Site Final | 2/21/2018 | 2/22/2018 | 2/22/2018 | A | PASS |
Andy J. Long
|
|
|
Afton Phase I complete, this ESC permit is finaled. Phase II now about to begin this week or next, see ESC17-01346
|
General Inspection | 2/13/2018 | 2/13/2018 | 2/20/2018 | | PASS |
Michael Zawacki
|
|
|
Andersen Construction has trailer on site and is beginning to stage equipment. No ground has been disturbed yet.
|
General Inspection | 1/29/2018 | 1/29/2018 | 1/29/2018 | | PASS |
Andy J. Long
|
|
|
DI bags still installed. No activity yet for next phase. BMPs okay to remain for next phase, but new permit will be issued.
|
General Inspection | 1/12/2018 | 1/12/2018 | 1/12/2018 | | PASS |
Michael Zawacki
|
|
|
No new work. Still just storage area.
|
General Inspection | 12/28/2017 | 12/28/2017 | 12/29/2017 | | PASS |
Andy J. Long
|
|
|
No activity. Permits for phase II pending. No issues at site.
|
General Inspection | 12/13/2017 | 12/13/2017 | 12/14/2017 | | PASS |
Michael Zawacki
|
|
|
No work on phase 2. Still a storage yard. Dis still installed. DI n 9th and River is starting to fall into drain.
|
General Inspection | 11/28/2017 | 11/28/2017 | 11/28/2017 | | PASS |
Michael Zawacki
|
|
|
Phase 1 complete, phase 2 not started. All DIs still have protection and are maintained. Lot on corner of 9th and River fenced off and being used as storage. No dirt leaving site.
|
General Inspection | 11/13/2017 | 11/13/2017 | 11/13/2017 | | PASS |
Michael Zawacki
|
|
|
First phase of condos complete. Second phase fenced off and being used as storage. No new work.
|
General Inspection | 10/27/2017 | 10/27/2017 | 11/1/2017 | | PASS |
Michael Zawacki
|
|
|
No new activity
|
General Inspection | 10/12/2017 | 10/12/2017 | 10/12/2017 | | PASS |
Andy J. Long
|
|
|
Phase I complete. Staging area and future building area for phase II are in use still. Next phase of permit under review, see GRD17-00061/ESC17-01346
|
General Inspection | 9/27/2017 | 9/27/2017 | 9/28/2017 | | PASS |
Andy J. Long
|
|
|
Phase I complete. Staging area and future spot for phase II of Afton are still active. MS4 inlets have sediment filter bags. No trackout or discharges, stabilized access.
|
General Inspection | 9/12/2017 | 9/12/2017 | 9/13/2017 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/28/2017 | 8/28/2017 | 8/28/2017 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/11/2017 | 8/11/2017 | 8/14/2017 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 7/27/2017 | 7/27/2017 | 7/28/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/12/2017 | 7/12/2017 | 7/14/2017 | | CANC |
Melissa Jannusch
|
|
|
|
General Inspection | 6/27/2017 | 6/27/2017 | 6/28/2017 | | PASS |
Andy J. Long
|
|
|
Inspected 6/26. No trackout. Building exterior complete, staging yard is still set up and not stabilized. DI bags still installed on River and 9th Street. No discharges or fugitive dust issues observed. Approved.
|
General Inspection | 6/12/2017 | 6/12/2017 | 6/12/2017 | | PASS |
Melissa Jannusch
|
|
|
WIP on interior and exterior. Entrance is in good condition. No trackout or windblown trash. Okay.
|
General Inspection | 5/26/2017 | 5/26/2017 | 5/26/2017 | | PASS |
Andy J. Long
|
|
|
WIP. No significant trackout. No loose trash or building materials on surrounding streets/sidewalks. No discharges occuring. Approved
|
General Inspection | 5/11/2017 | 5/11/2017 | 5/11/2017 | | PASS |
Melissa Jannusch
|
|
|
No trackout. trash contained. No corrections
|
General Inspection | 4/26/2017 | 4/26/2017 | 4/28/2017 | | PASS |
Andy J. Long
|
|
|
NO significant trackout, no discharges or loose trash/materials around perimeter of project. MS4 inlets have filter bags installed.
|
General Inspection | 4/11/2017 | 4/11/2017 | 4/11/2017 | | PASS |
Melissa Jannusch
|
|
|
|
General Inspection | 3/27/2017 | 3/27/2017 | 3/27/2017 | | CANC |
Melissa Jannusch
|
|
|
|
Tracking Control | 3/10/2017 | 3/10/2017 | 3/13/2017 | P | PASS |
Melissa Jannusch
|
|
|
|
General Inspection | 2/27/2017 | 2/27/2017 | 2/27/2017 | | PASS |
Andy J. Long
|
|
|
DI bags installed, no trackout. Construcion entrance to River Street has had more rock added to improve condition. No corrections requested.
