Information based on query as of Wednesday, May 8, 2024.
Permit Information
Permit NumberELE18-01391
StatusFinaled
Name LEA ELECTRIC LLC
Site Address 305 E JEFFERSON ST
Project Name 
Customer Number3743
ePlanReviewNo
Description
New: Full Electrical installation in Children''s Pavilion TI, including conduit, wiring, switches, receptacles, lights, lighting control, fire alarm, and telecommunications
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final5/17/20195/20/20195/20/2019APASS
DetailsJames Ady
Level 4 skybridge installation west side. Phone #: ###-#### Inspection requested via web by Tom Betty No sign off sheet onsite final ok
Final5/7/20195/8/20195/8/2019APART
DetailsJames Ady
Contact Scott for level 1 final inspection of appliances. Phone #: ###-#### Inspection requested via web by Tom Betty Kitchen area final ok
Final4/26/20194/26/20194/26/2019PPART
DetailsRock A. Hudson
Contact Scott Grisbaum for final inspection on level 4. Phone #: ###-#### Inspection requested via web by Tom Betty
All items from 4-23-19 exept kitchen completed, Level 2, 3, 4, procedure lights, rm 268 GFCI protection, Damaged circuits 4NLF 24,26. TCO for these areas ok
Final4/22/20194/23/20194/23/2019PPART
DetailsJames Ady
Finalize levels 1 and 2. Phone #: ###-#### Inspection requested via web by Tom Betty Area requested not accurate. Level 2 corrections made. Level 4 Circuits 4NLF 24,26 damaged. Room 268 Receps within 6ft of sink need GFCI protection. Level 5 lobby ready for final. Rooftop patio and Heat trace ok. Note: Items needed for final are, Level 1 kitchen, Level 2 Procedure lights, Level 3 procedure lights,Level 4 Circuits 4NLF 24,26 repair, Rm 268 GFCI protection, Procedure lights.
Electrical Rough-In4/18/20194/18/20194/18/2019PPASS
DetailsJames Ady
Final above ceiling on level 4 and level 5 east stairwell. Phone #: ###-#### Inspection requested via web by Tom Betty Area listed ok to cover
Electrical Rough-In4/16/20194/16/20194/16/2019PPASS
DetailsJames Ady
Contact Scott for level 5 west elevator lobby above ceiling inspection. Phone #: ###-#### Inspection requested via web by Tom Betty 5th floor lobby ceiling only ok to cover
Final4/11/20194/12/20194/12/2019PPART
DetailsJames Ady
Levels 2 and 3 final inspections. Phone #: ###-#### Inspection requested via web by Tom Betty 3rd floor SE breakroom disp.cord, Janitorial closet gfcis, 2nd floor nurse call Circuit 2NLF-26,28. partial final of 2nd and 3rd floor ok
Electrical Rough-In4/9/20194/9/20194/9/2019PPASS
DetailsEric Story
Level 4 area C millwork rough in. Possibly the skybridge above the ceiling rough in. Phone #: ###-#### Inspection requested via web by Tom Betty
Level 4 conference room suspended ceiling and mill work for reception desk ok to cover
Electrical Rough-In4/3/20194/4/20194/4/2019APART
DetailsJames Ady
Level 4 casework rough in all of level4. Phone #: ###-#### Inspection requested via web by Tom Betty NE nurse call not ready. All others ok to cover
Final4/1/20194/1/20194/1/2019PPART
DetailsJames Ady
Contact Scott for Level 1, LL1 and LL3 walk down final inspection for all excluding electrical rooms on each floor and the parking on level 1. Phone #: ###-#### Inspection requested via web by Tom Betty 210.63 Heating and air conditioning equipment outlet. Recep shall be within 25ft of mini split condensor unit. Child care area needs recep trimmed. Kitchen needs GFCI protection and appliances installed. Faculty room checked and waiting for cubicals. All other areas checked and ready for final
Final3/29/20193/29/20193/29/2019PPART
DetailsJames Ady
Inspect Lower Level 2 only for final completion. Phone #: ###-#### Inspection requested via web by Tom Betty Service recep covered by water tank in domestic water room. LL2 Checked Partial final ok
Electrical Rough-In3/29/20193/29/20193/29/2019PPASS
DetailsJames Ady
Inspect above ceiling level 4 area C. Phone #: ###-#### Inspection requested via web by Tom Betty Area listed Ceiling only ok to cover
Electrical Rough-In3/28/20193/28/20193/28/2019PPASS
DetailsJames Ady
Level 4 above ceiling inspection. Gridlines inspected to be determined. Phone #: ###-#### Inspection requested via web by Tom Betty To grid line 9. Areas marked on print left with Scott. Ceiling only ok to cover
Electrical Rough-In3/25/20193/25/20193/25/2019PPASS
DetailsJames Ady
Level 3 area C above ceiling rough in and staff work station cabinetry rough in. Phone #: ###-#### Inspection requested via web by Tom Betty Corrections made areas listed ok to cover
Electrical Rough-In3/21/20193/22/20193/22/2019AFAIL
DetailsDaryl DeGrange
Contact Tony for level 3 area C above ceiling and casework. Phone #: ###-#### Inspection requested via web by Tom Betty NEC 330.12(1) MC cable shall not be installed where subject to physical damage. Raceway shall not be supported by luminair seismic wire.
