Permit Information
Permit NumberBLD17-02261
StatusFinaled
Name ESI
Site Address 2419 W FAIRVIEW AVE
Project NameAdare Manor Apartments
Customer Number17-02262
ePlanReviewYes
Description
(ADARE MANOR APARTMENTS) ""PLAN MODIFICATION FOR ADJUSTMENTS TO OFF-SITE SEWER DESIGN 10/5/18.""Building A: There are two building permits under this Eplan case. 118 units of a 134-Unit multi-family housing and accessory retail project.
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  10/23/2019 DONE
BLD-Final10/22/201910/22/201910/22/2019PPASS
DetailsDave Hannah
Tony Phone #: ###-####
FIRE-Final Inspection10/22/201910/22/201910/22/2019PPASS
DetailsTroy Cobbley
Life safety passed.


Tony Phone #: ###-####
BLD-Final10/16/201910/17/201910/17/2019PCANC
DetailsBrandon Shaw
Tony Phone #: ###-####
FIRE-Final Inspection10/16/201910/17/201910/17/2019AFAIL
DetailsTroy Cobbley
Replace the ceiling that has been removed for the installation of the security grill. All other corrections have been addressed.

Tony Phone #: ###-####
FIRE-Conference10/1/201910/1/201910/1/2019PDONE
DetailsJim Page
Fire conference/discussion for remaining fire life safet items complete.

Tony Phone #: ###-####
BLD-Final9/27/20199/30/20199/30/2019APART
DetailsDave Hannah
Asked for Michael is Dave is out today // Tony Phone #: ###-#### ok for tco for whole building
Temporary Occupancy9/30/201912/29/20199/30/2019 DONE
DetailsCandy A. Nichols
per jim Page-ok for a 45 day temp for whole building-Dave Hannah as well from 9-18-19
BLD-Final9/27/20199/27/20199/27/2019PNR
DetailsTony Young
Tony Phone #: 28-###-####
BLD-Conference9/27/20199/27/20199/27/2019PNR
DetailsTony Young
if dave is not working please call to let know/reschedule // Tony Phone #: ###-####
FIRE-Final Inspection9/26/20199/27/20199/27/2019ACANC
DetailsJim Page
David Phone #: ###-#### cancel per david, wrong permit
BLD-Conference9/25/20199/25/20199/26/2019PDEFR
DetailsTony Young
handrail // Tony Phone #: ###-####,, wanted Dave
PubWorks Occupancy Approval9/23/20199/23/20199/23/2019 DONE
DetailsTiffany Lowery
Bonding in place for additional PW requirements
BLD-Final9/19/20199/20/20199/20/2019APART
DetailsMike Jordan
Tony Phone #: ###-####. Ok for temp occ. only. Verified egress system for buildings A and B. Only rooms ok for occ. are 104,107,119,120,125,138,209,210,212,217,331,337,402,405,425,427,429,432,433,440.
Temporary Occupancy9/20/201912/19/20199/20/2019 DONE
DetailsTiffany Carson-Herker
FIRE-Final Inspection9/17/20199/18/20199/18/2019APART
DetailsJim Page
Partial final inspection for life fire safety complete, fire sprinkler inspection is complete, fire alarm system drawings need to be updated and resubmitted before final sign off due to the number of changes required to make it code compliant, fire extinguishers have been placed with current inspection tags. Remaining items to inspect for final sign off are:

1. Install permanent signage on stairwells/fire sprinkler riser room and FACP.

2. Provide inspection report for elevator inspection recall and shunt.

3. Update fire alarm drawings an resubmit for approval.

4. Change thumbturn deadbolts on sliding glass doors, level 2, to single action door hardware.


5. Provide a barrier for fall protection on roof top access ladder, stair 3.
6. Provide opening or gates in metal surround by HVAC units on roof for fireman access as discussed.
7. Hose valves on levels 1 through 4 project into the path of egress more than 4 inches, per IFC 1003.3.3, if a horizontal projection sticks out into the path of egress more than 4 inches then gaurds have to be provided if the projection doesn't impede the minimum width for the path of egress. If valves do in fact project into the path of egress, then hose valves will be required to be installed in a recessed cabinet.

