Permit Information
Permit NumberFIR18-00610
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 1290 W MYRTLE ST
Project NamePioneer Crossing Office Bldg.
Customer Number 
ePlanReviewYes
Description
[Pioneer Crossing Office Building]
The fire sprinkler scope of work consists of shell protection for a five story office building. There are two manual standpipes a 6” and 4”. One of the standpipes also has floor control valves. The system is supplied by 6” underground through a 6” header.

• The underground piping is under permit FIR18-00540
• The superstructure is under permit BLD18-01166

[BLD18-01246]
Permit for the buildout of the core and shell with work to include, restrooms, elevators, entry lobby, electrical, mechanical and fire sprinkler systems per the approved plans. This is a fully sprinklered and alarmed building for area and height increase. The building is type IIB over a type 1A podium per the special provisions of section 510.2/2015 IBC. This permit does not include utilities, foundation or superstructure. This building is fully fire sprinklered for height and area increase Please reference permit BLD18-01166. CDM

Alternative Materials and Methods:
This project includes approved code alternates to the following fire protection systems and/or building life safety systems. Please review the supplemental documents attached to this building permit case for details. Fire protection “shop drawings” shall include approved code alternate design.

• There are no AMM at this time.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/4/20196/4/20196/4/2019APASS
DetailsJim Page
Final fire sprinkler inspection complete.

Corcinate final with Mike Oswald Phone #: ###-#### Inspection requested via web by Christophe Wilson
INSP-Sprinkler Rough-in5/13/20195/13/20195/13/2019PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping in common corridors and elevator lobby on levels 3 and 4 complete, approved for cover.

Mike Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro4/30/20195/1/20195/1/2019APASS
DetailsTroy Cobbley
The overhead hydro tests on all systems have been witnessed with no loss at the guage. Mike Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro4/24/20194/24/20194/24/2019PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping above suspended ceilings in elevator lobbies on levels 1 and 2 complete, levels 1 and 2 elevator lobbies approved for cover.

Mike Phone #: ###-####
INSP-Sprinkler Rough-in3/5/20193/6/20193/6/2019APART
DetailsJim Page
Rough to cover inspection for level 5 restrooms and elevator lobby complete, approved for cover.

Mike-5th floor Phone #: ###-####
INSP-Sprinkler Rough-in2/26/20192/27/20192/27/2019APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping on level 1 stairwell landings complete, approved for cover.

Cover inpection for first floor stairways only Cordinate with Mike Oswald ###-#### Phone #: ###-#### Inspection requested via web by Christophe Wilson
INSP-Sprinkler Rough-in2/18/20192/19/20192/19/2019APART
DetailsJim Page
Overehad fire sprinkler piping in elevator lobby hardlids for levels 2, 3 and 4 complete, approved for cover. Sprinkler piping providing water to elevator shaft sprinkler heads on level 5 complete as well. Please Cordinate Inspection with Mike Oswald Phone #: ###-#### Inspection requested via web by Christophe Wilson
INSP-Sprinkler Rough-in2/4/20192/4/20192/4/2019PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping located above the hardlids in restrooms on level 3 complete, level 3 restrooms approved for cover.

Rough to cover third floor Phone #: ###-#### Inspection requested via web by Christophe Wilson
INSP-Sprinkler Rough-in1/29/20191/29/20191/29/2019PPART
DetailsJim Page
Overhead fire sprinkler piping located above hardlids in level 2 restrooms and level 1 entry hardlids complete, areas inspected approved for cover.

Second floor restrooms rough to cover // Mike Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro1/14/20191/14/20191/14/2019PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping located above hardlids on level 1 complete, level 1 hardlids approved for cover.

Mike Phone #: ###-####
INSP-Conference12/5/201812/5/201812/5/2018ADONE
DetailsJim Page
Access and exit to riser room is acceptable as long as the largest piece of equipment in the room can be removed without obstruction.
INSP-Sprinkler Rough-in12/4/201812/5/201812/5/2018ACANC
DetailsJim Page
Mike Phone #: ###-####
INSP-Conference10/26/201810/26/201810/26/2018PDONE
DetailsJim Page
Temporary FDC is installed on the southside of building.

Temp FDC is Installed Phone #: ###-#### Inspection requested via web by Christophe Wilson
INSP-Conference10/1/201810/1/201810/1/2018PDONE
DetailsJim Page
Fire conference complete, soil was re-sampled and designated as Class B soil, sway bracing is not required with Class B soil. Contractor will submit plan mod for sway bracing being deleted.

MIke Phone #: ###-####
INSP-Sprinkler Rough-in9/4/20189/4/20189/4/2018PPART
DetailsJim Page
Inspection for beam clamps/retaining straps and eartquake sway bracing attachments inspected on level 1 before fire proofing complete, all installed correctly, points of attachment approved for cover, overhead fire sprinkler piping to be inspected at a later date.

MIke Phone #: ###-####