Routing - Design Review | 8/11/2020 | | 8/11/2020 | | PASS |
Katelyn Menuge
|
|
|
|
BLD-Final | 7/30/2020 | 7/30/2020 | 7/31/2020 | P | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Travis Blackburn//temp occ ok in all units except type A unit until grab bars are installed//fire tape area in fire riser room// all other signatures have been completed for temp occ//discussed handrails and code requirements, they will be fixed//
|
Temporary Occupancy | 7/31/2020 | 10/29/2020 | 7/31/2020 | | DONE |
Brittany Hill
|
|
|
|
FIRE-Final Inspection | 7/30/2020 | 7/30/2020 | 7/30/2020 | P | PART |
Troy Cobbley
|
|
|
A temp for life safety is being given until the permanant address is installed and the heater is installed in the third roof access rooms.
F/L/S final. Smokes added Phone #: ###-#### Inspection requested via web by Travis Blackburn
|
BLD-Final | 7/28/2020 | 7/29/2020 | 7/29/2020 | P | NR |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Travis Blackburn//need all signatures, walked 1 and 2 floors, need to finish rooms, typa A room not complete, still need to walk 3rd floor//
|
FIRE-Final Inspection | 7/28/2020 | 7/29/2020 | 7/29/2020 | A | FAIL |
Troy Cobbley
|
|
|
Today turn into a conference. It appears that a smoke alarm was deleted in the three bedroom units which is actually required to be installed. Inspection was stopped and we conferenced about it.
Fire Life Safety inspection Phone #: ###-#### Inspection requested via web by Travis Blackburn
|
Zoning Approval Temp | 7/29/2020 | 7/29/2020 | 7/29/2020 | | DONE |
Josh Wilson
|
|
|
OK 90 day temporary occupancy
|
FIRE-Conference | 7/17/2020 | 7/20/2020 | 7/20/2020 | P | DONE |
Troy Cobbley
|
|
|
I went over life safety requirements to begin the building sign offs. The biggerst issue is the need to submit to Joe Bruce temp fire dept access plans for approval.
Phone #: ###-#### Inspection requested via web by Lee Scott
|
BLD-Wall Bracing | 6/8/2020 | 6/8/2020 | 6/8/2020 | P | PASS |
Tell Riley
|
|
|
INspection for additional floor to floor straps and hold downs add afterwards Phone #: ###-#### Inspection requested via web by Travis Blackburn//added hold downs and floor to floor strapping--ok//
|
BLD-Wall cover | 5/7/2020 | 5/8/2020 | 5/8/2020 | A | CANC |
Mike Jordan
|
|
|
Drop ceiling on 1st floor for cover Phone #: ###-#### Inspection requested via web by Travis Blackburn. 1st and 2nd. floor drops ok.
|
BLD-Wall Bracing | 5/7/2020 | 5/8/2020 | 5/8/2020 | A | CANC |
Mike Jordan
|
|
|
Check interior gyp shear at all floors. Call Jeremy Smith ###-#### Phone #: ###-#### Inspection requested via web by Travis Blackburn. 1st, 2nd and 3rd floor interior shear ok.
