Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberBLD19-00278
StatusFinaled
Name ESI
Site Address 139 E WARM SPRINGS AVE
Project NameRonald McDonald House
Customer NumberFOUNDATION 18-04389
ePlanReviewYes
Description
(RONALD MCDONALD HOUSE) (Project Management-Ron Hill) (BLD18-04389 Foundation) (GRD18-00080) (DRH18-00483) // 01/10/20 PLAN MOD TO CHANGE PATIO DOOR HARDWARE AND TOY CLOSET DOORS. JAR // Permit for the construction of a new 39,370 sq ft, 2-story Ronald McDonald House with 48 guest rooms, administrative offices, and support functions. Work will include general site work, utilities and construction of the new building per the approved plans, attached engineering and any comments. Special inspections required per attached Form 310 for soils. Mechanical commissioning shall be completed and a preliminary report to be provided to mechanical inspector for final inspection. This is a fully fire sprinklered for building area increase and residential mixed-occupancy. *JAR*
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 7/19/20208/11/2020 DONE
mailed 8-11-2020
First Notice 5/29/20207/9/2020 DONE
mailed 7-9-2020
Permanent Occupancy  5/19/2020 DONE
PubWorks Occupancy Approval5/18/20205/18/20205/18/2020 DONE
DetailsTiffany Lowery
BLD-Final4/23/20204/24/20204/24/2020APASS
DetailsDave Hannah
Final for CO - trades finaled, zoning signed off. // Corey Phone #: ###-####
Zoning Approval4/23/20204/23/20204/23/2020 PASS
DetailsJosh Wilson
All landscaping complete ok for bond release
BLD-Conference4/20/20204/20/20204/20/2020PDONE
DetailsDave Hannah
Change Expiration Date Only  4/14/2020 DONE
FIRE-Final Inspection4/9/20204/10/20204/10/2020APASS
DetailsJim Page
Previoulsy noted items have been completed, final life fire safety inspection is complete.

I have emailed you pics of the hood/pull station numbering. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
Temporary Occupancy4/2/20207/1/20204/2/2020 DONE
DetailsGemma Flores
Change Expiration Date Only  4/2/2020 DONE
60 day extension approved by Jason Blais - see DOCs
Telephone call  3/26/2020 DONE
Called Cory to check in. Looks like they have passed all of their trades, and just need zoning and PW final inspections for bond release. He said he is going to work on wrapping those up. I also emailed a courtey reminder so they would have all of the information in one document.
BLD-Final1/20/20201/22/20201/22/2020APART
DetailsDave Hannah
Final for TCO. Please call when headed to the site. Phone #: ###-#### Inspection requested via web by Corey Hockersmith ok for tco ok for perm after other trades go perm
Temporary Occupancy1/22/20204/21/20201/22/2020 DONE
DetailsTiffany Carson-Herker
PubWorks Temp Occupancy Appr12/26/201912/26/20191/22/2020 DONE
DetailsTiffany Lowery
Bonding for PW street lights effective 12/17/19. Still need final PW on-site drainage inspection.
FIRE-Final Inspection1/20/20201/21/20201/21/2020PPART
DetailsJim Page
Partial final inspection for life fire safety inspection is complete. Last remaining items are permanent signage for FACP/Fire Sprinkler Riser room and Hood Designation for manual acvtivation pull stations, temp signage in place at time of inspection. 90 day TCO authorized for life fire safety.

Fire/Life/Safety for TCO Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Conference1/16/20201/17/20201/17/2020APASS
DetailsDave Hannah
Walk the site in preparation for TCO. Please Call when headed to the site. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
FIRE-Final Inspection1/16/20201/16/20201/16/2020PFAIL
DetailsJim Page
Ceiling was installed under southeast stairs, sprinkler head in room is overspaced, provide fire sprinkler under southeast stairs.