45 day TCO authorized per conversation with Ron Johnson with Boise Fire Department.




David Phone #: ###-####
FIRE-Final Inspection9/17/20199/18/20199/18/2019PCANC
DetailsJim Page
Duplicate inspection request, this request is cancelled.

Curtis Phone #: ###-####
Zoning Approval9/18/20199/18/20199/18/2019 PASS
DetailsKatelyn Menuge
Seeding swale on 9/20.
FIRE-Final Inspection9/17/20199/17/20199/17/2019PCANC
DetailsTroy Cobbley
Duplicate inspection.

David Phone #: ###-####
FIRE-Final Inspection9/16/20199/17/20199/17/2019AFAIL
DetailsTroy Cobbley
See the Fire Life Safety Plan Review Comments for items marked in red that need addressed which include finishing the fire alarm permit (added notification devices/elevator testing), fire dept access signage, additional fire extinguishers in common areas such as Laundry Rooms/Mail Rooms/Mechanical Rooms, Single action hardware for the common use rooms with sliding doors, verification that the Riser Room is one hour.....ect.

Curtis Phone #: ###-####
FIRE-Final Inspection9/16/20199/16/20199/17/2019PFAIL
DetailsTroy Cobbley
See the Fire Life Safety Plan Review Comments for items marked in red that need addressed which include finishing the fire alarm permit (added notification devices/elevator testing), fire dept access signage, additional fire extinguishers in common areas such as Laundry Rooms/Mail Rooms/Mechanical Rooms, Single action hardware for the common use rooms with sliding doors, verification that the Riser Room is one hour.....ect.

Curtis Phone #: ###-####
BLD-Conference9/11/20199/11/20199/11/2019PDONE
DetailsDave Hannah
Tony Phone #: ###-####
FIRE-Final Inspection8/29/20198/30/20198/30/2019AFAIL
DetailsJim Page
Project not ready for life fire safety inspection, no items inspected.

Tony Phone #: ###-####
BLD-Final8/29/20198/30/20198/30/2019PCANC
DetailsTony Young
Tony Phone #: ###-####
BLD-Conference8/29/20198/29/20198/29/2019PNR
DetailsDave Hannah
Tony Phone #: ###-####
FIRE-Conference8/27/20198/27/20198/27/2019PDONE
DetailsJim Page
Fire conference complete, discussed options for roof top access ladder arrangement.

Per Dave H Phone #: ###-####
BLD-Conference8/26/20198/27/20198/27/2019ACANC
DetailsDave Hannah
Tony Phone #: ###-####
BLD-Conference8/22/20198/23/20198/23/2019APEND
DetailsDave Hannah
Tony Phone #: ###-#### rooftop access
FIRE-Conference8/13/20198/13/20198/13/2019ADONE
DetailsJim Page
Fire conference is complete, note number 11 on building permit fire review comments mentions no parking signage being installed on the west side of 25th, west side of 25th is under a seperate permit with a different general contractor, this permit was issued after the review was completed for this project, follow up for signage will be done on the St. Lukes project which is on the west side of 25th, signage will not be required for this life fire safety inspection.
BLD-Conference8/12/20198/12/20198/12/2019PDONE
DetailsDave Hannah
Tony Phone #: ###-####
FIRE-Conference8/12/20198/12/20198/12/2019PDONE
DetailsJim Page
Fire conference complete, discussed required life safety items that will need to be completed, discussed required items for possible TCO.

