Site Final | 7/7/2020 | 7/8/2020 | 7/9/2020 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 7/6/2020 | 7/6/2020 | 7/7/2020 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
General Inspection | 6/19/2020 | 6/19/2020 | 6/19/2020 | | PASS |
Michael Zawacki
|
|
|
Lot is stable, still has wattles installed.
|
General Inspection | 6/4/2020 | 6/4/2020 | 6/4/2020 | | PASS |
Michael Zawacki
|
|
|
Good growth and coverage, wattles still installed.
|
General Inspection | 5/20/2020 | 5/20/2020 | 5/20/2020 | | PASS |
Michael Zawacki
|
|
|
Landscaped and growing, no issues, wattles still installed.
|
General Inspection | 5/5/2020 | 5/5/2020 | 5/5/2020 | | PASS |
Michael Zawacki
|
|
|
Area has been landscaped and hydroseeded. Gras starting to grow, wattles still installed.
|
General Inspection | 4/20/2020 | 4/20/2020 | 4/20/2020 | | PASS |
Michael Zawacki
|
|
|
Landscaping completed, area has been hydroseeded. Wattle still installed, will monitor for regrowth.
|
Site Final | 4/3/2020 | 4/3/2020 | 4/3/2020 | P | NR |
Michael Zawacki
|
|
|
Still working on landscaping, wattles on perimeter.
|
General Inspection | 4/3/2020 | 4/3/2020 | 4/3/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/19/2020 | 3/19/2020 | 3/19/2020 | | PASS |
Michael Zawacki
|
|
|
WIP on landscaping
|
General Inspection | 3/4/2020 | 3/4/2020 | 3/4/2020 | | PASS |
Michael Zawacki
|
|
|
Home completed, landscaping and revegetation in progress.
|
General Inspection | 2/18/2020 | 2/18/2020 | 2/19/2020 | | PASS |
Michael Zawacki
|
|
|
Work completed. Still needs landscaping.
|
General Inspection | 2/3/2020 | 2/3/2020 | 2/3/2020 | | PASS |
Michael Zawacki
|
|
|
No issues.
|
General Inspection | 1/17/2020 | 1/17/2020 | 1/17/2020 | | PASS |
Michael Zawacki
|
|
|
Still needs landscaping. Parking area on lot above is starting to thaw and get muddy.
|
General Inspection | 1/2/2020 | 1/2/2020 | 1/2/2020 | | PASS |
Michael Zawacki
|
|
|
Exterior and driveway completed. Still needs landscaping.
|
General Inspection | 12/18/2019 | 12/18/2019 | 12/19/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/3/2019 | 12/3/2019 | 12/3/2019 | | PASS |
Michael Zawacki
|
|
|
Site clean and contained.
|
General Inspection | 11/18/2019 | 11/18/2019 | 11/18/2019 | | PASS |
Michael Zawacki
|
|
|
Home exterior completed. Finishing on driveway and brick pavers. Most backfill has been used, still a small pile on site.
|
General Inspection | 11/1/2019 | 11/1/2019 | 11/1/2019 | | PASS |
Michael Zawacki
|
|
|
Lot is contained, no esc issues.
|
General Inspection | 10/17/2019 | 10/17/2019 | 10/17/2019 | P | PASS |
Michael Zawacki
|
|
|
WIP, lot contained.
|
General Inspection | 10/4/2019 | 10/4/2019 | 10/4/2019 | | PASS |
Michael Zawacki
|
|
|
Site is contained.
|
General Inspection | 9/19/2019 | 9/19/2019 | 9/19/2019 | | PASS |
Michael Zawacki
|
|
|
Site is clean and contained, still not stabilized.
|
General Inspection | 9/4/2019 | 9/4/2019 | 9/4/2019 | | PASS |
Michael Zawacki
|
|
|
Site is clean and contained. No landscaping.
|
General Inspection | 8/20/2019 | 8/20/2019 | 8/20/2019 | | PASS |
Michael Zawacki
|
|
|
WIP. Lot is still all disturbed and contained. No ESC issues.
|
General Inspection | 8/5/2019 | 8/5/2019 | 8/5/2019 | | PASS |
Michael Zawacki
|
|
|
Only outside work is masonary. Lot is still exposed and there is some backfill. No dust or esc issues, washouts for masons on site.
|
General Inspection | 7/19/2019 | 7/19/2019 | 7/19/2019 | | PASS |
Michael Zawacki
|
|
|
Home exterior completed. Lot is bare and contained.
|
General Inspection | 7/4/2019 | 7/4/2019 | 7/5/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/19/2019 | 6/19/2019 | 6/19/2019 | | PASS |
Michael Zawacki
|
|
|
WIP on home. Utility contractor on parkhill right in front of home. No dirt leaving site, entrance installed, trucks parked outside gate.
|
General Inspection | 6/4/2019 | 6/4/2019 | 6/4/2019 | | PASS |
Michael Zawacki
|
|
|
Site is clean and contained. Silt fence still installed on 15th.
|
General Inspection | 5/16/2019 | 5/16/2019 | 5/16/2019 | | PASS |
Andy J. Long
|
|
|
WIP. Permit posted. No trackout. Perimeter vegetation preserved. NO corrections needed.
|
General Inspection | 5/1/2019 | 5/1/2019 | 5/1/2019 | | PASS |
Michael Zawacki
|
|
|
Exterior nearly completed, mortar washout on site for mason. Large piles of backfill still on site.
|
General Inspection | 1/30/2019 | 1/30/2019 | 1/30/2019 | P | PASS |
Andy J. Long
|
|
|
WIP. Permit posted, construction entrance installed. Perimeter vegetation preserved. Approved.
|
General Inspection | 11/13/2018 | 11/13/2018 | 11/13/2018 | P | PASS |
Michael Zawacki
|
|
|
Old washouts have been cleaned and removed. Mason on site, has outpak for mortar.
|
General Inspection | 10/29/2018 | 10/29/2018 | 10/29/2018 | P | FAIL |
Michael Zawacki
|
|
|
3 washouts that have failed and leaked plus more washout just dumped on ground.
|
Random Inspection | 10/12/2018 | 10/12/2018 | 10/12/2018 | P | PART |
Michael Zawacki
|
|
|
Foundation poured, mini track steer on site. Some hauling, light trackout onto parkhill.
|
Complaint Inspection | 8/7/2018 | 8/7/2018 | 8/7/2018 | P | PEND |
Andy J. Long
|
|
|
Concern over parking for site employees. Street is narrow and curvy, which could limit visibility and access to homes further up. Will review a parking plan with RP. RP is to schedule onsite conference. Initial BMPs are already installed, but no excavation yet.
|
Site Preparation | 7/24/2018 | 7/25/2018 | 7/25/2018 | A | NR |
Andy J. Long
|
|
|
site prep; employee parking & staging complaint received...
home not yet under construction. Spoke with RP/GC Sean. Crew reported onsite may have been Idaho Power or other utilies. Project is in for plan modification. Will not start till later in August, RP will schedule site preparation inspection.
|