Fire/Life/ Safety. Please call when headed to the site. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
Zoning Approval Temp1/16/20201/16/20201/16/2020 DONE
DetailsKatelyn Menuge
Temp - Bonded for Landscape - BND20-00020
CHANGE STATUS TO (ISS)  1/15/2020 DONE
plan mod approved
OVERRIDE  1/10/2020  
Plan assigned to (JAR)1/3/20201/3/20201/10/2020 DONE
DetailsJulie Romig
01/10 - Plan Mod Ronald McDonald House
Routing - PLAN CHECK1/9/2020 1/10/2020 PASS
DetailsJulie Romig
Permit Ready to Issue  1/10/2020 DONE
PLAN MOD
Routing - FIRE1/6/20201/7/20201/9/2020 PASS
DetailsErika Akin
Plan Mod Ronald McDonald house to install door hardware on outside of the toy closet door to readily identify it as a door to emergency responders as discussed with Assistant Fire Marshal Ron Johnson. Hardware on patio doors under review by IBC plan reviewer.
Routing - PLAN CHECK1/6/2020 1/9/2020 FAIL
DetailsJulie Romig
FIRE-Final Inspection1/7/20201/8/20201/7/2020APART
DetailsJim Page
Inspection for fire dpartment radio coverage complete and passed per email from Ron Johnson.

request per Jim Page Phone #: ###-####
Plan Modification Accepted  1/3/2020 DONE
Adding a second door to toy closet A153 and altering the door hardware to dorrs A 109B, A152B, 154 A, 154B and A155B.
FIRE-Conference12/23/201912/23/201912/23/2019PDONE
DetailsJim Page
Fire conference complete.

Fire life/safety walk Phone #: ###-#### Inspection requested via web by Corey Hockersmith
FIRE-Conference12/13/201912/13/201912/13/2019PDONE
DetailsJim Page
Fire sprinkler systems are active and monitored, set up of unit furniture/office furniture is approved, no occupancy allowed as of this entry.
BLD-Conference12/12/201912/12/201912/12/2019PDONE
DetailsDave Hannah
Fire door closer and latch on second by elevator. Please call me when you are headed to the site. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Ceiling Grid Inspection12/6/201912/9/201912/9/2019PPASS
DetailsDave Hannah
Game Room, play room and toy closet. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Conference12/6/201912/9/201912/9/2019PPASS
DetailsDave Hannah
Preliminary building walk in preparation for TCO. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Conference12/5/201912/6/201912/6/2019PCANC
DetailsJim Storey
Preliminary walk for TCO. Please call when headed to site. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
FIRE-Conference12/3/201912/5/201912/5/2019ADONE
DetailsJim Page
Fire conference complete.

Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Footing10/31/201910/31/201910/31/2019PPASS
DetailsDave Hannah
Trash enclosure footing Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Foundation10/31/201910/31/201910/31/2019PPASS
DetailsDave Hannah
Trash enclosure stem wall Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Foundation10/31/201910/31/201910/31/2019PCANC
DetailsDave Hannah
Trash enclosure footing Phone #: ###-#### >> Inspection requested via web by Corey Hockersmith Inspection cancelled from web by: Corey Hockersmith
BLD-Ceiling Grid Inspection10/22/201910/23/201910/23/2019APASS
DetailsDave Hannah
First floor section 1 Area A. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Ceiling Grid Inspection10/18/201910/21/201910/21/2019PFAIL
DetailsDave Hannah
Ceiling inspection for dropped ACT ceiling tiles through first floor section Area A. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Footing10/2/201910/3/201910/3/2019APASS
DetailsDave Hannah
Inspection of site seat wall footings and rebar. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Wall cover9/19/20199/19/20199/19/2019PPASS
DetailsDave Hannah
Second floor elevator shaft drywall and fire tape. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
FIRE-Conference9/6/20199/9/20199/9/2019ADONE
DetailsJim Page
Fire conference complete, discussed smoke detector locations for door mag release.

Question about smoke detector location at fire door east of kitchen area. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Energy code compliance8/14/20198/15/20198/15/2019PPASS
DetailsDave Hannah
East stairwell exterior walls Phone #: ###-#### Inspection requested via web by Corey Hockersmith
FIRE-Conference8/13/20198/13/20198/13/2019PDONE
DetailsJim Page
Northwest battered wall filled with insulation, this battered wall is the last battered wall for inspection, approved for cover, as-builts for fire sprinklers needs to show the deleted fire sprinklers where insualtion was placed in the battered walls.