Electrical Rough-In3/18/20193/18/20193/18/2019PPASS
DetailsJames Ady
Level 4 area A hard lid ceiling cover inspection needed. Phone #: ###-#### Inspection requested via web by Tom Betty Hard lid in area A only. (Next to elevator lobby) ok to cover
Electrical Rough-In3/16/20193/18/20193/18/2019ANH
DetailsRock A. Hudson
level 4 area A hard lid rough in. Phone #: ###-#### Inspection requested via web by Tom Betty
Called contact, no answer, left message.
Electrical Rough-In3/8/20193/8/20193/8/2019PPASS
DetailsJames Ady
Inspect level 2 area C above ceiling. Phone #: ###-#### Inspection requested via web by Tom Betty Area C Ceiling and nurse call station walls ok to cover
Electrical Rough-In3/6/20193/7/20193/7/2019PPASS
DetailsJames Ady
Contact Scott for level 3 above ceiling rough in. Phone #: ###-#### Inspection requested via web by Tom Betty 3rd floor Ceiling up to column line 7. East stair case 1st floor to LL3.(Walls were covered prior to inspection)
Electrical Rough-In3/5/20193/6/20193/6/2019APASS
DetailsRock A. Hudson
East stairwell rough in all levels. Phone #: ###-#### Inspection requested via web by Tom Betty
Area noted walls rough in ok cover
Electrical Rough-In2/28/20193/1/20193/1/2019APASS
DetailsJames Ady
Level 3 staff work station cabinet rough in. Phone #: ###-#### Inspection requested via web by Tom Betty Walked through penthouse. Will recheck when elevator lobby and Rooftop condensor units are finished. Check grounding electrode conduit from transformer. Needs to be bonded at both ends as per 250.64E. 3rd floor nurse call stations ok to cover
Electrical Rough-In2/26/20192/26/20192/26/2019PPASS
DetailsJames Ady
Contact Scott for level 5 west elevator lobby wall rough in. Phone #: ###-#### Inspection requested via web by Tom Betty 5th floor West side walls only ok to cover
Electrical Rough-In2/22/20192/25/20192/25/2019APASS
DetailsJames Ady
Contact Scott for level 4 east exhaust shaft area walls. Phone #: ###-#### Inspection requested via web by Tom Betty Area listed walls only ok to cover
Electrical Rough-In2/20/20192/20/20192/20/2019PPASS
DetailsJames Ady
Contact Scott for Level 4 area C. Level 4 east and west duct shaft walls and level 2 area B above ceiling. Phone #: ###-#### Inspection requested via web by Tom Betty Level 4 area C, Level 4 E and W shaft walls and Drinking fountain wall. 2nd floor ceiling up to coulumn line 8
Electrical Rough-In2/15/20192/15/20192/15/2019PPASS
DetailsJames Ady
Contact Scott for level 3 area C wall rough in. Also level 2 area A above ceiling sign off. Phone #: ###-#### Inspection requested via web by Tom Betty Areas listed ok to cover
Electrical Rough-In2/13/20192/13/20192/13/2019PPASS
DetailsJames Ady
Contact Scott for emergency feeder in existing hospital. Heat trace on sewage ejection pipe in Pavilion. Phone #: ###-#### Inspection requested via web by Tom Betty Areas listed ok to cover
Electrical Rough-In2/8/20192/11/20192/11/2019APASS
DetailsJames Ady
Contact Scott for level 1 entry canopy, level 2 far east end walls and level 2 staff work areas furniture. Phone #: ###-#### Inspection requested via web by Tom Betty Area listed ok to cover.
