Site Final | 11/29/2019 | 12/13/2019 | 12/16/2019 | P | PASS |
Michael Zawacki
|
|
|
WIP on last home, neighborhood bmps removed.
|
General Inspection | 11/28/2019 | 11/28/2019 | 11/29/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/28/2019 | 10/28/2019 | 10/28/2019 | | PASS |
Michael Zawacki
|
|
|
One vacant lot left in development. Debris and landscape material have been dumped on lot, also looks like some dumped stucco.
|
General Inspection | 9/27/2019 | 9/27/2019 | 9/27/2019 | P | PASS |
Michael Zawacki
|
|
|
WIP on two homes, 1 vacant lot. Site is clean and mostly complete. No esc issues.
|
General Inspection | 9/5/2019 | 9/5/2019 | 9/6/2019 | | PASS |
Michael Zawacki
|
|
|
One empty lot and two homes under construction. No ESC issues on site. Neighbor complaint of drainage into their yard was refered to engineering.
|
Site Final | 8/2/2019 | 8/5/2019 | 8/5/2019 | P | NR |
Michael Zawacki
|
|
|
WIP on multiple SFH. One vacant lot still in development.
|
General Inspection | 7/29/2019 | 7/29/2019 | 7/29/2019 | | PASS |
Michael Zawacki
|
|
|
WIP on last few homes. Area is clean.
|
General Inspection | 6/26/2019 | 6/26/2019 | 6/26/2019 | P | PASS |
Michael Zawacki
|
|
|
WIP on last remaining homes. Some lumber scraps laying around. Road is clean, no issues at home sites.
|
General Inspection | 5/27/2019 | 5/27/2019 | 5/28/2019 | | PASS |
Andy J. Long
|
|
|
4 or 5 lots left. No violations observed. Approved.
|
Complaint Inspection | 4/26/2019 | 4/26/2019 | 4/26/2019 | P | DONE |
Michael Zawacki
|
|
|
Met with neighbors. They will forward pictures of problem. Looks like backyard grade goes to and drains onto their driveway.
|
General Inspection | 4/19/2019 | 4/19/2019 | 4/19/2019 | | PASS |
Andy J. Long
|
|
|
SFHs in progress. No dumped washout, trackout, or other issues observed. Couple open lots left.
|
General Inspection | 3/19/2019 | 3/19/2019 | 3/19/2019 | P | PART |
Michael Zawacki
|
|
|
Some lots need improvement, sent messages to rps. Sunroc on site pouring into pump truck. Did not see washout sent RP an alert and will follow up.
|
General Inspection | 3/4/2019 | 3/4/2019 | 3/4/2019 | | PASS |
Michael Zawacki
|
|
|
Site is clean, no one driving or parking on muddy lots. All homes under construction are framed. No foundation work at this time.
|
General Inspection | 2/1/2019 | 2/1/2019 | 2/1/2019 | P | PART |
Michael Zawacki
|
|
|
Some dumped stucco needs to be cleaned. Tile guy has truck and trailer parked on frozen mud, asked him to move before thaw. Met with building foreman while on site, says hes been on the guys to keep it clean.
|
General Inspection | 1/4/2019 | 1/7/2019 | 1/7/2019 | P | PASS |
Michael Zawacki
|
|
|
Site is clean. No dumped washout, kiddie pool washout has been used. Homes have their own trash containers, no blowing trash. All workers parking on street, no trackout.
|
General Inspection | 1/2/2019 | 1/2/2019 | 1/4/2019 | | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 11/30/2018 | 11/30/2018 | 11/30/2018 | P | FAIL |
Michael Zawacki
|
|
|
Washout has been dumped on ground between lot 6 & 7. Multiple builders working in sub, contacting site developer.
|
General Inspection | 11/5/2018 | 11/5/2018 | 11/5/2018 | | PART |
Michael Zawacki
|
|
|
Home construction has begun. Multiple builders on development. Unlined washout on one vacant lot. Didn't see any other washout on site. One foundation looks like they pumped all extram mud into crawl space.
|
General Inspection | 10/3/2018 | 10/3/2018 | 10/3/2018 | | PASS |
Michael Zawacki
|
|
|
Landscaping along Pierce Park and along fence line complete. Lots are all marked for sale, no building activity.
