Site Final | 6/12/2020 | 6/12/2020 | 6/12/2020 | P | PASS |
Andy J. Long
|
|
|
All units complete. Disturbed area stabilized. No ESC requests for developer. Will have CBH remove the two temporary sediment bags in subdivsion.
|
Aging Inspection | 6/8/2020 | 6/8/2020 | 6/12/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/7/2020 | 4/7/2020 | 4/7/2020 | P | PASS |
Michael Zawacki
|
|
|
Neighborhood about finished. Will need all BMPs removed before final.
|
General Inspection | 3/16/2020 | 3/16/2020 | 3/16/2020 | P | PASS |
Michael Zawacki
|
|
|
Few lots still need landscaping. Streets will need to be swept and inlet protection removed before site final.
|
General Inspection | 2/14/2020 | 2/14/2020 | 2/14/2020 | P | PASS |
Michael Zawacki
|
|
|
All home exterior constrction completed. Landscaping has begun on some of the homes.
|
Aging Inspection | 1/7/2020 | 1/7/2020 | 1/7/2020 | | PASS |
Michael Zawacki
|
|
|
All homes are3 being framed. No current concrete work. No loose trash, some mud, workers parked on both sides of street.
|
General Inspection | 11/7/2019 | 11/7/2019 | 11/7/2019 | P | PASS |
Michael Zawacki
|
|
|
Homes in multiple phases of construction. Orange fence installed on rod iron fence acting as trash catch. Inlets all have protection. Large lined washout on site and in use. Some dirt tracked on roads and sidewalks.
|
General Inspection | 10/7/2019 | 10/7/2019 | 10/7/2019 | P | PASS |
Andy J. Long
|
|
|
CBH in progress of building on Obelisks Street. Storm drains have sediment protection installed, lined concrete washout pit utilized. ESC permits are posted.
|
General Inspection | 8/16/2019 | 8/16/2019 | 8/16/2019 | P | PASS |
Michael Zawacki
|
|
|
3 homes under construction. Lined washout in rear of site. No dumped or spilled washout.
|
General Inspection | 7/10/2019 | 7/10/2019 | 7/10/2019 | P | PASS |
Michael Zawacki
|
|
|
No new activity, site is stable.
|
Aging Inspection | 6/17/2019 | 6/17/2019 | 6/17/2019 | | PASS |
Michael Zawacki
|
|
|
Inlet protection still installed, washout on site. Most homes are completed. No loose or blowing trash. Roads look like sweeper recently came through.
|
General Inspection | 4/15/2019 | 4/15/2019 | 4/15/2019 | P | PASS |
Michael Zawacki
|
|
|
No new activity.
|
Aging Inspection | 3/11/2019 | 3/11/2019 | 3/15/2019 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 1/7/2019 | 1/7/2019 | 1/8/2019 | | PASS |
Andy J. Long
|
|
|
No activity. Infrastructure complete, storm drains already fitted with sediment protection.
|
Aging Inspection | 11/5/2018 | 11/5/2018 | 11/8/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/5/2018 | 9/5/2018 | 9/5/2018 | P | PASS |
Michael Zawacki
|
|
|
ite prep work complete. Roads and sidewalks in place. No homesite work has begun. Power plus is on site.
|
General Inspection | 8/6/2018 | 8/6/2018 | 8/6/2018 | P | PASS |
Andy J. Long
|
|
|
No new activity. No SFHs yet. Reported to be a CBH subdivision. Will need to install concrete washout as soon as first BLD permit for homes is issued. This is so they will not use the washout that is designated for Bonneville subdivsion phase #2.
|
General Inspection | 7/16/2018 | 7/16/2018 | 7/16/2018 | P | PASS |
Andy J. Long
|
|
|
No SFH activity started yet. Subdivision infrastructure construction is complete. DIs have sediment protection. No ESC requests.
|
General Inspection | 7/2/2018 | 7/2/2018 | 7/2/2018 | | PASS |
Andy J. Long
|
|
|
Subdivsion infrastructure and grading complete. No SFH activitiy. No ESC corrections requested.
|
General Inspection | 5/2/2018 | 5/2/2018 | 5/2/2018 | P | PASS |
Andy J. Long
|
|
|
WIP on site development and parcel grading. Project has stayed witin clearing limits. No fugitive dust observed, water trailer is onsite.
Will notify RP to have crew do a trash pick up along the east fence where there is some wind blown construction trash.
|
General Inspection | 4/6/2018 | 4/11/2018 | 4/16/2018 | P | PEND |
Michael Zawacki
|
|
|
Trackout onto Obelisks & Columbia. Sunroc is hauling into material for roadbed.
|
General Inspection | 4/6/2018 | 4/6/2018 | 4/6/2018 | P | FAIL |
Andy J. Long
|
|
|
Corrections: - construction entrance or sweeper on site. - post green ESC permit sign on SWPPP
WIP on installing road base.
|
Aging Inspection | 2/21/2018 | 2/21/2018 | 2/21/2018 | | PASS |
Michael Zawacki
|
|
|
Sewer installation in complete. No workers or equipment on site. Site is completely exposed.
|
Random Inspection | 12/21/2017 | 12/21/2017 | 12/21/2017 | P | PART |
Michael Zawacki
|
|
|
DIrt staying on site. Some track out onto Obelisk.
|
General Inspection | 12/8/2017 | 12/8/2017 | 12/8/2017 | P | FAIL |
Michael Zawacki
|
|
|
Exiting site onto Obelisk causing significant trackout onto neighboring project. Causing significant trackout onto Columbia.
|
General Inspection | 11/8/2017 | 11/8/2017 | 11/9/2017 | P | PEND |
Michael Zawacki
|
|
|
Trackout onto Columbia. Not using entrance. Inspected 11-8.
|
General Inspection | 10/12/2017 | 10/12/2017 | 10/12/2017 | P | PASS |
Michael Zawacki
|
|
|
Syman is handling inspections, last did 10-9. There are issues with trackout and the entrance, looks like people are going around. I sent a message to RP to fix situation. All dirt is contained to site, no dust visible. Currently they are installing sewer lines.
|
General Inspection | 7/6/2017 | 7/6/2017 | 7/6/2017 | P | PASS |
Melissa Jannusch
|
|
|
WIP on trenching. No fugitive dust observed at time of inspection. Sign is posted. SCE is installed and in good condition. No corrections issued.
|
Site Preparation | 5/4/2017 | 5/11/2017 | 5/10/2017 | A | PASS |
Melissa Jannusch
|
|
|
Okay to start. The sign is posted and SCE is installed
|
Site Preparation | 5/2/2017 | 5/4/2017 | 5/4/2017 | A | NR |
Melissa Jannusch
|
|
|
No construction entrance. No SWPPP sign posted.
Farewell Bend
check for construction entrance and permit posting
|