fire life safety // Curtis Phone #: ###-####
BLD-Energy code compliance8/9/20198/9/20198/9/2019PPASS
DetailsDave Hannah
Insulate breeze way Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Energy code compliance8/8/20198/8/20198/8/2019PNR
DetailsDave Hannah
Breeze way insulation Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Wall cover8/6/20198/7/20198/7/2019APASS
DetailsDave Hannah
Trash room and stair # 3 Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Wall cover8/7/20198/7/20198/7/2019PPASS
DetailsDave Hannah
Trash rooms 2,3 and 4 Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Wall cover8/6/20198/6/20198/7/2019PPASS
DetailsDave Hannah
Looking to cover walls Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Wall cover8/1/20198/1/20198/1/2019PPASS
DetailsBrandon Shaw
3rd Floor Common area ceiling for cover....
BLD-Framing/Rough-in7/31/20197/31/20197/31/2019PPART
DetailsDave Hannah
Second and Third Floor Common areas ceiling inspection for cover. Phone #: ###-#### Inspection requested via web by JT Turner second floor ok
BLD-Framing/Rough-in7/26/20197/29/20197/29/2019APART
DetailsDave Hannah
Elevator shaft wall framing for cover, Laundry room shafts. Second Floor common area ceilings for cover. Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Wall cover7/18/20197/18/20197/18/2019PPASS
DetailsDave Hannah
4th Floor Area A, B and C Corridor Ceiling inspection for cover. Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Framing/Rough-in7/16/20197/16/20197/16/2019PPASS
DetailsDave Hannah
Floors 2 and 3 area B corridor ceiling inspections for cover. Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Wall cover7/15/20197/16/20197/16/2019PPASS
DetailsDave Hannah
Area C 2nd and 3rd Floor Corridor ceilings. First floor trash room and Room 106 Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Wall cover7/15/20197/16/20197/16/2019APASS
DetailsDave Hannah
Area C 2nd and 3rd Floor Corridor ceilings. First floor trash room and Room 106 Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Wall cover7/9/20197/9/20197/10/2019PPART
DetailsDave Hannah
Shaft inspections. Multiple locations. Fire box inspections. Periodic inspection of Low volt boxes at 1 hr walls. Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Wall cover7/2/20197/2/20197/2/2019PNR
DetailsDave Hannah
1st Floor area A Drop ceiling cover inspection. Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Wall cover6/27/20196/28/20196/28/2019APASS
DetailsMike Jordan
2nd and 3rd Floor Corridor ceiling inspections for cover. Sections A and D to end of corridors. Phone #: ###-#### Inspection requested via web by JT Turner. 2nd. and 3rd floor north and south corridor lids in Areas A and D ok for cover.
BLD-Wall cover6/25/20196/26/20196/26/2019ANR
DetailsMike Jordan
Third Floor corridor ceiling inspection for cover. Area A and D. South to North Hallways. Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Wall cover6/17/20196/18/20196/18/2019APART
DetailsDave Hannah
Laundry rooms for drywall cover. Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Framing/Rough-in6/13/20196/14/20196/14/2019PPASS
DetailsDave Hannah
4 floors of Laundry room for insulation. 2nd floor A-B drops for cover. Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Framing/Rough-in6/10/20196/10/20196/10/2019PPASS
DetailsDave Hannah
Trash room inspections Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Wall cover6/6/20196/6/20196/10/2019PPASS
DetailsDave Hannah
3rd Floor area A drops cover inspection. Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Framing/Rough-in6/5/20196/5/20196/6/2019PPART
DetailsDave Hannah
First Floor Trash Chute Rooms inspections so that we can insulate. Phone #: ###-#### Inspection requested via web by JT Turner ok to insulate east trash shut room
BLD-Wall cover6/3/20196/4/20196/4/2019APART
DetailsDave Hannah
3rd Floor area A and B drops in units for drywall cover. 2nd Floor corridor insulation and airseal areas A-B. Phone #: ###-#### Inspection requested via web by JT Turner area b ok and 2nd fl ok
BLD-Wall cover5/22/20195/23/20195/23/2019APART
DetailsDave Hannah
Corridor Air seal. Cover inspections for Mechanical room and elevator equipment room. Phone #: ###-#### Inspection requested via web by JT Turner ok to insulate v3fl area a b corridor and ok to cover elev equip room
BLD-Wall cover5/17/20195/20/20195/21/2019APASS
DetailsDave Hannah
Elevator equipment room for cover and shaft liner on first floor of area B. Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Wall cover5/15/20195/16/20195/16/2019PPASS
DetailsDave Hannah
Mechanical Room cover inspection area B. First Floor area C Drop ceiling in units for cover. Air Seal 4th FLoor corridor and common areas. Elevator equipment room. Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Wall cover5/13/20195/14/20195/15/2019PPASS
DetailsDave Hannah
First Floor of Area A. Insulation inspection for cover. Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Wall cover5/6/20195/7/20195/7/2019PPASS
DetailsMike Jordan
3rd and 4th Floor Drop inspection for cover. Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Framing/Rough-in5/3/20195/3/20195/3/2019PPASS
DetailsDave Hannah
BLD-Framing/Rough-in5/2/20195/3/20195/3/2019APEND
DetailsDave Hannah
First floor A units inspection for insulation. First Floor corridor A for fire caulk for secondary lid. Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Wall cover4/30/20195/1/20195/1/2019PPASS
DetailsDave Hannah
3rd and 4th floor of Area B insulation inspection for cover. Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Framing/Rough-in4/29/20194/30/20194/30/2019PPASS
DetailsDave Hannah
Area A 3rd and 4th Floor framing inspection for insulation install. Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Framing/Rough-in4/23/20194/24/20194/24/2019PPASS
DetailsDave Hannah
Area B Floors 3 and 4 framing inspection for insulation install. Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Framing/Rough-in4/16/20194/16/20194/16/2019PPASS
DetailsDave Hannah
Corridors 2 and 3 in Area C inspect pre-insulation. Floor 3 of Area D chase inspection for cover. Stair 4 framing add for insulation Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Wall cover4/11/20194/12/20194/12/2019APASS
DetailsDave Hannah
4th Floor Area C insulation inspection for drywall cover in units. Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Wall cover3/7/20193/8/20193/11/2019PPASS
DetailsDave Hannah
First floor Corridor ceiling inspection for area C. From the elevator wall to the Breezeway. This is for ceiling pre-rock. Phone #: ###-#### Inspection requested via web by JT Turner
FIRE-Conference2/18/20192/19/20192/19/2019PDONE
DetailsJim Page
Fire conference comlete.

