Information based on query as of Friday, May 10, 2024.
Permit Information
Permit NumberESC16-00556
StatusFinaled
Name JEFF KORSEN
Site Address 6061 S CHINOOK WAY
Project NameFork South Subdivision
Customer Number 
ePlanReviewNo
Description
BMP installation and site preparation inspection by ESC division required. Call 384-3802 to schedule. Relatively flat site with no dewatering anticipated. No surface waters or wetlands within project area. Will need to control fugitive dust during grading actiivities. eNOI/CGP tracking # IDR12AG63
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final7/24/20197/24/20197/24/2019PPASS
DetailsMichael Zawacki
Okay to final subdivision permit unless any new issues/disturbed area; we will work with CBH for any remaining issues and temp. BMP removal.
No new phasing has begun, still only work on coho and chinook.
General Inspection6/24/20196/24/20196/24/2019 CANC
DetailsAndy J. Long
General Inspection5/23/20195/23/20195/23/2019 CANC
DetailsAndy J. Long
General Inspection4/22/20194/22/20194/22/2019 PART
DetailsMichael Zawacki
Some dirt on sidewalks, homes have downspouts onto bare lots. Washout is full and will need to be replaced before next batch of foundations.
General Inspection3/21/20193/21/20193/21/2019 FAIL
DetailsMichael Zawacki
Dirt on road, sidewalk, and in gutters. Wind blown trash around perimeter. Washout on site, washout has still been dumped on vacant lots. Will need to contact person responsible for entire site.
General Inspection1/17/20191/17/20191/17/2019 FAIL
DetailsMichael Zawacki
Llots are dirty, lots of trash and trackout. Needs to be cleaned.
General Inspection12/17/201812/17/201812/17/2018AFAIL
DetailsAndy J. Long
Corrections needed:

- post permit signs on active projects
- do maintenance on DI bags along Chinook.
- no concrete washout

Wrong RP listed on permit.


Correction given to CBH Colby. He stated RP for South Fork is Joel Hirtle.

See ESC18-01651 for additional enforcement.
General Inspection11/21/201811/21/201811/21/2018PPASS
DetailsMichael Zawacki
Only home under construction is complete. Some foundations done that have been sitting for a while. No ESC issues at site.
General Inspection10/25/201810/25/201810/25/2018 PASS
DetailsMichael Zawacki
One homesite under construction, yard has been landscaped and is interior work only. Few poured foundations are sitting idle and overgrown. All vacant lots are week covered and stable.
General Inspection9/21/20189/24/20189/25/2018PPART
DetailsMichael Zawacki
Excavated washout on site, has no liner. Some dirt on neighborhood streets.
General Inspection9/21/20189/21/20189/21/2018 CANC
DetailsAndy J. Long
General Inspection8/21/20188/21/20188/21/2018PPASS
DetailsAndy J. Long
WIP on SFH by CBH. Subdivision phase development complete. DI bags are installed. Concrete washout pit provided. No dust issues observed at time of inspection.
General Inspection7/26/20187/26/20187/26/2018 PASS
DetailsMichael Zawacki
No current activity. Four homes complete, few foundation poured and sitting idle. All l;ots are overgrown. Old silt fence still along perimeter, DIs protected. Sand dirt and rocks on sidewalk.
General Inspection6/25/20186/25/20186/25/2018 PASS
DetailsMichael Zawacki
Currently no work. 2 foundations that are poured but lots are now overgrown. All current homes are landscaped. Some dirt on sidewalk left from landscapers. Neighborhood BMPs still in place.
General Inspection5/24/20185/24/20185/25/2018 PART
DetailsMichael Zawacki
Some trackout and dirt on sidewalks.
General Inspection4/23/20184/23/20184/24/2018 PART
DetailsMichael Zawacki
Lots of dirt and trackout on road. Witches hats on Coho are full. Old washout that was dumped on ground needs to be cleaned.
General Inspection3/23/20183/23/20183/23/2018 FAIL
DetailsMichael Zawacki
Few homes under construction. Areas where building have trackout and piles of trash. Looks like no one cares about keeping area clean.
General Inspection2/9/20182/20/20182/21/2018PFAIL
DetailsAndy J. Long
CBH needs to install concrete washout facility for new home construction, and each home shall have trash containment box to limit wind blown trash.
General Inspection2/8/20182/8/20182/9/2018 CANC
DetailsAndy J. Long
General Inspection1/8/20181/8/20181/8/2018PPASS
DetailsAndy J. Long
Subdivision phase complete. No recent activity. CBH has pulled two SFH permits on Chinook but no excavation or activity started. DIs in sub have inlet protection already installed. CBH will need to provide designated concrete washout.
General Inspection12/18/201712/18/201712/18/2017 PASS
DetailsMichael Zawacki
No new activity.
General Inspection11/16/201711/16/201711/17/2017 PASS
DetailsMichael Zawacki
No new active construction. Roads and sidewalks are in, site lots all sitting vacant. DIs are clean. Perimeter controls will need to be replaced before any new building occurs.
General Inspection10/16/201710/16/201710/16/2017PPASS
DetailsMichael Zawacki
No recent activity. SIlt fence is in disrepair but all lots have substantial vegatative growth. Some trackout not related to construction, looks like caused by four wheeler or UTV. DIs protected and level is good. No permit or SWPPP information available.
General Inspection9/28/20179/28/201710/2/2017 CANC
DetailsAndy J. Long
General Inspection8/28/20178/28/20178/30/2017 CANC
DetailsAndy J. Long
General Inspection7/28/20177/28/20177/28/2017APASS
DetailsAndy J. Long
Subdivsion roads and infrastructure complete. New storm drains were fitted with sediment filter bags.

