General Inspection | 3/27/2020 | 3/27/2020 | 4/1/2020 | | PASS |
Andy J. Long
|
|
|
No ESC requests. No disturbed areas or temp BMPs. ESC Permit finaled
|
DOC - Permit Finaled | 4/1/2020 | 4/1/2020 | 4/1/2020 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/12/2020 | 3/12/2020 | 3/12/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/26/2020 | 2/26/2020 | 3/2/2020 | | PASS |
Andy J. Long
|
|
|
No runoff from site. No debris in road. Construction still in progress.
|
General Inspection | 2/11/2020 | 2/11/2020 | 2/14/2020 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 1/27/2020 | 1/27/2020 | 1/28/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/10/2020 | 1/10/2020 | 1/10/2020 | | PASS |
Michael Zawacki
|
|
|
Contained
|
General Inspection | 12/26/2019 | 12/26/2019 | 12/26/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/11/2019 | 12/11/2019 | 12/11/2019 | | PASS |
Andy J. Long
|
|
|
WIP on remodel, no trackout or sediment runoff observed
|
General Inspection | 11/26/2019 | 11/26/2019 | 11/26/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/11/2019 | 11/11/2019 | 11/14/2019 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 10/25/2019 | 10/25/2019 | 10/29/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/10/2019 | 10/10/2019 | 10/11/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/25/2019 | 9/25/2019 | 9/25/2019 | | PASS |
Michael Zawacki
|
|
|
WIP on framing. All building material stored on lot. Trash is contained next to existing home.
|
General Inspection | 9/10/2019 | 9/10/2019 | 9/10/2019 | | PASS |
Michael Zawacki
|
|
|
WIP on framing. All material contained to site.
|
General Inspection | 8/26/2019 | 8/26/2019 | 8/26/2019 | | PASS |
Michael Zawacki
|
|
|
All disturbances contained to lot.
|
General Inspection | 8/9/2019 | 8/9/2019 | 8/9/2019 | | PASS |
Michael Zawacki
|
|
|
Stockpile no longer by road, now looks like it is behind home. Very little debris on road, all material stored on road.
|
General Inspection | 7/25/2019 | 7/25/2019 | 7/25/2019 | P | PASS |
Michael Zawacki
|
|
|
Met with builder on site. Area excavated for retaining wall, expecting to pour footings in next few days. Some stockpiling he will keep an eye on.
|
General Inspection | 7/16/2019 | 7/16/2019 | 7/16/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/1/2019 | 7/1/2019 | 7/1/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/14/2019 | 6/14/2019 | 6/14/2019 | | PASS |
Andy J. Long
|
|
|
WiP. Site is contained. NO loose trash, no discharges, no loose sediment leaving site.
|
General Inspection | 5/30/2019 | 5/30/2019 | 5/30/2019 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 5/14/2019 | 5/14/2019 | 5/14/2019 | | CANC |
Andy J. Long
|
|
|
no current activity. plan modification processing.
|
General Inspection | 4/29/2019 | 4/29/2019 | 4/29/2019 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 4/12/2019 | 4/12/2019 | 4/12/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/28/2019 | 3/28/2019 | 3/28/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/13/2019 | 3/13/2019 | 3/13/2019 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 2/26/2019 | 2/26/2019 | 2/26/2019 | | DEFR |
Michael Zawacki
|
|
|
|
General Inspection | 2/11/2019 | 2/11/2019 | 2/12/2019 | | PASS |
Andy J. Long
|
|
|
No activity or disturbance observed.
|
General Inspection | 1/25/2019 | 1/25/2019 | 1/25/2019 | | PASS |
Michael Zawacki
|
|
|
Hasn't begun
|
General Inspection | 1/10/2019 | 1/10/2019 | 1/10/2019 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 12/26/2018 | 12/26/2018 | 12/26/2018 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 12/11/2018 | 12/11/2018 | 12/11/2018 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 11/26/2018 | 11/26/2018 | 11/26/2018 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 11/9/2018 | 11/9/2018 | 11/9/2018 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 10/25/2018 | 10/25/2018 | 10/25/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/10/2018 | 10/10/2018 | 10/10/2018 | | CANC |
Andy J. Long
|
|
|
project hasn't started
|
General Inspection | 9/25/2018 | 9/25/2018 | 9/25/2018 | | PASS |
Michael Zawacki
|
|
|
No activity. Building permit still not picked up after changes.
|
General Inspection | 9/10/2018 | 9/10/2018 | 9/10/2018 | | PASS |
Michael Zawacki
|
|
|
No activity.
|
General Inspection | 8/24/2018 | 8/24/2018 | 8/24/2018 | | PASS |
Michael Zawacki
|
|
|
Was on hold waiting for plan mod, no activities.
|
General Inspection | 8/9/2018 | 8/9/2018 | 8/9/2018 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 7/24/2018 | 7/25/2018 | 7/26/2018 | A | PASS |
Andy J. Long
|
|
|
No activity or disturbances. Project is in for plan modification
|
General Inspection | 7/17/2018 | 7/17/2018 | 7/24/2018 | | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 3/2/2018 | 3/2/2018 | 3/2/2018 | P | PASS |
Michael Zawacki
|
|
|
No disturbances.
|