Adare Manor Fire inspector Consult. Extinguisher locations, draft stopping, Knox box, etc. Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Framing/Rough-in2/18/20192/19/20192/19/2019PPART
DetailsDave Hannah
Balcony framing on north face of building for siding/soffit cover Phone #: ###-#### Inspection requested via web by JT Turner all but the south end second fl and the north end 4th floor ok to insulate
BLD-Framing/Rough-in2/12/20192/12/20192/12/2019PNR
DetailsDave Hannah
Shear inspection remaining corridors floors 1-4. Phone #: ###-#### Inspection requested via web by JT Turner
BLD-Framing/Rough-in2/6/20192/6/20192/7/2019PPART
DetailsDave Hannah
Floors 2 and 3 corridor fire caulking inspection so that we can begin insulation and drywall. Area D. Phone #: ###-#### Inspection requested via web by JT Turner ok to insulate and pre rpck corradoers 2nd and 3rd floors bldg d
BLD-Wall Bracing1/29/20191/30/20191/30/2019PPASS
DetailsDave Hannah
Tony Phone #: ###-####
BLD-Energy code compliance1/22/20191/22/20191/22/2019PPART
DetailsDave Hannah
Tony Phone #: ###-#### elec rooms
BLD-Energy code compliance1/17/20191/18/20191/18/2019APART
DetailsDave Hannah
Tony Phone #: ###-#### shafts north bldg ok to cover three sides
BLD-Conference1/16/20191/17/20191/17/2019PDONE
DetailsDave Hannah
Tony- please call 1st Phone #: ###-####
BLD-Other12/26/201812/27/201812/27/2018PPASS
DetailsDave Hannah
Roof nailing inspection. Phone #: ###-#### Inspection requested via web by Corey Hockersmith ok to cover roof
BLD-Other12/20/201812/26/201812/27/2018PPASS
DetailsDave Hannah
Roof nailing inspection at northeast corner. Shear nailing inspection on north and south walls of area B and C. Phone #: ###-#### Inspection requested via web by Corey Hockersmith ext shear ok
BLD-Wall Bracing12/18/201812/20/201812/20/2018PPASS
DetailsDave Hannah
Exterior shear and strapping north and south side of north wing (our B and C buildings). Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Other12/17/201812/18/201812/18/2018APASS
DetailsDave Hannah
roof shear // tony Phone #: ###-####
BLD-Wall Bracing11/20/201811/21/201811/21/2018PPASS
DetailsJim Storey
shear // Tony Phone #: ###-#### 3rd exterior a and e ok
BLD-Wall Bracing11/6/201811/7/201811/7/2018APART
DetailsJim Sly
interior // Tony Phone #: ###-####
Inspection of retro fit hold downs area A B and C. All OK except 3 in area C (marked in orange). and.........4 in front wall of elevator shaft. MTI special inspections.
BLD-Wall Bracing11/6/201811/6/201811/7/2018PPART
DetailsDave Hannah
shear // Tony Phone #: ###-#### ext 2nd and third floors blg b and c
FIRE-Conference10/25/201810/26/201810/26/2018ACANC
DetailsJim Page
Phone number provided is not in service, conference will need to be rescheduled with correct point of contact information, this conference request is cancelled.

