Site Final | 7/24/2019 | 7/24/2019 | 7/24/2019 | P | PASS |
Michael Zawacki
|
|
|
Okay to final subdivision permit unless any new issues/disturbed area; we will work with CBH for any remaining issues and temp. BMP removal. No new phasing has begun, still only work on coho and chinook.
|
General Inspection | 6/24/2019 | 6/24/2019 | 6/24/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/23/2019 | 5/23/2019 | 5/23/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/22/2019 | 4/22/2019 | 4/22/2019 | | PART |
Michael Zawacki
|
|
|
Some dirt on sidewalks, homes have downspouts onto bare lots. Washout is full and will need to be replaced before next batch of foundations.
|
General Inspection | 3/21/2019 | 3/21/2019 | 3/21/2019 | | FAIL |
Michael Zawacki
|
|
|
Dirt on road, sidewalk, and in gutters. Wind blown trash around perimeter. Washout on site, washout has still been dumped on vacant lots. Will need to contact person responsible for entire site.
|
General Inspection | 1/17/2019 | 1/17/2019 | 1/17/2019 | | FAIL |
Michael Zawacki
|
|
|
Llots are dirty, lots of trash and trackout. Needs to be cleaned.
|
General Inspection | 12/17/2018 | 12/17/2018 | 12/17/2018 | A | FAIL |
Andy J. Long
|
|
|
Corrections needed:
- post permit signs on active projects - do maintenance on DI bags along Chinook. - no concrete washout
Wrong RP listed on permit.
Correction given to CBH Colby. He stated RP for South Fork is Joel Hirtle.
See ESC18-01651 for additional enforcement.
|
General Inspection | 11/21/2018 | 11/21/2018 | 11/21/2018 | P | PASS |
Michael Zawacki
|
|
|
Only home under construction is complete. Some foundations done that have been sitting for a while. No ESC issues at site.
|
General Inspection | 10/25/2018 | 10/25/2018 | 10/25/2018 | | PASS |
Michael Zawacki
|
|
|
One homesite under construction, yard has been landscaped and is interior work only. Few poured foundations are sitting idle and overgrown. All vacant lots are week covered and stable.
|
General Inspection | 9/21/2018 | 9/24/2018 | 9/25/2018 | P | PART |
Michael Zawacki
|
|
|
Excavated washout on site, has no liner. Some dirt on neighborhood streets.
|
General Inspection | 9/21/2018 | 9/21/2018 | 9/21/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/21/2018 | 8/21/2018 | 8/21/2018 | P | PASS |
Andy J. Long
|
|
|
WIP on SFH by CBH. Subdivision phase development complete. DI bags are installed. Concrete washout pit provided. No dust issues observed at time of inspection.
|
General Inspection | 7/26/2018 | 7/26/2018 | 7/26/2018 | | PASS |
Michael Zawacki
|
|
|
No current activity. Four homes complete, few foundation poured and sitting idle. All l;ots are overgrown. Old silt fence still along perimeter, DIs protected. Sand dirt and rocks on sidewalk.
|
General Inspection | 6/25/2018 | 6/25/2018 | 6/25/2018 | | PASS |
Michael Zawacki
|
|
|
Currently no work. 2 foundations that are poured but lots are now overgrown. All current homes are landscaped. Some dirt on sidewalk left from landscapers. Neighborhood BMPs still in place.
|
General Inspection | 5/24/2018 | 5/24/2018 | 5/25/2018 | | PART |
Michael Zawacki
|
|
|
Some trackout and dirt on sidewalks.
|
General Inspection | 4/23/2018 | 4/23/2018 | 4/24/2018 | | PART |
Michael Zawacki
|
|
|
Lots of dirt and trackout on road. Witches hats on Coho are full. Old washout that was dumped on ground needs to be cleaned.
|
General Inspection | 3/23/2018 | 3/23/2018 | 3/23/2018 | | FAIL |
Michael Zawacki
|
|
|
Few homes under construction. Areas where building have trackout and piles of trash. Looks like no one cares about keeping area clean.
|
General Inspection | 2/9/2018 | 2/20/2018 | 2/21/2018 | P | FAIL |
Andy J. Long
|
|
|
CBH needs to install concrete washout facility for new home construction, and each home shall have trash containment box to limit wind blown trash.
