Site Final | 2/24/2020 | 2/28/2020 | 2/28/2020 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 2/24/2020 | 2/24/2020 | 2/24/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/7/2020 | 2/7/2020 | 2/7/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/23/2020 | 1/23/2020 | 1/23/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/8/2020 | 1/8/2020 | 1/8/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/24/2019 | 12/24/2019 | 12/24/2019 | | PASS |
Michael Zawacki
|
|
|
All work looks completed, no issues.
|
General Inspection | 12/9/2019 | 12/9/2019 | 12/9/2019 | | PASS |
Michael Zawacki
|
|
|
Site is clean and looks completed. Some concrete blanket on vacant lot above home.
|
General Inspection | 11/22/2019 | 11/22/2019 | 11/22/2019 | | PASS |
Michael Zawacki
|
|
|
All work and landscaping about complete. Was some work along hill, not sure if part of project or to do with Suez water.
|
General Inspection | 11/7/2019 | 11/7/2019 | 11/8/2019 | | PASS |
Michael Zawacki
|
|
|
Lot contained, no esc issues.
|
General Inspection | 10/23/2019 | 10/23/2019 | 10/24/2019 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 10/8/2019 | 10/8/2019 | 10/9/2019 | | PASS |
Michael Zawacki
|
|
|
Site is fence and contained. All waste removed from lot up collister from home.
|
General Inspection | 9/23/2019 | 9/23/2019 | 9/23/2019 | | PASS |
Michael Zawacki
|
|
|
Area is fenced and contained. No trash leaving site, no dirt working down towards hill road.
|
General Inspection | 9/6/2019 | 9/6/2019 | 9/6/2019 | | PASS |
Michael Zawacki
|
|
|
No runoff to hill rd. Site contained.
|
General Inspection | 8/22/2019 | 8/22/2019 | 8/22/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/7/2019 | 8/7/2019 | 8/7/2019 | | PASS |
Michael Zawacki
|
|
|
Site is contained, fence is up. All access to site now comes from above an Collister.
|
General Inspection | 7/23/2019 | 7/23/2019 | 7/23/2019 | | PASS |
Michael Zawacki
|
|
|
Site is clean and contained. Fence crew on site, will need to be careful to not build in trash box.
|
General Inspection | 7/8/2019 | 7/8/2019 | 7/8/2019 | P | PASS |
Michael Zawacki
|
|
|
WIP no issues. Someone has dumped washout on lot above home. They will have their excavator clean it when he comes to grade lot.
|
General Inspection | 6/24/2019 | 6/24/2019 | 6/25/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/7/2019 | 6/7/2019 | 6/10/2019 | | PASS |
Michael Zawacki
|
|
|
WIP on framing and sprinkler lines. No loose trash, some lumber around home. No dust or trackout. Owner on site.
|
General Inspection | 5/23/2019 | 5/23/2019 | 5/24/2019 | | PASS |
Michael Zawacki
|
|
|
Framing has begun. Material stored by Suez pump house, no ESC issues. Owners live next door.
|
General Inspection | 5/8/2019 | 5/8/2019 | 5/8/2019 | | PASS |
Michael Zawacki
|
|
|
Talked with owner while on site. All backfill is in, plan on getting framing started ASAP. Will begin landscaping along perimeter, will set up sprinklers for dust control. No ESC issues.
|
General Inspection | 4/23/2019 | 4/23/2019 | 4/23/2019 | | PASS |
Michael Zawacki
|
|
|
Backfill has been filled back in foundation. New forms being installed for wall in front of both homes. Some excavation around site. No ESC issues.
|
General Inspection | 4/8/2019 | 4/8/2019 | 4/9/2019 | | PASS |
Michael Zawacki
|
|
|
No new activity, no runoff.
|
General Inspection | 3/22/2019 | 3/22/2019 | 3/22/2019 | | PASS |
Michael Zawacki
|
|
|
Foundation poured, hasn't been backfilled. No dirt leaving site.