Mike Phone #: ###-####
BLD-Energy code compliance10/25/201810/26/201810/26/2018PNR
DetailsDave Hannah
1st and 2nd floor section BC // Mike Phone #: ###-####
CHANGE STATUS TO (ISS)  10/17/2018 DONE
Print Occupancy Form  10/17/2018 DONE
OVERRIDE  10/12/2018  
Plan assigned to (CDM)10/3/201810/3/201810/12/2018 PASS
DetailsCarl D Madsen
Plan Mod #4 - adjustments to off-site sewer design, to avoid existing utilities in 23rd st
Permit Ready to Issue  10/12/2018 DONE
Plan Mod Approved
Do Not ReIssue (plan mod fee due)
BLD-Wall Bracing10/11/201810/12/201810/11/2018APART
DetailsJim Sly
mike Phone #: ###-####
Wing A.....Exterior and interior shear nailing ........strapping ...1st and 2nd floor.
BLD-Wall Bracing10/8/201810/10/201810/11/2018PNR
DetailsDave Hannah
Mike-exterior strap & shear Phone #: ###-####
Routing PW Sewer Design10/9/2018 10/10/2018 PASS
DetailsDeAnn Brown
Routing PW Sewer Design10/10/2018 10/10/2018 PASS
DetailsDeAnn Brown
BLD-Wall Bracing10/8/201810/9/201810/9/2018APASS
DetailsDave Hannah
Mike-plywood shear interior Phone #: ###-####
Routing PW Drainage10/9/2018 10/9/2018 PASS
DetailsBrian Murphy
BLD-Wall Bracing10/3/201810/4/201810/4/2018PCANC
DetailsBrandon Shaw
NW restaurant walls // Mike Parker Phone #: ###-####
Plan Modification Accepted  10/3/2018 DONE
Plan Mod #4 - adjustments to off-site sewer design, to avoid existing utilities in 23rd st
CHANGE STATUS TO (ISS)  10/2/2018 DONE
OVERRIDE  9/14/2018  
Plan assigned to (CDM)9/11/20189/11/20189/14/2018 PASS
DetailsCarl D Madsen
plan mod for sewer design
Permit Ready to Issue  9/14/2018 DONE
PLAN MOD APPROVED
Do Not ReIssue permit (plan mod fees due)
Routing - PUBLIC WORKS9/11/2018 9/12/2018 PASS
DetailsMorgan Webb
Routing PW Sewer Design9/12/2018 9/12/2018 PASS
DetailsDeAnn Brown
BLD-Conference9/10/20189/11/20189/11/2018ADONE
DetailsDave Hannah
2hr walls/plumbing - Tony Phone #: ###-####
BLD-Wall Bracing9/10/20189/11/20189/11/2018ANR
DetailsDave Hannah
shear wall, late morning - Tony Phone #: ###-####
Plan Modification Accepted  9/11/2018 DONE
Plan modification workflow started for adjustments to off-site sewer design, to avoid existing utilites in road.
Routing - PLAN CHECK9/11/2018 9/11/2018 PASS
DetailsCarl D Madsen
BLD-Wall Bracing8/29/20188/30/20188/30/2018APART
DetailsDave Hannah
1st fl - Tony Phone #: ###-#### see plans for areas inspected for shear ok to pre rx
CHANGE STATUS TO (ISS)  8/14/2018 DONE
Print Occupancy Form  8/14/2018 DONE
OVERRIDE  8/3/2018  
BLD-Conference8/3/20188/3/20188/3/2018PDONE
DetailsDave Hannah
Tony-or Mike ###-#### Phone #: ###-####
Plan assigned to (CDM)6/14/20186/14/20188/3/2018 PASS
DetailsCarl D Madsen
Plan Mod #2 - A) Eliminate exterior gypsum sheathing at exterior wall assemblies, based on IBC section 705.5 which
allows walls to be rated only for exposure from the inside.
B) Eliminate exterior gypsum sheathing at underside of projecting balconies, based on IBC section