|
General Inspection | 2/10/2017 | 2/10/2017 | 2/10/2017 | P | PASS |
Melissa Jannusch
|
|
|
|
General Inspection | 1/30/2017 | 1/30/2017 | 1/30/2017 | | PASS |
Melissa Jannusch
|
|
|
WIP on interior and exterior of building. No track out. DI bags look ok. Some areas still snow covered. Some trash around site.
|
General Inspection | 1/13/2017 | 1/13/2017 | 1/13/2017 | | PASS |
Andy J. Long
|
|
|
WIP on interior and exterior finishes. No trackout or discharges. No issues with snowmelt and DI bags that are installed.
|
General Inspection | 12/29/2016 | 12/29/2016 | 12/29/2016 | | PASS |
Andy J. Long
|
|
|
No trackout or discharges. Staging areas not muddy. No correcitons. DI bags installed to treat snow melt
|
General Inspection | 12/14/2016 | 12/14/2016 | 12/14/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 11/29/2016 | 11/29/2016 | 11/29/2016 | | PASS |
Andy J. Long
|
|
|
WIP. Construction entrances are installed and in good condition. No trackout to streets, no discharges occuring. MS4 inlets have filter bag protection
|
General Inspection | 11/14/2016 | 11/14/2016 | 11/15/2016 | | PASS |
Andy J. Long
|
|
|
No trackout to 9th or River. MS4 inlets have sediment protection. No trash issues on 8th Street. No discharges observed and gutters are free of mud and other materials.
|
General Inspection | 10/28/2016 | 10/28/2016 | 10/28/2016 | | PASS |
Andy J. Long
|
|
|
WIP. NO trackout. DI bags and construction entrance maintained and in good condition. No corrections requested.
|
General Inspection | 10/13/2016 | 10/13/2016 | 10/13/2016 | | PASS |
Andy J. Long
|
|
|
Vertical construction in progress. No trackout to 9th or River, stabilized construction entrances installed. No trash issues on 8th street, no discharges. MS4 inlets have filter bag protection. All other ESC permits for Afton have been closed and deferred to this permit.
|
General Inspection | 9/28/2016 | 9/28/2016 | 9/28/2016 | | PASS |
Andy J. Long
|
|
|
Vertical construction in progress. All MS4 inlets around site are fitted with sediment filter bags. 2 x construction entrance. No trash, trackout, or discharges occuring
|
General Inspection | 9/13/2016 | 9/13/2016 | 9/13/2016 | | PASS |
Andy J. Long
|
|
|
Vertical work ongoing. Two construction entrances installed, DIs have inlet protection. No discharges or spills around perimeter. No windblown trash on 8th Street.
|
General Inspection | 8/29/2016 | 8/29/2016 | 8/29/2016 | | PASS |
Evan Jenkins
|
|
|
work in progress
|
General Inspection | 8/12/2016 | 8/12/2016 | 8/12/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 7/28/2016 | 7/28/2016 | 7/28/2016 | | PASS |
Andy J. Long
|
|
|
DI bags installed and with plenty of filtering capacitiy. No trackout to 9th or River, no discharges. Wind blown or tossed litter on 8th Street was picked up as requested. Vertical consruction in progress. No corrections issued.
|
General Inspection | 7/13/2016 | 7/13/2016 | 7/13/2016 | | PASS |
Evan Jenkins
|
|
|
No issues observed
|
General Inspection | 6/14/2016 | 6/28/2016 | 6/28/2016 | P | PASS |
Andy J. Long
|
|
|
Veritcal construction in progress. Perimeter BMPs installed. Sediment filter bags in storm drains are in good condition. No trackout, litter around site, or other issues. Approved.
|
General Inspection | 6/14/2016 | 6/14/2016 | 6/14/2016 | | PART |
Andy J. Long
|
|
|
WIP on vertical wood frame above the lower level concrete podium. Both site gates have stabilized rock construction entrances. No trackout to 9th or River Street.
All receiving inlets have filter bag protection in good condition. No discharges, no fugitve dust observed.
Correction request: - sweep up loose dirt and gravel in street on 8th Street. Pick up litter, some of it likely from employees
Note: closed initial demo and site set up permit ESC15-00789
|
General Inspection | 5/27/2016 | 5/27/2016 | 5/27/2016 | | PASS |
Andy J. Long
|
|
|
WIP. No trackout or discharges around perimeter. BMPs installed per ESC plan. No corrections issued.
|
General Inspection | 5/11/2016 | 5/11/2016 | 5/11/2016 | | PASS |
Andy J. Long
|
|
|
BMPs installed and being maintained regularly. Including rock construction entrances, DI protection, and street sweeping. No trackout, discharges, or fugitve dust.
|
General Inspection | 4/13/2016 | 4/13/2016 | 4/13/2016 | P | PASS |
Andy J. Long
|
|
|
Vertical construction in progress at Afton. No violations. See also ESC15-00789 for inspection information.
|