|
General Inspection | 3/7/2019 | 3/7/2019 | 3/7/2019 | P | PASS |
Michael Zawacki
|
|
|
Foundation poured. No dirt leaving site.
|
General Inspection | 3/5/2019 | 3/5/2019 | 3/6/2019 | | PASS |
Michael Zawacki
|
|
|
Inspected 3-5. No esc issues
|
General Inspection | 2/1/2019 | 2/1/2019 | 2/1/2019 | | PASS |
Michael Zawacki
|
|
|
Foundation poured and site contained.
|
General Inspection | 1/17/2019 | 1/17/2019 | 1/17/2019 | P | PASS |
Andy J. Long
|
|
|
No trackout or sediment runoff. Permit posted.
|
General Inspection | 1/11/2019 | 1/11/2019 | 1/11/2019 | | PASS |
Michael Zawacki
|
|
|
Met with builder on site. Majority of concrete work complete, garage will be finished next week. Used pond liner and made washout, has been removed and new one will be used for next pour. No dirt or trackout leaving site. Backfill should be replaced next week.
|
General Inspection | 12/27/2018 | 12/27/2018 | 12/27/2018 | | PASS |
Michael Zawacki
|
|
|
Forms in place for foundation. No dirt leaving site.
|
General Inspection | 12/12/2018 | 12/12/2018 | 12/12/2018 | P | PASS |
Michael Zawacki
|
|
|
No new activity.
|
General Inspection | 11/30/2018 | 11/30/2018 | 11/30/2018 | | PASS |
Michael Zawacki
|
|
|
Concrete workers have begun placing forms. Talked to owner, hoping to get foundation in Next week. No dirt leaving site.
|
General Inspection | 11/15/2018 | 11/15/2018 | 11/15/2018 | | PASS |
Michael Zawacki
|
|
|
No new activity. Forms on site haven't been placed.
|
General Inspection | 10/31/2018 | 10/31/2018 | 10/31/2018 | | PASS |
Michael Zawacki
|
|
|
Trailer with forms for foundation on site. No new work has begun.
|
General Inspection | 10/16/2018 | 10/16/2018 | 10/16/2018 | | PASS |
Michael Zawacki
|
|
|
Perimeter controls were installed, no runoff to hill. Area is excavated, no concrete work.
|
General Inspection | 10/1/2018 | 10/1/2018 | 10/1/2018 | | PART |
Michael Zawacki
|
|
|
Met with builder on site. Gator guard on bottoms is partially buried and not long enough. No ESC permit displayed. Builder said both will be taken care off. Concrete work scheduled for this week, will need to look for washout.
|
General Inspection | 9/14/2018 | 9/14/2018 | 9/14/2018 | | PASS |
Michael Zawacki
|
|
|
Hasn't begun.
|
General Inspection | 8/30/2018 | 8/30/2018 | 8/30/2018 | | PASS |
Michael Zawacki
|
|
|
No work has started.
|
General Inspection | 8/15/2018 | 8/15/2018 | 8/15/2018 | | PASS |
Michael Zawacki
|
|
|
Work hasn't begun.
|
General Inspection | 7/31/2018 | 7/31/2018 | 7/31/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/16/2018 | 7/16/2018 | 7/16/2018 | | PASS |
Michael Zawacki
|
|
|
Work hasn't begun.
|
General Inspection | 6/27/2018 | 6/27/2018 | 6/27/2018 | | PASS |
Michael Zawacki
|
|
|
No ground disturbance. Lot is surveyed and painted for excavation.
|
Site Preparation | 6/8/2018 | 6/8/2018 | 6/11/2018 | P | PASS |
Andy J. Long
|
|
|
RP on site with ESC plan. Will use Suez pump station driveway for bathroom and some material staging. Wattle to be installed along Hill Road to capture runoff. RP to have excavator move dirt from foundation to make a berm to divert run on to Collister rather than through site.
RP request WUI firewise seed mix information.
|
General Inspection | 2/18/2019 | 2/18/2019 | | | |
Andy J. Long
|
|
|
|