General Inspection | 8/3/2020 | 8/3/2020 | 8/3/2020 | | PASS |
Michael Zawacki
|
|
|
Landscapers working at last home, some dirt on road.
|
General Inspection | 6/16/2020 | 6/16/2020 | 6/17/2020 | P | PASS |
Michael Zawacki
|
|
|
WIP on last four homes, rest of development completed and landscaped. Area is clean, no issues.
|
General Inspection | 5/25/2020 | 5/25/2020 | 5/26/2020 | | PASS |
Michael Zawacki
|
|
|
Last four homes on ashgrove under constrction. All are framed, trash box on site, Sidewalk on Brenenman needs to be swept. Mostly sawdust, some dirt.
|
General Inspection | 4/9/2020 | 4/9/2020 | 4/9/2020 | P | PASS |
Michael Zawacki
|
|
|
WIP on last four homes in development. Two are framed, one foundation poured, 1 excavated.
|
General Inspection | 3/16/2020 | 3/16/2020 | 3/16/2020 | | PART |
Michael Zawacki
|
|
|
4 remaining parcels, 2 have homes starting to frame, 1 is poured, excavation on last. Some dirt on sidewalk.
|
General Inspection | 1/28/2020 | 1/28/2020 | 1/28/2020 | | PASS |
Michael Zawacki
|
|
|
Last phase hasn't started. Looks like someone has dumped two loads of dirty fill on empty lots. No esc issues.
|
General Inspection | 12/13/2019 | 12/13/2019 | 12/13/2019 | | PASS |
Michael Zawacki
|
|
|
All current construction finished. Still has vacant lots on west end.
|
General Inspection | 10/28/2019 | 10/28/2019 | 10/28/2019 | P | PEND |
Andy J. Long
|
|
|
No new activity. Dumped washout on 2451 Ashgrove could be from a site out side of subdivision...observed 10/7. No clean up has been conducted...investigation pending.
|
General Inspection | 10/7/2019 | 10/7/2019 | 10/7/2019 | P | FAIL |
Michael Zawacki
|
|
|
Washout has been dumped on vacant lots. All homes arte completed.
|
General Inspection | 9/13/2019 | 9/13/2019 | 9/13/2019 | | PASS |
Michael Zawacki
|
|
|
Lots closest to 36th haven't begun. 1 lot still needs to be landscaped, rest of houses completed.
|
General Inspection | 7/29/2019 | 7/29/2019 | 7/29/2019 | | PART |
Michael Zawacki
|
|
|
Washout dumped on vacant lots closest to 36th, no way to proof where it came from. Most homes now completed. Some mess from stucco crew. Trash boxes on sites, homes now have residents.
|
General Inspection | 6/10/2019 | 6/13/2019 | 6/13/2019 | A | PASS |
Michael Zawacki
|
|
|
Issues with one home, message sent to RP.
|
BMP Violation | 6/3/2019 | 6/7/2019 | 6/10/2019 | A | FAIL |
Michael Zawacki
|
|
|
Still lots of loose trash on lots. Some areas have dirt on road and sidewalks from mini excavators. ill schedule follow up.
|
General Inspection | 6/3/2019 | 6/3/2019 | 6/3/2019 | | FAIL |
Michael Zawacki
|
|
|
Site is a mess, lots of loose dirt on streets and sidewalks. RPs will be notified to clean area, reinspection scheduled.
|
General Inspection | 4/17/2019 | 4/17/2019 | 4/17/2019 | | FAIL |
Michael Zawacki
|
|
|
Roads are clean. Site is crowded, lots of small trash and building waste. Site is still muddy, needs some cleanup when dried.
|
General Inspection | 2/27/2019 | 2/27/2019 | 2/27/2019 | P | PASS |
Michael Zawacki
|
|
|
Streets and sidewalks show signs of being swept. Workers parked in road not mud. No tracking.
|
General Inspection | 1/10/2019 | 1/10/2019 | 1/10/2019 | P | FAIL |
Michael Zawacki
|
|
|
Washout is overflowing into dirt and street. Some light trackout.
|
General Inspection | 12/11/2018 | 12/11/2018 | 12/11/2018 | | PASS |
Michael Zawacki
|
|
|
Site snow covered, no new activity.
|
General Inspection | 9/11/2018 | 9/11/2018 | 9/11/2018 | P | PASS |
Michael Zawacki
|
|
|
Work has begun on roads inside of development. Parts of Breneman have been removed and will need to be repaved. Lots of dirt is on 32nd, sweeper should be there late today or in the morning.. Wood Bros on site doing walk through. Sewer rings on 32nd still not completed, blocked by candles.
|
Random Inspection | 8/6/2018 | 8/6/2018 | 8/6/2018 | P | PASS |
Michael Zawacki
|
|
|
Workers on site loading and hauling away old concrete. No new dirt activity.
|
General Inspection | 7/30/2018 | 7/30/2018 | 7/30/2018 | P | PASS |
Michael Zawacki
|
|
|
Curb in place along Breneman, sidewalk is prepped but not poured. A few feet of Breneman is torn up along lenght of curb. Site is still inactive and exposed. Some stockpiles on site, no dust at time of inspection. Some dirt on sidewalk.
|
General Inspection | 6/19/2018 | 6/19/2018 | 6/19/2018 | P | PASS |
Michael Zawacki
|
|
|
Site is idle. No dirt leaving site and no dust.
|
General Inspection | 5/16/2018 | 5/30/2018 | 5/31/2018 | P | PASS |
Michael Zawacki
|
|
|
Track utilities on site. No dirt leaving lot. 34th street is now paved and completed.
|
Site Preparation | 5/16/2018 | 5/16/2018 | 5/16/2018 | P | PASS |
Andy J. Long
|
|
|
No activity at time of inspection. Storm vault to the west of sub has installed. Streets within subdivision are not yet installed.
No trackout on surrounding streets. Permit sign and SWPPP posted. Site is below grade of surrounding streets with minimal runoff. No corrections requested.
|
General Inspection | 5/2/2018 | 5/2/2018 | 5/2/2018 | P | PASS |
Michael Zawacki
|
|
|
Currently prepping 34th street for paving. Some dirt on Breneman, areas have been saw cut and need to be patched. Site is rough graded and exposed, no new work has begun. Site will need to be monitored for dust and trackout.
|
General Inspection | 3/13/2018 | 3/13/2018 | 3/13/2018 | P | PASS |
Michael Zawacki
|
|
|
Disturbance is below level of road and contained. Wood Bros never hit water, test pit was about 10' to water and they needed to go to 8', no dewatering took place on site. No trackout or blowing dust, water truck on site.
|
General Inspection | 3/6/2018 | 3/8/2018 | 3/12/2018 | A | PEND |
Andy J. Long
|
|
|
check on status of dewatering plan
|
Site Preparation | 3/5/2018 | 3/6/2018 | 3/6/2018 | A | PASS |
Andy J. Long
|
|
|
8:30
Permit now issued and posted at site. Storm drains have sediment filter bags installed west of project on Breneman and 36th.
Construction installed; requested that it be increased in depth and scraped to remove compacted mud. Minor trackout at site.
Dewatering is anticipated, notified RP we need dewatering plan in place prior to operating.
Approved to resume construction, double fee paid for working without permit.
|