|
BLD-Wall cover | 5/1/2020 | 5/4/2020 | 5/4/2020 | A | PART |
Tell Riley
|
|
|
Inspect 2nd floor drop ceilings Phone #: ###-#### Inspection requested via web by Travis Blackburn//2nd floor ok to cover when minor corrections, insulation added//
|
BLD-Wall cover | 4/30/2020 | 5/1/2020 | 5/1/2020 | A | PART |
Tell Riley
|
|
|
If time allows, cover inspection for drop ceilings on 3rd floor. Phone #: ###-#### Inspection requested via web by Travis Blackburn//Plumbing rough in has passed, other rough ins ok//drops on 3rd floor ok when areas around mechanical on exterior walls have been insulated//
|
BLD-Wall cover | 4/29/2020 | 4/30/2020 | 4/30/2020 | A | NR |
Tell Riley
|
|
|
Drop ceiling inspection for cover on 3rd floor and 2nd if time permits Phone #: ###-#### Inspection requested via web by Travis Blackburn//need to have plumbing inspections passed prior to inspection///
|
BLD-Framing/Rough-in | 4/29/2020 | 4/30/2020 | 4/30/2020 | A | PEND |
Tell Riley
|
|
|
Corridor reinspect for cover Phone #: ###-#### Inspection requested via web by Travis Blackburn//corridor corrections made//Fire sprinkler inspection failed, need to have approval for fire sprinklers prior to any cover//
|
BLD-Framing/Rough-in | 4/28/2020 | 4/29/2020 | 4/29/2020 | A | NR |
Tell Riley
|
|
|
Corridor inspection to be able to hang lids Phone #: ###-#### Inspection requested via web by Travis Blackburn//walkthrough on corridor framing--minor framing corrections, nails hangers, fire caulking, add lags as discussed//address stair stringer attachment as it differs from plan details///
|
BLD-Wall cover | 4/6/2020 | 4/7/2020 | 4/7/2020 | A | CANC |
Tell Riley
|
|
|
This is a cover inspection for drop ceilings in 3rd floor only! Phone #: ###-#### Inspection requested via web by Travis Blackburn//need to have plumbing letter approved prior to any inspection on this permit//
|
BLD-Conference | 4/1/2020 | 4/1/2020 | 4/1/2020 | P | DONE |
Tell Riley
|
|
|
conference with Matt, plumbing inspector, and Travis, discussed the need for the architect/engineer to sign off on plumbing as is prior to any other inspections//discussed the need for revised plumbing drawings for other buildings prior to plumbing inspection approval and or any cover//
|
BLD-Wall cover | 3/11/2020 | 3/12/2020 | 3/12/2020 | A | NR |
Tell Riley
|
|
|
Inspection for cover at 2 hr ceilings in stairwells Phone #: ###-#### Inspection requested via web by Travis Blackburn//need to fix a couple areas on shaft liner//
|
BLD-Wall cover | 3/10/2020 | 3/10/2020 | 3/10/2020 | P | PART |
Tell Riley
|
|
|
1st floor cover inspection on units only. Phone #: ###-#### Inspection requested via web by Travis Blackburn//1st floor ok to cover--energy ok//
|
BLD-Framing/Rough-in | 3/6/2020 | 3/9/2020 | 3/9/2020 | A | PART |
Tell Riley
|
|
|
Second reinspection for 1st floor of bldg B Phone #: ###-#### Inspection requested via web by Travis Blackburn//1st floor framing corrections made//call for energy//
|
BLD-Framing/Rough-in | 3/5/2020 | 3/6/2020 | 3/6/2020 | A | PART |
Tell Riley
|
|
|
Reinspection on first floor around 10 am would be preferred Phone #: ###-#### Inspection requested via web by Travis Blackburn//211 and 311 ok//others not ready corrections not made//rock wool at floor needs to be full depth//
|
BLD-Framing/Rough-in | 3/4/2020 | 3/5/2020 | 3/5/2020 | P | PART |
Tell Riley
|
|
|
Inspection for insulation on 1st floor needed. Nobody will be able to walk from 12-2. After 2 would be preferred. I would also like to inspect shaftliner assembly at top of stairways for cover. Phone #: ###-#### Inspection requested via web by Travis Blackburn//1st floor only//some framig corrections, fire caulking, and anchors bolts needed//still need fire blocking on separation walls//will call in for inspection of above//
|
BLD-Wall cover | 3/2/2020 | 3/3/2020 | 3/3/2020 | P | PASS |
Dave Hannah
|
|
|
2nd floor cover only except for the corridor and unit 211 Phone #: ###-#### Inspection requested via web by Travis Blackburn
|
BLD-Framing/Rough-in | 2/24/2020 | 2/26/2020 | 2/26/2020 | A | PART |
Tell Riley