1406.3, exception 3, which allows sprinkler-protected balconies to not be of fire-rated construction.
C) Eliminate automatic roll-down smoke curtains at elevators, based on recent code interpretation per
Carl Madsen.
Permit Ready to Issue  8/3/2018 DONE
PLAN MOD
Routing - PLAN CHECK7/26/2018 8/3/2018 PASS
DetailsCarl D Madsen
Routing PW Sewer Design7/31/2018 7/31/2018 PASS
DetailsDeAnn Brown
Routing PW Drainage7/27/2018 7/27/2018 PASS
DetailsBrian Murphy
Routing - PLAN CHECK7/14/2018 7/14/2018 FAIL
DetailsCarl D Madsen
Routing PW Sewer Design6/27/2018 7/3/2018 FAIL
DetailsDeAnn Brown
Sewer revisions required. Please contact Mike Sheppard at ###-#### to discuss.
Routing PW Drainage6/27/2018 7/2/2018 PASS
DetailsBrian Murphy
Plan Modification Accepted  6/14/2018 DONE
DetailsChristina Prado
Plan Mod 2 - A) Eliminate exterior gypsum sheathing at exterior wall assemblies, based on IBC section 705.5 which
allows walls to be rated only for exposure from the inside.
B) Eliminate exterior gypsum sheathing at underside of projecting balconies, based on IBC section
1406.3, exception 3, which allows sprinkler-protected balconies to not be of fire-rated construction.
C) Eliminate automatic roll-down smoke curtains at elevators, based on recent code interpretation per
Carl Madsen.
D) Adjustments to off-site sewer services.
OVERRIDE  6/13/2018  
Plan assigned to (CDM)5/30/20185/30/20186/13/2018 PASS
DetailsCarl D Madsen
Plan Mod #1 - Revise streetscape design along 24th and 25th streets, eliminate silva cells, change drainage from
underground seepage beds to infiltration swale, reduce parking count.
Already approved by DR Mod DRH18-00186.
Routing - PLAN CHECK5/31/2018 6/13/2018 PASS
DetailsCarl D Madsen
per Carl M-no plan mod fee
Print Occupancy Form  6/13/2018 DONE
CHANGE STATUS TO (ISS)  6/13/2018 DONE
Print Occupancy Form  6/13/2018 DONE
Permit Ready to Issue  6/13/2018 DONE
please do not re issued-
as per Carl M he has no plan mod fee
Routing PW Drainage5/31/2018 6/4/2018 PASS
DetailsBrian Murphy
Routing - Design Review5/31/2018 6/4/2018 PASS
DetailsSarah Schafer
Routing - PUBLIC WORKS5/31/2018 5/31/2018 PASS
DetailsMorgan Webb
Plan Modification Accepted  5/30/2018 DONE
DetailsChristina Prado
Plan Mod #1 - Revise streetscape design along 24th and 25th streets, eliminate silva cells, change drainage from
underground seepage beds to infiltration swale, reduce parking count.
Already approved by DR Mod DRH18-00186.
Issue PAID IN FULL permit  4/19/2018 DONE
Inspection Record Card- Bld  4/19/2018 DONE
Print Occupancy Form  4/19/2018 DONE
Telephone call  4/13/2018 DONE
Left a message for Heidi recommending to send in two request for 180 day extensions since this permit is now 100 days past the expiration date. stated that is shows the review took a bit longer and that we are still waiting for info from achd and payment of fees
Telephone call  4/6/2018 DONE
Left a message for Heidi recommending to send in a request for an extension since the review went a bit longer and still waiting for ACHD info
