Afton condominiums - Phase I, 28 condos, retail and 2-story parking structure (This phase
includes only the concrete podium)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final2/21/20182/22/20182/22/2018APASS
DetailsAndy J. Long
Afton Phase I complete, this ESC permit is finaled. Phase II now about to begin this week or next, see ESC17-01346
General Inspection2/13/20182/13/20182/20/2018 PASS
DetailsMichael Zawacki
Andersen Construction has trailer on site and is beginning to stage equipment. No ground has been disturbed yet.
General Inspection1/29/20181/29/20181/29/2018 PASS
DetailsAndy J. Long
DI bags still installed. No activity yet for next phase. BMPs okay to remain for next phase, but new permit will be issued.
General Inspection1/12/20181/12/20181/12/2018 PASS
DetailsMichael Zawacki
No new work. Still just storage area.
General Inspection12/28/201712/28/201712/29/2017 PASS
DetailsAndy J. Long
No activity. Permits for phase II pending. No issues at site.
General Inspection12/13/201712/13/201712/14/2017 PASS
DetailsMichael Zawacki
No work on phase 2. Still a storage yard. Dis still installed. DI n 9th and River is starting to fall into drain.
General Inspection11/28/201711/28/201711/28/2017 PASS
DetailsMichael Zawacki
Phase 1 complete, phase 2 not started. All DIs still have protection and are maintained. Lot on corner of 9th and River fenced off and being used as storage. No dirt leaving site.
General Inspection11/13/201711/13/201711/13/2017 PASS
DetailsMichael Zawacki
First phase of condos complete. Second phase fenced off and being used as storage. No new work.
General Inspection10/27/201710/27/201711/1/2017 PASS
DetailsMichael Zawacki
No new activity
General Inspection10/12/201710/12/201710/12/2017 PASS
DetailsAndy J. Long
Phase I complete. Staging area and future building area for phase II are in use still. Next phase of permit under review, see GRD17-00061/ESC17-01346
General Inspection9/27/20179/27/20179/28/2017 PASS
DetailsAndy J. Long
Phase I complete. Staging area and future spot for phase II of Afton are still active. MS4 inlets have sediment filter bags. No trackout or discharges, stabilized access.
General Inspection9/12/20179/12/20179/13/2017 PASS
DetailsAndy J. Long
General Inspection8/28/20178/28/20178/28/2017 PASS
DetailsAndy J. Long
General Inspection8/11/20178/11/20178/14/2017 PASS
DetailsAndy J. Long
General Inspection7/27/20177/27/20177/28/2017 CANC
DetailsAndy J. Long
General Inspection7/12/20177/12/20177/14/2017 CANC
DetailsMelissa Jannusch
General Inspection6/27/20176/27/20176/28/2017 PASS
DetailsAndy J. Long
Inspected 6/26. No trackout. Building exterior complete, staging yard is still set up and not stabilized. DI bags still installed on River and 9th Street. No discharges or fugitive dust issues observed. Approved.
General Inspection6/12/20176/12/20176/12/2017 PASS
DetailsMelissa Jannusch
WIP on interior and exterior. Entrance is in good condition. No trackout or windblown trash. Okay.
General Inspection5/26/20175/26/20175/26/2017 PASS
DetailsAndy J. Long
WIP. No significant trackout. No loose trash or building materials on surrounding streets/sidewalks. No discharges occuring. Approved
General Inspection5/11/20175/11/20175/11/2017 PASS
DetailsMelissa Jannusch
No trackout. trash contained. No corrections
General Inspection4/26/20174/26/20174/28/2017 PASS
DetailsAndy J. Long
NO significant trackout, no discharges or loose trash/materials around perimeter of project. MS4 inlets have filter bags installed.
General Inspection4/11/20174/11/20174/11/2017 PASS
DetailsMelissa Jannusch
General Inspection3/27/20173/27/20173/27/2017 CANC
DetailsMelissa Jannusch
Tracking Control3/10/20173/10/20173/13/2017PPASS
DetailsMelissa Jannusch
General Inspection2/27/20172/27/20172/27/2017 PASS
DetailsAndy J. Long
DI bags installed, no trackout. Construcion entrance to River Street has had more rock added to improve condition. No corrections requested.
General Inspection2/10/20172/10/20172/10/2017PPASS
DetailsMelissa Jannusch
General Inspection1/30/20171/30/20171/30/2017 PASS
DetailsMelissa Jannusch