Electrical Rough-In1/30/20191/30/20191/30/2019PPASS
DetailsRock A. Hudson
Contact Scott for level 2 staff cabinetry, levels 2 and 3 drinking fountains, east stairwell partial walls. Phone #: ###-#### Inspection requested via web by Tom Betty
Areas noted walls with addition of level 2 scale room 2CH202 wall rough in ok cover
Electrical Rough-In1/21/20191/22/20191/22/2019PPASS
DetailsJames Ady
Contact Scott for level 4 north and south wall rough in. Phone #: ###-#### Inspection requested via web by Tom Betty N and S exterior walls as maeked on print ok to cover walls only
Electrical Rough-In1/17/20191/17/20191/17/2019PPART
DetailsJames Ady
Contact Scott for level 4 area C. Part of east stairwell rough in walls. View fire smoke damper motor locations on level 2 east duct shaft for clearances. Phone #: ###-#### Inspection requested via web by Tom Betty Remaning portion of area C only Walls ok to cover. recall shaft and stairwell
Electrical Rough-In1/11/20191/14/20191/14/2019APART
DetailsJames Ady
West stairwell wall and ceiling rough in and Level 4 area C wall rough in. Phone #: ###-#### Inspection requested via web by Tom Betty Partial rough in of area C as marked on print and all West end stairway
Electrical Rough-In12/28/20181/2/20191/2/2019APASS
DetailsJames Ady
Contact Scott for level 4 area B wall rough in inspection. Phone #: ###-#### Inspection requested via web by Tom Betty Level 4 area B interior walls ok. 1st floor ceiling ok. Note:Level 4, some walls near area A had been 1 sided. Let forman know not to do anymore before inspection.
Electrical Rough-In12/21/201812/27/201812/27/2018PPASS
DetailsJames Ady
Level 2 west HVAC shaft walls, level 3 west hardlid by stairs, East HVAC shaft walls, north corridor and east point of care. Phone #: ###-#### Inspection requested via web by Tom Betty Areas listed ok to cover plus level 4 Electrical room entry wall. ok to cover
Electrical Rough-In12/10/201812/10/201812/10/2018PPASS
DetailsJames Ady
Above ceiling level 1 parking area rough in and level 4 area A wall rough ins. Phone #: ###-#### Inspection requested via web by Tom Betty level 1 parking ceiling. access areas have been marked. level 4 area A. from West staircase to column line 3 interior walls only ok to cover N and S exterior walls not ready
Permanent Service12/7/201812/10/201812/10/2018APASS
DetailsJames Ady
Contact Tony Keen for Main Switchboard inspection. Phone #: ###-#### Inspection requested via web by Tom Betty p/s u/g n ok
Rough-In Permanent Service12/6/201812/6/201812/6/2018ACANC
DetailsJames Ady
Call Tony Keen for utility transformer secondary terminations and Main Switchboard main breaker terminations. Phone #: ###-#### Inspection requested via web by Tom Betty
Electrical Rough-In12/6/201812/6/201812/6/2018PPASS
DetailsJames Ady
Call Tony Keen for utility transformer secondary terminations and Main Switchboard main breaker terminations. Phone #: ###-#### Inspection requested via web by Tom Betty Connections at Transformer Secondary and main disconnect ok.. (230.95C Performance testing needed) (110.24A Available fault current needed)
Conference11/29/201811/29/201811/29/2018ADONE
DetailsJames Ady
Contact Tony Keen for conference on designed Fire Pump Disconnect means. Idaho power has deemed the utility service as reliable with no sustained power outages greater than 5 minutes since 2014. Phone #: ###-#### Inspection requested via web by Tom Betty Discussed exceptions to allow Disconnect ahead of Fire Pump Control. Will allow as long as Overcurrent in Disc is Indefinite and monitoring is installed.
