Permit Information
Permit NumberESC17-00836
StatusFinaled
Name MIKE WINKLE
Site Address 416 W SHERMAN ST
Project Name 
Customer Number 
ePlanReviewNo
Description
As per ESC Conditions and BMPs set up per ESC site plan. Wattles to be installed along front bank. Area where grassy swale will be should be constructed early in project to have onsite retention. Stabilized construction entrancne and gravel bag sediment checks in gutter in front of site. Site preparation inspection is required.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection6/21/20196/21/20196/21/2019 PASS
DetailsAndy J. Long
Site is vegetated. Okay for perimeter wattle to remain installed.
DOC - Permit Finaled6/21/20196/21/20196/21/2019PPASS
DetailsAndy J. Long
Site Final6/6/20196/6/20196/10/2019PPASS
DetailsMichael Zawacki
General Inspection6/6/20196/6/20196/6/2019 CANC
DetailsAndy J. Long
General Inspection5/22/20195/22/20195/23/2019 CANC
DetailsAndy J. Long
General Inspection5/7/20195/7/20195/7/2019 PASS
DetailsMichael Zawacki
No activity, for sale signs still up. Wattle along bottom still in place, weeds starting to grow.
General Inspection4/22/20194/22/20194/22/2019 PASS
DetailsMichael Zawacki
Wattle still at bottom of hill, starting to wear out. May be new home on lot soon.
General Inspection4/5/20194/5/20194/5/2019 PASS
DetailsAndy J. Long
General Inspection3/21/20193/21/20193/21/2019 PASS
DetailsMichael Zawacki
For sale sign in front of lot. Wattle still at bottom of hill, no dirt leaving site.
General Inspection3/6/20193/6/20193/6/2019 PASS
DetailsMichael Zawacki
No dirt leaving site, wattle is getting worn.
General Inspection2/19/20192/19/20192/19/2019 CANC
DetailsAndy J. Long
Site Final2/4/20192/4/20192/5/2019PNR
DetailsAndy J. Long
This permit is open for adjacent lot 420 Sherman that was accessed during project and had erosion issues. This lot had plan under review but is now again expired. Will continue to monitor.
General Inspection2/4/20192/4/20192/4/2019 CANC
DetailsAndy J. Long
General Inspection1/18/20191/18/20191/18/2019 CANC
DetailsAndy J. Long
General Inspection1/1/20191/1/20191/2/2019 CANC
DetailsAndy J. Long
General Inspection12/14/201812/14/201812/14/2018 PASS
DetailsAndy J. Long
General Inspection11/29/201811/29/201811/29/2018 PASS
DetailsAndy J. Long
General Inspection11/14/201811/14/201811/14/2018 CANC
DetailsAndy J. Long
General Inspection10/30/201810/30/201811/1/2018 CANC
DetailsAndy J. Long
General Inspection10/15/201810/15/201810/15/2018 CANC
DetailsAndy J. Long
General Inspection9/28/20189/28/20189/28/2018 PASS
DetailsAndy J. Long
Vacant lot is still not occupied. Wattle is installed. Disturbed bank has vegetated slightly. Will continue to monitor.
General Inspection9/13/20189/13/20189/13/2018 CANC
DetailsAndy J. Long
General Inspection8/29/20188/29/20188/30/2018 PASS
DetailsMichael Zawacki
Wattle at bottom of drive. Site has been graded to hold water in middle of vacant lot.
General Inspection8/14/20188/14/20188/14/2018 CANC
DetailsAndy J. Long
General Inspection7/30/20187/30/20187/30/2018 PEND
DetailsAndy J. Long
adjacent lot revegetation monitoring
General Inspection7/13/20187/13/20187/13/2018 PASS
DetailsMichael Zawacki
No runoff from side access. Will monitor until owner starts new home on lot or is stable.
Site Final6/21/20186/28/20186/27/2018PCANC
DetailsAndy J. Long
General Inspection6/26/20186/26/20186/26/2018PPASS
DetailsAndy J. Long
Wattles installed on disturbed slope on adjacent lots. Will keep open for monitoring. No violations observed. Construction is complete
Site Final6/20/20186/20/20186/21/2018PCANC
DetailsAndy J. Long
Site Final6/21/20186/21/20186/21/2018ANR
DetailsAndy J. Long
Correction request:

- install sediment control wattle on the lot downhill from home on Sherman that was used for site access & staging and accidental water line break.

Discussed with RP Mike. Follow up scheduled for next week.
General Inspection6/12/20186/12/20186/12/2018PPASS
DetailsMichael Zawacki
Home and landscaping complete. Building permit closed. Adajacent lot exposed, not owned by developer but used to access site. Will monitor, driveway cut in and silt fence still installed.
Random Inspection5/31/20185/31/20185/31/2018PPASS
DetailsMichael Zawacki
Rock Placing Company on site. No ESC issues.
General Inspection5/29/20185/29/20185/29/2018PPASS
DetailsAndy J. Long
WIP on interior. No landscaping or stabilization yet. No issues with adjacent lot, some vegetation has started to cover the disturbed area. No correction requested
General Inspection5/22/20185/22/20185/29/2018 CANC
DetailsAndy J. Long
General Inspection4/12/20184/16/20184/16/2018APART
DetailsMichael Zawacki
Dirt is cleaned of of road and curb. No wattle has been installed at toe of slope.
General Inspection4/12/20184/12/20184/12/2018PFAIL
DetailsAndy J. Long
Correction requests:

- clean dirt accumulated on curb on adjacent site due to the water line break
- install wattle at toe of slope of side house access drive leading from driveway to slow runoff and capture sediment before leaving site.

Re-inspection Monday.
BMP Violation3/30/20184/2/20184/6/2018APEND
DetailsAndy J. Long
Complaint Inspection2/28/20182/28/20182/28/2018PPASS
DetailsMichael Zawacki
Someone hit a water line. Lots of dirt slid and flowed on Sherman. Talked to Mikw with Syringa and said he will come out. Will follow up on clean up. They are waiting for excavator to arrive so they can scrape up dirt.
Random Inspection11/22/201711/22/201711/22/2017PPASS
DetailsMichael Zawacki
Random Inspection11/9/201711/9/201711/9/2017PPASS
DetailsMichael Zawacki
Foundation started. Washout hauled away like contractor asked for.
Site Preparation11/6/201711/6/201711/6/2017PPASS
DetailsMichael Zawacki
MIke Phone #: ###-####
Wattle and silt fence on perimeter. Will have washout hauled out by cement company. Expects to have foundation done quick and backfill in.