Battered wall insulation at northwest corner. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Framing/Rough-in8/7/20198/8/20198/8/2019APASS
DetailsDave Hannah
Second floor Area B Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Conference8/6/20198/7/20198/7/2019APASS
DetailsDave Hannah
fire caulking area B, 2nd level // Ken Phone #: ###-####
BLD-Energy code compliance8/6/20198/7/20198/7/2019APASS
DetailsDave Hannah
2nd floor, area B // Ken Phone #: ###-####
BLD-Framing/Rough-in7/31/20198/5/20198/6/2019ANR
DetailsDave Hannah
Second floor Area B Phone #: ###-#### Inspection requested via web by Corey Hockersmith
FIRE-Final Inspection7/30/20198/2/20198/2/2019ADONE
DetailsJim Page
East side battered wall filled with insulation, this is the last battered wall for inspection, approved for cover, as-builts for fire sprinklers needs to show the deleted fire sprinklers where insualtion was placed in the battered walls.

Battered wall insulation for east stairwell and building entrance B117. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Framing/Rough-in7/31/20197/31/20197/31/2019PPASS
DetailsDave Hannah
Dropped ceiling framing over Reception A101 and Living Room A201 Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Energy code compliance7/25/20197/26/20197/26/2019APART
DetailsDave Hannah
West stairwell, living alcove B108, living alcove B117, East stair landing, units B204, B206, B215 and B218 for window seat framing. Phone #: ###-#### Inspection requested via web by Corey Hockersmith stairtower and 1st fl only ok
FIRE-Conference7/25/20197/26/20197/26/2019ADONE
DetailsJim Page
Battered walls on the northeast and east side of building have been filled with non-combustible insulation, sprinkler heads have been deleted due to insulation install, approved for cover in tegards to fire sprinkler protection.

Battered wall insulation at living alcove B108 and outside units B115 and B118 (east side of building). Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Energy code compliance7/24/20197/26/20197/25/2019ACANC
DetailsDave Hannah
Exterior walls of units B204, B206, B215, B218 and southwest stairwell. Phone #: ###-#### >> Inspection requested via web by Corey Hockersmith Inspection cancelled from web by: Corey Hockersmith
FIRE-Conference7/24/20197/25/20197/25/2019ACANC
DetailsJim Page
Conference cancelled per conversation with point of contact, insulation was not ready, rescheduled for AM on 26JULY2019.

Battered wall insulation at living alcove B108 and outside units B115 and B118 (east side of building). Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Framing/Rough-in7/24/20197/24/20197/24/2019PPASS
DetailsDave Hannah
Exterior walls of units B204, B206, B215, B218 and southwest stairwell. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Framing/Rough-in7/23/20197/24/20197/24/2019PCANC
DetailsDave Hannah
Framing at window seat framing B215, 218, 204 and 206 on second floor Area B. Phone #: ###-#### >> Inspection requested via web by Corey Hockersmith Inspection cancelled from web by: Corey Hockersmith
FIRE-Conference7/23/20197/24/20197/23/2019ACANC
DetailsJim Page
Battered wall insulation living alcove entrance B108 and outside of units B115 and B118 Phone #: ###-#### >> Inspection requested via web by Corey Hockersmith Inspection cancelled from web by: Corey Hockersmith
BLD-Energy code compliance7/15/20197/17/20197/18/2019APASS
DetailsDave Hannah
First floor Area B Phone #: ###-#### Inspection requested via web by Corey Hockersmith
FIRE-Conference7/16/20197/17/20197/17/2019ADONE
DetailsJim Page
Inspection for insulation inside battered wall is complete, filled with non-combustible insulation, sprinkler heads are removed and deleted, approved for cover.