|
|
|
INspection for 2nd floor approval to insulate walls and joists Phone #: ###-#### Inspection requested via web by Travis Blackburn//a couple joists need addressed//wrong hangers used for wide flange joists//will need to change and verify at insualtion inspection//ok to insulate only//
|
BLD-Framing/Rough-in | 2/13/2020 | 2/14/2020 | 2/14/2020 | A | PART |
Tell Riley
|
|
|
2nd floor inspection to allow insulation Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok// need to provide fix for the cut joists for plumbing//
|
BLD-Energy code compliance | 2/13/2020 | 2/14/2020 | 2/14/2020 | A | PART |
Tell Riley
|
|
|
3rd floor cover inspection again for units only after visqueen on the ceiling was installed except for unit 312 Phone #: ###-#### Inspection requested via web by Travis Blackburn//VB isntalled and secure to underside of ceiling//
|
BLD-Energy code compliance | 2/10/2020 | 2/11/2020 | 2/12/2020 | A | PART |
Tell Riley
|
|
|
Insulation approval for cover on 3rd floor only at units Phone #: ###-#### Inspection requested via web by Travis Blackburn//framing corrections made on third floor//insulation for unit fire separation ok per architect//third floor ok//
|
BLD-Framing/Rough-in | 2/5/2020 | 2/5/2020 | 2/5/2020 | P | PART |
Tell Riley
|
|
|
Looking for a framing inspection to insulate walls on 3rd floor only Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok to insulate 3rd floor only if plumbing is approved// finsish fire caulk penetrations// fix fire collars//add headers as noted//
|
BLD-Framing/Rough-in | 2/3/2020 | 2/3/2020 | 2/3/2020 | P | NR |
Tell Riley
|
|
|
Verify truss fixes and other misc. pre cover inspection items Phone #: ###-#### Inspection requested via web by Travis Blackburn//see truss engineering for fixes//
|
BLD-Other | 1/30/2020 | 1/30/2020 | 1/30/2020 | P | NR |
Jim Storey
|
|
|
Exteror 2hr sheetrock on stair walls first layer inspection and conference on assemblies for ga file wp 4136 and UL des U344 Phone #: ###-#### Inspection requested via web by Travis Blackburn
|
BLD-Framing/Rough-in | 1/22/2020 | 1/23/2020 | 1/23/2020 | P | PART |
Tell Riley
|
|
|
3rd floor inspection of trusses/hardware to start the process of inspections for cover Phone #: ###-#### Inspection requested via web by Travis Blackburn//need to add nails to hangers, fix hangers where noted are wrong, add studs at girder and uplift brackets//bracing ok//trusses only//
|
BLD-Framing/Rough-in | 1/22/2020 | 1/22/2020 | 1/23/2020 | P | CANC |
Tell Riley
|
|
|
3rd floor inspection of trusses/hardware to start the process of inspections for cover Phone #: ###-#### Inspection requested via web by Travis Blackburn
|
BLD-Framing/Rough-in | 1/10/2020 | 1/10/2020 | 1/10/2020 | P | PART |
Tell Riley
|
|
|
pre rock areas on 1st and 2nd floors//ok to rock areas to install shower/tubs//
|
BLD-Framing/Rough-in | 1/8/2020 | 1/9/2020 | 1/9/2020 | A | NR |
Tell Riley
|
|
|
Framing inspection at prerock areas behind tubs on 1st and 2nd floors and for cover at top of stairways and exterior balconies Phone #: ###-#### Inspection requested via web by Travis Blackburn//inspection request was used as a conference to discuss ceiling, wall rating for 2 HR corridor areas and fireblocking at pre-rock areas for tubs and showers//
|
BLD-Wall Bracing | 1/3/2020 | 1/6/2020 | 1/6/2020 | A | PART |
Tell Riley
|
|
|
Verify hardware at 1st floor sufficient per RFI Phone #: ###-#### Inspection requested via web by Travis Blackburn//hold downs ok other than those marked-one missing nut-one missing completely//
|
BLD-Wall Bracing | 12/18/2019 | 12/19/2019 | 12/19/2019 | A | FAIL |
Tell Riley
|
|
|
Holddown hardware inspection is the last of the shear inspection. Look for Matt to guide the inspection Phone #: ###-#### Inspection requested via web by Travis Blackburn//not all hold downs are correct//address incorrect hold downs and call for re-inspection//
|
BLD-Wall Bracing | 12/10/2019 | 12/11/2019 | 12/11/2019 | P | PART |
Tell Riley
|
|
|
