Site Final | 10/9/2019 | 10/10/2019 | 10/11/2019 | P | PASS |
Andy J. Long
|
|
|
Home is landscaped and stabilized. No temporary ESC BMPs left around site.
|
General Inspection | 10/9/2019 | 10/9/2019 | 10/9/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/17/2019 | 9/17/2019 | 9/17/2019 | P | PASS |
Andy J. Long
|
|
|
Driveway poured, site landscaped. HOme for sale. No corrections. Ready for site final next inspection
|
General Inspection | 9/10/2019 | 9/10/2019 | 9/10/2019 | | PASS |
Michael Zawacki
|
|
|
Crew on site installing sprinklers.
|
General Inspection | 8/23/2019 | 8/23/2019 | 8/23/2019 | | PASS |
Michael Zawacki
|
|
|
Crew has just finished prepping base for driveway. They are sweeping off road and sidewalk. Exterior looks completed, lot still has not stabalization.
|
General Inspection | 8/8/2019 | 8/8/2019 | 8/8/2019 | | PASS |
Michael Zawacki
|
|
|
Exterior work nearly done. Workers need to sweep apron when they leave.
|
General Inspection | 7/24/2019 | 7/24/2019 | 7/24/2019 | | PASS |
Michael Zawacki
|
|
|
Home still needs siding finished. Lot is bare with a pile of pitrun. Perimeter gator guards have been buried, some dirt on apron that needs sweeping, one person parking on lot.
|
General Inspection | 5/29/2019 | 5/29/2019 | 5/30/2019 | P | PASS |
Andy J. Long
|
|
|
Additional BMPs installed to reduce risk of sediment runoff. Additional gatorgaurd installed above the perimeter.
|
General Inspection | 5/21/2019 | 5/21/2019 | 5/23/2019 | P | PASS |
Andy J. Long
|
|
|
RP to install addition row of wattles midway up driveway and maintain the perimeter wattles by clearing captured sand and sediment.
|
General Inspection | 3/12/2019 | 3/12/2019 | 3/12/2019 | P | PART |
Michael Zawacki
|
|
|
Lots of dirt on road underneath where the workers are parking. Perimeter controls and washout on site. Workers doing framing, will need to watch for wind blown trash.
|
General Inspection | 2/8/2019 | 2/8/2019 | 2/8/2019 | P | PASS |
Michael Zawacki
|
|
|
Foundation poured, outpak used. Currently installing ADS for roof drains. Gatorguard used on entrance when off site. No ESC issues.
|
General Inspection | 1/18/2019 | 1/18/2019 | 1/18/2019 | P | PASS |
Michael Zawacki
|
|
|
Excavator on site. All BMPs still in place and in good condition, no dirt leaving site. Lots of backfill on site.
|
General Inspection | 1/9/2019 | 1/9/2019 | 1/9/2019 | P | PASS |
Michael Zawacki
|
|
|
Foundation walls poured, outpak washout on site. Perimeter BMPs still in place. Some large piles of backfill on site. No ESC issues.
|
Site Preparation | 12/10/2018 | 12/10/2018 | 12/10/2018 | P | PASS |
Andy J. Long
|
|
|
Please call 30 min prior if possible. Thank you. Phone #: ###-#### Inspection requested via web by Ken Litzinger
Permit sign posted. Perimeter wattle is properly installed. Road mix base installed for initial access and staging. Excavation in progress. Equipment parked on lot, no trackout. Crews have kept sidewalk and road shoulder clean.
|
Site Preparation | 12/6/2018 | 12/10/2018 | 12/10/2018 | A | CANC |
Andy J. Long
|
|
|
|
Site Preparation | 12/6/2018 | 12/6/2018 | 12/6/2018 | A | PASS |
Andy J. Long
|
|
|
Please call me 20min. Thanks Phone #: ###-#### Inspection requested via web by Ken Litzinger
RP-GC notified that some activity has started. Perimeter wattle is installed and may start excavating site access today or tomorrow. Request to post ESC permit sign that is visible from road.
Approved to activate site. Follow up site meeting scheduled for Monday 12/10.
|