OVERRIDE  3/23/2018  
Plan assigned to (CDM)7/12/20177/12/20173/23/2018 PASS
DetailsCarl D Madsen
1st Comp Adare Manor
PLANS/APPL TAKEN TO FRONT DESK  3/23/2018 DONE
Permit Ready to Issue  3/23/2018 DONE
Need ACHD
Routing - PLAN CHECK2/24/2018 3/21/2018 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK1/17/2018 3/21/2018 PASS
DetailsCarl D Madsen
Routing - PLANNING Land Div2/28/2018 3/20/2018 PASS
DetailsTodd Tucker
Routing - Design Review3/20/2018 3/20/2018 PASS
DetailsSarah Schafer
Routing PW Drainage2/28/2018 2/28/2018 PASS
DetailsBrian Murphy
Routing - PUBLIC WORKS2/24/2018 2/26/2018 PASS
DetailsRachael Beierle
Routing - Design Review2/24/2018 2/26/2018 FAIL
DetailsSarah Schafer
Record of Survey required. Perpetual public access agreement, cross access and off-site parking agreement required.
Routing Off Site - STRUCTURAL1/17/2018 2/24/2018 PASS
DetailsCarl D Madsen
Routing PW Sewer Design1/17/2018 2/21/2018 PASS
DetailsMike Sheppard
Route to Impact Fee Review1/17/20181/22/20182/7/2018 PASS
DetailsEric Bilimoria
Routing PW Street Lights2/5/2018 2/5/2018 PASS
DetailsTom Marshall
Routing PW Environmental1/17/2018 1/29/2018 PASS
DetailsRick Christenson
Routing - MECHANICAL1/17/2018 1/22/2018 PASS
DetailsTroy James
Routing - PLUMBING1/17/2018 1/22/2018 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing PW Street Lights1/17/2018 1/18/2018 FAIL
DetailsTom Marshall
Plenty of change marks.
Routing - Addressing1/17/2018 1/18/2018 PASS
DetailsDoug Chausow
Routing - Erosion and Sediment1/17/2018 1/18/2018 PASS
DetailsMichael Zawacki
Routing - FIRE1/17/20181/17/20181/17/2018 PASS
DetailsScott Arellano
No changes from previous approval.
Routing - PUBLIC WORKS1/17/2018 1/17/2018 PASS
DetailsRachael Beierle
Routing - Design Review1/17/2018 1/17/2018 FAIL
DetailsSarah Schafer
Parking agreement and cross access agreements still need to be signed and recorded.
Routing PW Solid Waste1/17/2018 1/17/2018 PASS
DetailsEvan Carpenter
Routing - PLANNING1/17/2018 1/17/2018 PASS
DetailsCody Riddle
Design approved by DR.
Route to Impact Fee Review9/1/20179/4/201710/19/2017 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing PW Sewer Design9/14/2017 9/28/2017 PASS
DetailsKyle S. Rosenmeyer
Approved Sewer Extension drawings included in permit.
Routing - FIRE9/13/20179/13/20179/20/2017 PASS
DetailsScott Arellano
Attached updated plan review report to case.
Routing - PLAN CHECK9/13/2017 9/20/2017 FAIL
DetailsCarl D Madsen
Routing - PLANNING Land Div9/13/2017 9/20/2017 FAIL
DetailsTodd Tucker
Routing Off Site - STRUCTURAL9/13/2017 9/20/2017 PASS
DetailsCarl D Madsen
Routing PW Sewer Rating9/19/2017 9/19/2017 PASS
DetailsMorgan Webb
Routing - Design Review9/19/2017 9/19/2017 FAIL
DetailsSarah Schafer
Parking easement required for the off-site parking. Perpetual easement for the access drive south of the buidling required. Both must be reviewed and approved by Boise City Legal prior to being recorded.