|
General Inspection | 2/8/2018 | 2/8/2018 | 2/9/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/8/2018 | 1/8/2018 | 1/8/2018 | P | PASS |
Andy J. Long
|
|
|
Subdivision phase complete. No recent activity. CBH has pulled two SFH permits on Chinook but no excavation or activity started. DIs in sub have inlet protection already installed. CBH will need to provide designated concrete washout.
|
General Inspection | 12/18/2017 | 12/18/2017 | 12/18/2017 | | PASS |
Michael Zawacki
|
|
|
No new activity.
|
General Inspection | 11/16/2017 | 11/16/2017 | 11/17/2017 | | PASS |
Michael Zawacki
|
|
|
No new active construction. Roads and sidewalks are in, site lots all sitting vacant. DIs are clean. Perimeter controls will need to be replaced before any new building occurs.
|
General Inspection | 10/16/2017 | 10/16/2017 | 10/16/2017 | P | PASS |
Michael Zawacki
|
|
|
No recent activity. SIlt fence is in disrepair but all lots have substantial vegatative growth. Some trackout not related to construction, looks like caused by four wheeler or UTV. DIs protected and level is good. No permit or SWPPP information available.
|
General Inspection | 9/28/2017 | 9/28/2017 | 10/2/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/28/2017 | 8/28/2017 | 8/30/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/28/2017 | 7/28/2017 | 7/28/2017 | A | PASS |
Andy J. Long
|
|
|
Subdivsion roads and infrastructure complete. New storm drains were fitted with sediment filter bags.
No SFH activity. Lots vegetated with grass and weeds including some stockpiles. No sediment runoff or fugtive dust issues observed or reported.
|
General Inspection | 7/24/2017 | 7/25/2017 | 7/28/2017 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/19/2017 | 7/21/2017 | 7/24/2017 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/17/2017 | 7/17/2017 | 7/19/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/15/2017 | 6/15/2017 | 6/19/2017 | | CANC |
Melissa Jannusch
|
|
|
|
General Inspection | 5/15/2017 | 5/15/2017 | 5/16/2017 | | PASS |
Melissa Jannusch
|
|
|
Project inactive. DI bags installed. No corrections.
|
General Inspection | 4/14/2017 | 4/14/2017 | 4/17/2017 | | PASS |
Melissa Jannusch
|
|
|
Roads, gutters, sidewalks, stormwater infrastructure installed. No WIP during time of inspection. Silt fence needs repairs, DI bags are installed. Soil is not stable. Stockpiles on site. SWPPP inspections are up to date. Project ok.
|
General Inspection | 3/10/2017 | 3/14/2017 | 3/14/2017 | P | PASS |
Melissa Jannusch
|
|
|
Work on roads is in progress. SWPPP inspection are up to date. Some minor maintenance needed on silt fence. Left message with RP Jeff asking for timeline on installing DI bags and reminding about use of concrete washout once concrete work begins. No trackout sign is posted. Project okay.
|
General Inspection | 3/10/2017 | 3/10/2017 | 3/10/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/7/2017 | 2/7/2017 | 2/9/2017 | P | PASS |
Melissa Jannusch
|
|
|
No WIP. No corrections
|
General Inspection | 1/23/2017 | 1/23/2017 | 1/26/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/22/2016 | 12/22/2016 | 12/28/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/21/2016 | 11/21/2016 | 11/21/2016 | P | PASS |
Andy J. Long
|
|
|
WIP on South Fork subdivision grading. SWPPP information and City of Boise ESC sign posted at entrance on Chinook. No trackout or discharges to street. Silt fence perimeter installed on western limit of disturbance. Existing storm water swale protected. . No fugitive dust plumes observed or reported.
No corrections requested.
|
General Inspection | 11/3/2016 | 11/16/2016 | 11/21/2016 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/27/2016 | 10/31/2016 | 11/3/2016 | A | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 10/27/2016 | 10/27/2016 | 10/27/2016 | | CANC |
Andy J. Long
|
|
|
rescheduled for 10/31
|
General Inspection | 2/18/2019 | 2/18/2019 | | | |
Andy J. Long
|
|
|
|