
Michael Zawacki
|
|
|
All foundations poured. Two track steers on site moving backfill. Alley behind homes is dirt covered. Old washout has been removed and dumped over the edge behind homes. Lots of assorted lose trash on ground. Inlets are protected.
|
General Inspection | 10/8/2018 | 10/9/2018 | 10/10/2018 | A | PART |
Andy J. Long
|
|
|
Trash contained, lined washout provided. Blackrock Homes is now building homes in sub, Silt fence perimter installed.
correction to Black rock to make sure all storm drains in alleys have sediment protection and to have roads swept later this week.
|
General Inspection | 10/5/2018 | 10/5/2018 | 10/8/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/20/2018 | 9/20/2018 | 9/20/2018 | | FAIL |
Michael Zawacki
|
|
|
Section of southern perimeter silt fence has collapsed. Lots of windblown trash in weeds on south side. Washout needs to be emptied and repaired, lining has failed. Lots of tracking on rear concrete allry.
|
General Inspection | 9/5/2018 | 9/5/2018 | 9/10/2018 | | PASS |
Andy J. Long
|
|
|
BMPs installed. WIP on foundations. Concrete washout provided. No corrections requested.
|
General Inspection | 8/17/2018 | 8/17/2018 | 8/17/2018 | | PASS |
Andy J. Long
|
|
|
Phase 6 of DHETH is just now starting foundation work. Silt fence perimeter installed on south side of site. No corrections needed at this time.
|
General Inspection | 2/2/2018 | 2/2/2018 | 2/2/2018 | P | PASS |
Andy J. Long
|
|
|
Landscaping crews onsite doing irrigation lines. Silt fence perimeter installed. No SFHs started yet.
|
Tracking Control | 11/6/2017 | 11/6/2017 | 11/9/2017 | P | PEND |
Michael Zawacki
|
|
|
Can see where sweeper went. Didn't do a very good job.
|
Tracking Control | 11/6/2017 | 11/6/2017 | 11/6/2017 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/2/2017 | 11/2/2017 | 11/2/2017 | P | PASS |
Andy J. Long
|
|
|
WIP. Silt fence perimeter installed. No fugitive dust, discharges or dewatering occuring. Approved.
|
Stop Work Order | 10/13/2017 | 10/13/2017 | 10/13/2017 | P | DONE |
Andy J. Long
|
|
|
work started without permits, see MIS17-00348. Reinspection fee applied to project fees.
|