Electrical Rough-In11/15/201811/16/201811/16/2018PPASS
DetailsJames Ady
Contact Scott Grisbaum for level 3 area C wall cover inspection. Phone #: ###-#### Inspection requested via web by Tom Betty level 3 area C walls only as marked on print ok to cover
Conference11/7/201811/7/201811/7/2018PDONE
DetailsJames Ady
Call Scott for ceiling on ramp from level 1 to LL1. Rough in wall on L1 south of west elevator. Inspect grounding electrode system. Phone #: ###-#### Inspection requested via web by Tom Betty Discussed boding of Gas line.(Do not install as per. Daryl D.) Disc. ahead of fire pump controller will make it an Unreliable power source as Per NFPA 20.(will check with engineer)
Electrical Rough-In11/6/201811/7/201811/7/2018PPASS
DetailsJames Ady
Call Scott for ceiling on ramp from level 1 to LL1. Rough in wall on L1 south of west elevator. Inspect grounding electrode system. Phone #: ###-#### Inspection requested via web by Tom Betty Areas listed ok to cover.
Electrical Rough-In10/30/201810/31/201810/31/2018APASS
DetailsJames Ady
Call Scott for LL1 basement ceiling rough in. Phone #: ###-#### Inspection requested via web by Tom Betty Lower level ceiling only ok to cover
Electrical Rough-In10/29/201810/30/201810/30/2018PPASS
DetailsJames Ady
Contact Scott Grisbaum for level 3 area B wall rough in. Phone #: ###-#### Inspection requested via web by Tom Betty Area marked on print ok to cover
Electrical Rough-In10/23/201810/24/201810/24/2018APASS
DetailsJames Ady
Call Scott for level 3 therapist work room rough in walls inspection. Phone #: ###-#### Inspection requested via web by Tom Betty As marked on print ok to cover
Electrical Rough-In10/16/201810/17/201810/17/2018PPASS
DetailsJames Ady
Rough in wall inspection level 3 area A. Phone #: ###-#### Inspection requested via web by Tom Betty Area "A" walls only As marked on print ok to cover
Electrical Rough-In10/5/201810/10/201810/10/2018PPASS
DetailsJames Ady
Contact Scott Grisbaum for level 2 alcove lighting rough in. Phone #: ###-#### Inspection requested via web by Tom Betty Cove lighting will be low voltage cut ins with remote drivers. Cove lids ok to cover
Electrical Rough-In10/5/201810/9/201810/9/2018PPASS
DetailsJames Ady
Contact Scott for level 5 roof parapet wall rough in. Phone #: ###-#### Inspection requested via web by Tom Betty Rough in walls only ok to cover
Electrical Rough-In9/13/20189/18/20189/18/2018PPASS
DetailsJames Ady
Contact Scott for level 2 area C rough in wall inspection. Phone #: ###-#### Inspection requested via web by Tom Betty Area C as marked on print walls only ok to cover
Electrical Rough-In8/30/20189/5/20189/5/2018PPASS
DetailsJames Ady
Call Scott Grisbaum for level 2 area B wall rough in. Phone #: ###-#### Inspection requested via web by Tom Betty Area "B" walls only ok to cover
Electrical Rough-In8/23/20188/27/20188/27/2018PPASS
DetailsJames Ady
Contact Tony for level 2 area a wall rough in. Phone #: ###-#### Inspection requested via web by Tom Betty Area listed and marked on print
Electrical Rough-In8/14/20188/16/20188/16/2018APASS
DetailsJames Ady
Call Tony for level 1 area''s a and b wall rough in inspection. Phone #: ###-#### Inspection requested via web by Tom Betty Levels listed and marked on print walls only ok to cover
Electrical Rough-In8/9/20188/9/20188/9/2018ACANC
DetailsJames Ady
Call Tony for Level 1 wall rough in review. Phone #: ###-#### Inspection requested via web by Tom Betty
Conference8/9/20188/9/20188/9/2018PDONE
DetailsJames Ady
Call Tony for Level 1 wall rough in review. Phone #: ###-#### Inspection requested via web by Tom Betty Discussed termination of redundant ground in connectors.(Waiting on documentation from manufacturer) Discussed conduit supports from cupplings and connectors.(358.30A Ex 1. Fastening shall be permited to be increased to 5ft where Structure does not permit 3ft) Support does not need to be within 5ft of coupling, just within 10 ft of last support as exhibit 358.1 of the 2017 NEC hand book describes.