This is for the hardware portion of shear. All wall panels were previously inspected. Phone #: ###-#### Inspection requested via web by Travis Blackburn//exterior nailing and straping ok per plans//still need to check interior hold downs//
|
BLD-Other | 12/6/2019 | 12/9/2019 | 12/9/2019 | A | PART |
Tell Riley
|
|
|
This is for a reinspect for cover at portions of party walls that are behind plumbing walls. Phone #: ###-#### Inspection requested via web by Travis Blackburn//3rd floor ok//1st and 2nd floor not ready//
|
BLD-Concrete | 12/5/2019 | 12/6/2019 | 12/6/2019 | A | PART |
Tell Riley
|
|
|
We are pouring the patios on building B tomorrow at 10am... Also included will be the last garbage enclosure, pier pads for building J, and piers for building H. Phone #: ###-#### Inspection requested via web by Matt Perry//ok pending specials//
|
BLD-Wall Bracing | 12/4/2019 | 12/5/2019 | 12/5/2019 | A | PART |
Tell Riley
|
|
|
This is for a partial shear inspection, as much as time will allow. Phone #: ###-#### Inspection requested via web by Travis Blackburn//verify and use approved fasteners in pressure treated plates//add nails in areas marked during walk thorugh//nailing inspection no hardware inspected//
|
BLD-Other | 12/3/2019 | 12/3/2019 | 12/3/2019 | P | FAIL |
Tell Riley
|
|
|
This inspection is for prerock areas behind tubs at party walls and exterior walls prior to setting tub/shower enclosures. Phone #: ###-#### Inspection requested via web by Travis Blackburn//need to remove insulation at exterior wall fur outs to drywall per details //call for re - inspection//
|
BLD-Wall Bracing | 10/15/2019 | 10/15/2019 | 10/15/2019 | P | PART |
Tell Riley
|
|
|
This is for 1st floor shear nailing only. Hardware excluded (hold downs). Phone #: ###-#### Inspection requested via web by Travis Blackburn//1st floor shear nailing ok//
|
BLD-Concrete | 9/25/2019 | 9/26/2019 | 9/26/2019 | P | PASS |
Tell Riley
|
|
|
Pouring slab at 4am on Friday. We need the latest possible inspection in the afternoon as we will be working late prepping for the pour. Phone #: ###-#### Inspection requested via web by Travis Blackburn//vapor barirer ok//rebar ok//ok pending specials//
|
BLD-Foundation | 9/5/2019 | 9/6/2019 | 9/6/2019 | P | PASS |
Tell Riley
|
|
|
This is the second portion of bldg B foundation walls. This will pour directly after the clubhouse footings (also scheduled) Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok to pour pending special inspetions//
|
BLD-Foundation | 9/3/2019 | 9/4/2019 | 9/4/2019 | A | PART |
Tell Riley
|
|
|
This will be for the first of two pours on the foundation walls. Geotek will be doing our special inspection as well. Pour time is 1:00pm. Phone #: ###-#### Inspection requested via web by Travis Blackburn//first portion of building B// ok to pour pendings specials//
|
BLD-Footing | 8/26/2019 | 8/27/2019 | 8/27/2019 | A | PASS |
Tell Riley
|
|
|
Concrete pour is scheduled for 1pm Phone #: ###-#### Inspection requested via web by Travis Blackburn//footing and rebar per plans//ok pending specials//
|
Issue PAID IN FULL permit | | | 8/15/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/15/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 8/13/2019 | | |
|
|
|
|
Permit Ready to Issue | | | 8/13/2019 | | DONE |
|
|
|
DO NOT ISSUE WITHOUT OHTER 13 PERMITS AND VOIDED PERMIT HAS PLAN CHECK FEES
MET
NEED
RP
GC
Revised Certificate of Value
|
Routing PW Street Lights | 8/12/2019 | | 8/12/2019 | | PASS |
Tom Marshall
|
|
|
|
Plan assigned to (CJW) | 3/11/2019 | 3/11/2019 | 8/10/2019 | | PASS |
Carl Westfall
|
|
|
* (2nd done) 04/08/19 (new buildings - 25 days) (eplan) Village East Apartments (B) (approved pending structural)
|
Plan Reviewer's activity | | | 8/10/2019 | | DONE |
|
|
|
See the routing under permit BLD19-00526 for all buildings.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/10/2019 | | DONE |
|
|
|
|
Routing - Design Review | 8/5/2019 | | 8/5/2019 | | PASS |
Andrea Tuning
|
|
|
|
Routing - FIRE | 7/9/2019 | 7/9/2019 | 7/16/2019 | | PASS |
Mark Scharfen
|
|
|
07.16.2019-completed fire review. uploaded rev_fire 07.16.2019.pdf. All permits ok on fire.