WIP on interior and exterior of building. No track out. DI bags look ok. Some areas still snow covered. Some trash around site.
General Inspection1/13/20171/13/20171/13/2017 PASS
DetailsAndy J. Long
WIP on interior and exterior finishes. No trackout or discharges. No issues with snowmelt and DI bags that are installed.
General Inspection12/29/201612/29/201612/29/2016 PASS
DetailsAndy J. Long
No trackout or discharges. Staging areas not muddy. No correcitons. DI bags installed to treat snow melt
General Inspection12/14/201612/14/201612/14/2016 PASS
DetailsAndy J. Long
General Inspection11/29/201611/29/201611/29/2016 PASS
DetailsAndy J. Long
WIP. Construction entrances are installed and in good condition. No trackout to streets, no discharges occuring. MS4 inlets have filter bag protection
General Inspection11/14/201611/14/201611/15/2016 PASS
DetailsAndy J. Long
No trackout to 9th or River. MS4 inlets have sediment protection. No trash issues on 8th Street. No discharges observed and gutters are free of mud and other materials.
General Inspection10/28/201610/28/201610/28/2016 PASS
DetailsAndy J. Long
WIP. NO trackout. DI bags and construction entrance maintained and in good condition. No corrections requested.
General Inspection10/13/201610/13/201610/13/2016 PASS
DetailsAndy J. Long
Vertical construction in progress. No trackout to 9th or River, stabilized construction entrances installed. No trash issues on 8th street, no discharges. MS4 inlets have filter bag protection. All other ESC permits for Afton have been closed and deferred to this permit.
General Inspection9/28/20169/28/20169/28/2016 PASS
DetailsAndy J. Long
Vertical construction in progress. All MS4 inlets around site are fitted with sediment filter bags. 2 x construction entrance. No trash, trackout, or discharges occuring
General Inspection9/13/20169/13/20169/13/2016 PASS
DetailsAndy J. Long
Vertical work ongoing. Two construction entrances installed, DIs have inlet protection. No discharges or spills around perimeter. No windblown trash on 8th Street.
General Inspection8/29/20168/29/20168/29/2016 PASS
DetailsEvan Jenkins
work in progress
General Inspection8/12/20168/12/20168/12/2016 PASS
DetailsAndy J. Long
General Inspection7/28/20167/28/20167/28/2016 PASS
DetailsAndy J. Long
DI bags installed and with plenty of filtering capacitiy. No trackout to 9th or River, no discharges. Wind blown or tossed litter on 8th Street was picked up as requested. Vertical consruction in progress. No corrections issued.
General Inspection7/13/20167/13/20167/13/2016 PASS
DetailsEvan Jenkins
No issues observed
General Inspection6/14/20166/28/20166/28/2016PPASS
DetailsAndy J. Long
Veritcal construction in progress. Perimeter BMPs installed. Sediment filter bags in storm drains are in good condition. No trackout, litter around site, or other issues. Approved.
General Inspection6/14/20166/14/20166/14/2016 PART
DetailsAndy J. Long
WIP on vertical wood frame above the lower level concrete podium. Both site gates have stabilized rock construction entrances. No trackout to 9th or River Street.

All receiving inlets have filter bag protection in good condition. No discharges, no fugitve dust observed.

Correction request:
- sweep up loose dirt and gravel in street on 8th Street. Pick up litter, some of it likely from employees

Note: closed initial demo and site set up permit ESC15-00789
General Inspection5/27/20165/27/20165/27/2016 PASS
DetailsAndy J. Long
WIP. No trackout or discharges around perimeter. BMPs installed per ESC plan. No corrections issued.
General Inspection5/11/20165/11/20165/11/2016 PASS
DetailsAndy J. Long
BMPs installed and being maintained regularly. Including rock construction entrances, DI protection, and street sweeping. No trackout, discharges, or fugitve dust.
General Inspection4/13/20164/13/20164/13/2016PPASS
DetailsAndy J. Long
Vertical construction in progress at Afton. No violations. See also ESC15-00789 for inspection information.