Routing PW Street Lights9/14/2017 9/18/2017 PASS
DetailsTom Marshall
Routing PW Solid Waste9/14/2017 9/15/2017 PASS
DetailsEvan Carpenter
Routing PW Environmental9/14/2017 9/15/2017 PASS
DetailsRick Christenson
Per 1500 Gallon Exterior Grease Interceptor shown
Routing - Addressing9/15/2017 9/15/2017 PASS
DetailsDoug Chausow
NOTE: Parcel number will need to be updated, once ROS17-00045 is finalized
Routing PW Drainage9/14/2017 9/14/2017 PASS
DetailsBrian Murphy
Routing - PLUMBING9/13/2017 9/14/2017 PASS
DetailsBill VanDegrift
maximun water pressure to the potable water system is 80PSI
Routing - MECHANICAL9/13/2017 9/14/2017 PASS
DetailsTroy James
Routing - PLAN CHECK7/12/2017 9/1/2017 FAIL
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL7/12/2017 9/1/2017 FAIL
DetailsCarl D Madsen
1st review completed  9/1/2017 FAIL
Routing - Design Review9/1/2017 9/1/2017 PASS
DetailsSarah Schafer
Routing PW Drainage7/13/2017 8/1/2017 FAIL
DetailsBrian Murphy
NEW SEEPAGE BED DESIGN AND APDEX J
Routing PW Sewer Design7/13/2017 7/19/2017 FAIL
DetailsKyle S. Rosenmeyer
Separate sewer extension approval required from Public Works.
Routing - MECHANICAL7/12/2017 7/19/2017 FAIL
DetailsTroy James
Routing - PLUMBING7/12/2017 7/19/2017 FAIL
DetailsBill VanDegrift
Provide information on the flammible liquids interceptor,
1) venting required
2) interceptor not shown on the civil drawings
Routing - FIRE7/12/20177/12/20177/14/2017 FAIL
DetailsScott Arellano
report attached to case and emailed to architect.
Routing - Erosion and Sediment7/12/2017 7/14/2017 PASS
DetailsMelissa Jannusch
Plan approved
Routing PW Solid Waste7/13/2017 7/13/2017 FAIL
DetailsEvan Carpenter
The eastern trash room must have an access ramp to the service drive within 15 feet of the trash room’s external door.
Routing PW Street Lights7/13/2017 7/13/2017 FAIL
DetailsTom Marshall
Routing - PLANNING7/12/2017 7/13/2017 PASS
DetailsCody Riddle
Approved by DR.
Routing - PLANNING Land Div7/12/2017 7/13/2017 FAIL
DetailsTodd Tucker
Building Permit cannot be issued until the parcels are combined into one with a record of survey for parcel consolidation.
Routing - Addressing7/12/2017 7/13/2017 FAIL
DetailsLaura Hunter
Need to consolidate parcels via record of survey
Routing - PUBLIC WORKS7/12/2017 7/13/2017 FAIL
DetailsRachael Beierle
FAILED DUE TO ADDRESSING
Routing - Design Review7/12/2017 7/13/2017 FAIL
DetailsSarah Schafer
Easement agreements and off-site parking approvals required prior to building permit sign off. Angie Brosious has been notified and applicant knows.
Intake Approval  7/12/2017 PASS
Application received  7/6/2017 DONE
Application submitted via PDS Online on Jul 6 2017 3:25PM
Routing PW Drainage1/17/2018 1/17/2017 FAIL
DetailsBrian Murphy
LOCATIONS OF SEEPAGE BEDS
First Notice 6/26/2020   
Routing - PUBLIC WORKS9/13/2017   FAIL
DetailsRachael Beierle
STREET LIGHTS FAILED 9/18/17