|
Routing PW Drainage | 7/15/2019 | | 7/15/2019 | | PASS |
Brian Murphy
|
|
|
|
Plan resubmittals received | | | 7/8/2019 | | DONE |
|
|
|
See the routing under permit BLD19-00526 for the 3rd plan review. None of the permits can be issued until all plan reviews are approved. CJW
|
Routing - FIRE | 6/13/2019 | 6/13/2019 | 6/24/2019 | | FAIL |
Mark Scharfen
|
|
|
06.24.2019-Completed fire review uploaded rev_fire 06.24.2019.pdf and emailed architect. Grading/surface issues.
|
Routing - Design Review | 6/17/2019 | | 6/17/2019 | | FAIL |
Andrea Tuning
|
|
|
A total of 272 bicycle parking spaces will be required. A minimum of 68 of the bicycle parking spaces are required to be covered. To provide a safe, covered and efficient location for the bicycles, design the spaces to be a minimum of 6-feet long and 2.5 feet wide and have an overhead clearance of 7-feet if covered. A 4-foot wide aisle is required between rows of bicycle parking or nearby walls. Stationary racks shall be located on improved non-permeable surfaces and anchored to the ground. A detail of the rack and how it is attached to the wall should be submitted with the building permit.
Vertical curbing shall be utilized adjacent to all landscaping and pedestrian walk ways. Permanent wheel restraints may be utilized in lieu of curbing adjacent to pedestrian walk ways.
All interior and terminal planter islands shall provide at least one Class II tree within all of the interior and terminal planters.
Provide an easement for portions of the Valley Regional transit stop located on private property.
Continue to work with staff to provide a cohesive and quality exterior building design in regard to material breaks, the application of brick on each building and the color palette for the development. This may include providing a brick wainscot or brick corner elements on each building, reevaluating the location of material breaks and further refining the color palette.
Employ techniques to recess windows above the ground floor a minimum of 2-inches from the façade or incorporated window trim at least 4-inches in width. Submit a window detail showing this recess.
|
Plan Reviewer's activity | | | 6/13/2019 | | DONE |
|
|
|
See the routing under permit BLD19-00526 for the 2nd plan review. None of the permits can be issued until all plan reviews are approved. CJW
|
Route to Impact Fee Review | 4/13/2019 | 4/16/2019 | 4/16/2019 | | PASS |
Karina Myles
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 3/11/2019 | 3/11/2019 | 4/12/2019 | | FAIL |
Mark Scharfen
|
|
|
IFC 1st Review 04.12.2019.pdf
|
1st review completed | | | 4/12/2019 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 4/12/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/11/2019 | | 4/12/2019 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
Routing Off Site - STRUCTURAL | 3/11/2019 | | 3/27/2019 | | FAIL |
Carl Westfall
|
|
|
Cory Harelson (KPFF)
|
Routing - Erosion and Sediment | 3/11/2019 | | 3/27/2019 | | PASS |
Andy J. Long
|
|
|
see ESC19-00181 for details
|
Routing PW Sewer Design | 3/12/2019 | | 3/26/2019 | | PASS |
DeAnn Brown
|
|
|
|
Routing PW Solid Waste | 3/12/2019 | | 3/21/2019 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Drainage | 3/12/2019 | | 3/21/2019 | | FAIL |
Brian Murphy
|
|
|
|
Routing - PLANNING | 3/11/2019 | | 3/19/2019 | | FAIL |
Leon Letson
|
|
|
See DR comments
|
Routing - MECHANICAL | 3/11/2019 | | 3/15/2019 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 3/11/2019 | | 3/13/2019 | | FAIL |
Andrea Tuning
|
|
|
|
Routing - Addressing | 3/11/2019 | | 3/12/2019 | | PASS |
Doug Chausow
|
|
|
Bldg B: 11988 W Fairview Ave
|
Routing - PUBLIC WORKS | 3/11/2019 | | 3/12/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing PW Street Lights | 3/12/2019 | | 3/12/2019 | | FAIL |
Tom Marshall
|
|
|
|
Routing - PLUMBING | 3/11/2019 | | 3/11/2019 | | PASS |
Daryl Spivey
|
|
|
Meet suds relief requirements and per ISPC.
|
Intake Approval | | | 3/5/2019 | | PASS |
|
|
|
|
Application received | | | 2/21/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 21 2019 5:02PM
|