|
Random Inspection | 8/29/2018 | 8/29/2018 | 8/29/2018 | A | PASS |
Andy J. Long
|
|
|
Subdivision private drive (Glencrest) and entry to Pierce Park is complete. Stormwater will flow west to an onsite sand window infiltration bed. Will need to protect during home building. No SFHs yet. Irrigation ditches through site have been placed underground. WIP on landscaping and tree installation.
|
General Inspection | 8/17/2018 | 8/17/2018 | 8/17/2018 | P | PASS |
Michael Zawacki
|
|
|
Landscapers planting trees along south east fence line. No new dirtwork or starting of any homes.
|
General Inspection | 7/30/2018 | 7/30/2018 | 7/30/2018 | P | PASS |
Michael Zawacki
|
|
|
Some utility work at front of site. No new activity n site. No equipment or materials on site. No fugitive dust or material leaving site.
|
Complaint Inspection | 7/20/2018 | 7/20/2018 | 7/20/2018 | P | PEND |
Andy J. Long
|
|
|
No issues on permited site. Crew working on gas line on Pierce Park in front of site. Work is almost complete and crews were sweeping up loose dirt. Some localized dust, but not excessive. Work to be completed today.
|
Complaint Inspection | 7/20/2018 | 7/20/2018 | 7/20/2018 | P | CANC |
Andy J. Long
|
|
|
|
Complaint Inspection | 7/20/2018 | 7/20/2018 | 7/20/2018 | P | CANC |
Andy J. Long
|
|
|
|
Random Inspection | 6/1/2018 | 6/1/2018 | 6/1/2018 | P | PASS |
Andy J. Long
|
|
|
Installing curbing and prepping road for paving. No trackout or fugitive dust observed.
|
General Inspection | 5/17/2018 | 5/17/2018 | 5/17/2018 | P | PASS |
Michael Zawacki
|
|
|
Crew on site installing forms for sidewalks. Curbing in place, no concrete washout on site, no signs of washout dumped on ground. No ESC issues, site is dry.
|
General Inspection | 1/5/2018 | 1/5/2018 | 1/5/2018 | P | PASS |
Michael Zawacki
|
|
|
No workers on site. Site is frozen and hasn't been worked on since snowfall, 14 days. A few large dirt stockpiles on site.
|
General Inspection | 11/7/2017 | 11/7/2017 | 11/7/2017 | P | PASS |
Michael Zawacki
|
|
|
Done with sewer and dewatering. Still lots of silt in ditch. No new dirt issues. No trackpout and perimeters are contained.
|
General Inspection | 10/31/2017 | 10/31/2017 | 10/31/2017 | A | PASS |
Andy J. Long
|
|
|
Dewatering follow up.
Water from trenching is remaining onsite for infiltration. A ditch has been extended along the west and north site perimeter.
Will need to continue to extend ditch for more capacity.
No offsite discharges or trackout.
|
BMP Violation | 10/27/2017 | 10/30/2017 | 10/30/2017 | A | PEND |
Andy J. Long
|
|
|
SWO removed. Onsite retention and infiltration pond set up instead of discharging offsite to irrigation ditch. No discharge offsite is allowed.
|
Stop Work Order | 10/27/2017 | 10/27/2017 | 10/27/2017 | P | FAIL |
Andy J. Long
|
|
|
Effective 5 PM due to ineffective attempts to install dewatering treatment BMPs. Turbid discharge flowing north to Spoil Bank canal, which is flowing. Turbid discharge plume extends to west of Gary Lane.
Investigation fees and re-inspection fee to be issued.
|
Site Preparation | 10/27/2017 | 10/27/2017 | 10/27/2017 | A | FAIL |
Andy J. Long
|
|
|
10:45 AM site walk through
Dewatering discharge still turbid. Investigation pending. Some minor corrections accomplished at site. Construction entrance and permit sign posted, permit now active.
SWO issued, effective 5 PM friday 10/27. No work over weekend; more BMPs to be provided and another site preparation. Re-inspection and investigation fees to apply. Approximately, over 2 hours spent investigating and making corrections by both ESC inspectors.
|