Information based on query as of Monday, May 13, 2024.
Permit Information
Permit NumberESC18-00177
StatusFinaled
Name JASON JONES
Site Address 2980 S MILLBROOK WAY
Project NameDallas Harris Estates TH 7
Customer Number 
ePlanReviewNo
Description
16 lot multi-family residential subdivision
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final4/20/20204/21/20204/21/2020PPASS
DetailsAndy J. Long
Homes now in progress and permitted seperately. Blackrock will remove DI bags at end of construction of townhomes

No ESC corrections. Adjacent subdivision phases have their own permits, see ESC19-00584.

This permit finaled.
General Inspection4/20/20204/20/20204/20/2020 CANC
DetailsAndy J. Long
General Inspection3/3/20203/3/20203/3/2020PPASS
DetailsMichael Zawacki
All foundations, roads, sidewalks and curbing completed. No framing in site, all work is on perimeter homes and 4-plexes. No trash blown into creek, site is clean.
General Inspection1/28/20201/28/20201/29/2020 PASS
DetailsMichael Zawacki
WIP on multiple 4-plexes. Site is being kept clean, no wind blown trash or tracking.
General Inspection12/13/201912/13/201912/13/2019PPASS
DetailsMichael Zawacki
All foundations poured. Site is clean. Building work is going from west to east.
General Inspection11/1/201911/1/201911/4/2019 PASS
DetailsMichael Zawacki
WIP on both framing and foundations.
Lined concrete washout on site and in use.
Trash contractor on site clearing trash boxes. Site is clean in regards to trash.
Lots of dirt tracked inside site, none leaving.
Silt fence/ trash fence protecting creek.
General Inspection9/16/20199/16/20199/17/2019 PASS
DetailsAndy J. Long
General Inspection7/30/20197/30/20197/31/2019 PASS
DetailsMichael Zawacki
Inlet protection has been installed on hopewell. Lumber has been deliverd and trash boxes built, no framing activity.
Grader is working on pad for new foundation, site still has washout.
General Inspection6/14/20196/14/20196/17/2019 PASS
DetailsMichael Zawacki
Foundations installed washout on site. Split rail fence installed, wind/trash fence not installed, no framing yet.
Pile of backfill along creek on southside is being removed.
General Inspection4/29/20194/29/20194/30/2019 PART
DetailsMichael Zawacki
Inlet protection needed inside Hopes Way alleys. Currently large buffer between work area and creek, creek is vegatated and has wattle along top. Workers are placing backfill in first batch of foundations. Sent message to RP to install drain inlet protection.
General Inspection3/12/20193/12/20193/19/2019 PEND
DetailsAndy J. Long
Perimeter controls at east end of development are installed. Grass is begninning to grow on slope near Warm Springs Creek.

Lots of wind blown trash. Need to work with Blackrock and Harris Ranch HOAs to get regular trash pick up in Warm Springs Creek.
General Inspection1/25/20191/25/20191/25/2019 PASS
DetailsMichael Zawacki
No new activity. All site prep is done.
General Inspection12/5/201812/5/201812/7/2018 PASS
DetailsMichael Zawacki
Site prep work complete, no new home activity.
General Inspection10/9/201810/11/201810/12/2018PPEND
DetailsAndy J. Long
follow up on wattles and trash in DHETH #8 / Parkcenter Blvd
General Inspection10/9/201810/9/201810/9/2018PPART
DetailsAndy J. Long
Wattles installed at east of DHETH No 8 at Warm Springs, but are not staked or overlapping. Lots of trash in creek where project occured.

Correction to RP & Knife River to pick up trash and re-install wattle properly.
General Inspection10/2/201810/2/201810/2/2018PPASS
DetailsAndy J. Long
WIP on foundations and some framing. Trash contained. Storm drains fitted with DI bags, lined concrete washout is onsite.
General Inspection8/14/20188/14/20188/14/2018PPASS
DetailsMichael Zawacki
Grading is complete, water and sewer lines installed. Park Center now has sidewalks and curbing, being prepped for paving. Landscapers on site installing sprinklers for right of way landscaping.
General Inspection6/14/20186/14/20186/14/2018PPASS
DetailsMichael Zawacki
Bringing in fill material and grading. Old creek channel has been filled. Water truck on site, no dust.
General Inspection5/30/20185/30/20185/30/2018PPASS
DetailsMichael Zawacki
Starting to remove vegetation and prep area to fill old creek channel. Water truck on site, no dust leaving site.
General Inspection5/21/20185/21/20185/21/2018PPASS
DetailsAndy J. Long
check on dewatering and creek opening..

WIP. Channel work occuring at south connection point @ Warm Springs bypass. Old channel has not yet been filled.

No discharges, trackout, or fugitive dust from site. Permits posted, construciton entrances installed.
General Inspection5/8/20185/22/20185/21/2018APASS
DetailsAndy J. Long
Channel realignment is in process of being opened up. Knife River working on project. Lining connection areas with geotextile and rip rap. Groundwater in channel is being pumped to the adjacent pasture to the west. No turbid discharges in construction areas. Knife River active on grading & fill for DHETH 6-7 and DHE #17 and 404 permits to fill in old channel have been approved and will occur this week and next.

When channel by Warm Springs bybass is opened, plan is to capture sediment laden water from first flush in basin south of road and north of Greenbelt and discharge w/ 2 " pump to the vegetated area west of the creek. Will follow up.
Random Inspection5/18/20185/18/20185/18/2018PPASS
DetailsMichael Zawacki
WIP on grading. Old warm springs creek is protected by siltfence. Channel has been cut diverting creek into new creek bed, no work on filling old creek has begun.
Site Preparation5/8/20185/8/20185/8/2018PPASS
DetailsAndy J. Long
pre-con meeting DHE townhomes # 7

Knife River is contractor (Rex ###-####), Riverridge engineering project design.

construction entrance on east end of project. Will protect Warm Springs creek channel with silt fence until 404 permit approval to fill the channel as planned.

Standard BMPs required: dust control, trackout prevention and sweeping, concrete washout facility, staging area with safe storage or materials and chemicals on site.

Requested that silt fence crew also pick up loose trash encountered in the area.