No SFH activity. Lots vegetated with grass and weeds including some stockpiles. No sediment runoff or fugtive dust issues observed or reported.
General Inspection7/24/20177/25/20177/28/2017ACANC
DetailsAndy J. Long
General Inspection7/19/20177/21/20177/24/2017ACANC
DetailsAndy J. Long
General Inspection7/17/20177/17/20177/19/2017 CANC
DetailsAndy J. Long
General Inspection6/15/20176/15/20176/19/2017 CANC
DetailsMelissa Jannusch
General Inspection5/15/20175/15/20175/16/2017 PASS
DetailsMelissa Jannusch
Project inactive. DI bags installed. No corrections.
General Inspection4/14/20174/14/20174/17/2017 PASS
DetailsMelissa Jannusch
Roads, gutters, sidewalks, stormwater infrastructure installed. No WIP during time of inspection. Silt fence needs repairs, DI bags are installed. Soil is not stable. Stockpiles on site. SWPPP inspections are up to date. Project ok.
General Inspection3/10/20173/14/20173/14/2017PPASS
DetailsMelissa Jannusch
Work on roads is in progress. SWPPP inspection are up to date. Some minor maintenance needed on silt fence. Left message with RP Jeff asking for timeline on installing DI bags and reminding about use of concrete washout once concrete work begins. No trackout sign is posted. Project okay.
General Inspection3/10/20173/10/20173/10/2017 CANC
DetailsAndy J. Long
General Inspection2/7/20172/7/20172/9/2017PPASS
DetailsMelissa Jannusch
No WIP. No corrections
General Inspection1/23/20171/23/20171/26/2017 CANC
DetailsAndy J. Long
General Inspection12/22/201612/22/201612/28/2016 CANC
DetailsAndy J. Long
General Inspection11/21/201611/21/201611/21/2016PPASS
DetailsAndy J. Long
WIP on South Fork subdivision grading. SWPPP information and City of Boise ESC sign posted at entrance on Chinook. No trackout or discharges to street. Silt fence perimeter installed on western limit of disturbance. Existing storm water swale protected. . No fugitive dust plumes observed or reported.

No corrections requested.
General Inspection11/3/201611/16/201611/21/2016PCANC
DetailsAndy J. Long
General Inspection10/27/201610/31/201611/3/2016ACANC
DetailsAndy J. Long
rescheduled
General Inspection10/27/201610/27/201610/27/2016 CANC
DetailsAndy J. Long
rescheduled for 10/31
General Inspection2/18/20192/18/2019   
DetailsAndy J. Long