Exterior battered wall insulation north side of reception A101. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Framing/Rough-in7/16/20197/16/20197/17/2019PPASS
DetailsDave Hannah
First floor units and hallways Area B Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Framing/Rough-in7/15/20197/15/20197/16/2019APART
DetailsDave Hannah
First floor units and hallways Area B Phone #: ###-#### Inspection requested via web by Corey Hockersmith ok to insulate
BLD-Framing/Rough-in7/11/20197/12/20197/12/2019APASS
DetailsDave Hannah
Area B second floor hallway and elevator second floor attic side sheetrock. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Energy code compliance7/9/20197/11/20197/12/2019PPASS
DetailsDave Hannah
Area A second floor Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Energy code compliance7/9/20197/10/20197/10/2019APASS
DetailsDave Hannah
North kitchen wall Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Framing/Rough-in7/9/20197/10/20197/10/2019APASS
DetailsDave Hannah
Area A second floor approval to cover walls Phone #: ###-#### Inspection requested via web by Corey Hockersmith
FIRE-Sprinkler Rough-in7/5/20197/8/20197/8/2019AFAIL
DetailsJim Page
Fire sprinkler/fire sprinkler tenting inspections are to be scheduled by the installing contractor/permit holder.

Fire suppression line insulation tenting above stair A105hallway B-100, guest laundry B105 Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Energy code compliance6/29/20197/2/20197/5/2019PNR
DetailsDave Hannah
Inspect north wall of kitchen area. Please call Kenny when onsite. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Energy code compliance7/2/20197/3/20197/5/2019PNR
DetailsDave Hannah
Kitchens area north exterior wall, exterior high wall at north stair, 2nd level living room, guest laundry, electrical room Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Framing/Rough-in6/29/20197/1/20197/1/2019PPART
DetailsDave Hannah
Area A first floor section 2 (Kitchen, living and dining area). Please call Kenny when onsite. Phone #: ###-#### Inspection requested via web by Corey Hockersmith drop ceiling ok
FIRE-Conference6/26/20196/27/20196/27/2019PDONE
DetailsJim Page
Fire conference complete, exterior battered wall on southwest corner of Area A is filled with non-combustible insulation, area inspected approved for cover.

Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Energy code compliance6/26/20196/27/20196/27/2019APASS
DetailsBrandon Shaw
Second floor main restroom Area A and B104, B106, B115 and B118 Area B. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Framing/Rough-in6/25/20196/26/20196/27/2019PPASS
DetailsBrandon Shaw
First floor Area B exterior farming at B104, B106, B115 and B118 for steel framing at exterior wall. Second floor Area B restroom ceiling and drop pre rock. Second floor Area A main rest rooms ceiling and pre rock. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
FIRE-Conference6/25/20196/26/20196/26/2019ADONE
DetailsJim Page
Fire conference complete.

Layout for smoke detectors in hallways. Please call and let me know when you''re on site. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Energy code compliance6/18/20196/18/20196/21/2019APASS
DetailsDave Hannah
BLD-Framing/Rough-in6/19/20196/20/20196/20/2019APASS
DetailsBrandon Shaw
First floor section 1 Area A sheetrock ceiling drops (staff restrooms, huddle, board room soffits, main restrooms, lower reception and hallway) and wall cover (reception, family intake, lower part of main stairs and main restrooms) Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Energy code compliance6/17/20196/17/20196/18/2019PNR
DetailsDave Hannah
BLD-Energy code compliance6/13/20196/17/20196/17/2019PPASS
DetailsDave Hannah
First floor Area B Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Framing/Rough-in6/13/20196/14/20196/14/2019APASS
DetailsDave Hannah
Framing inspection for first floor Area B units, unit restrooms and hallway for ceiling and drop pre rock. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Framing/Rough-in6/10/20196/12/20196/13/2019PCANC
DetailsDave Hannah
Inspection for units, units bathrooms and hallways ceiling and drop pre rock first floor Area B. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Energy code compliance6/10/20196/11/20196/11/2019APASS
DetailsDave Hannah
Exterior wall insulation first floor section 1 Area A Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Framing/Rough-in6/6/20196/11/20196/10/2019PCANC
DetailsDave Hannah
Ceiling and drops all units and hallways first floor Area B Phone #: ###-#### >> Inspection requested via web by Corey Hockersmith Inspection cancelled from web by: Corey Hockersmith
BLD-Energy code compliance6/6/20196/10/20196/10/2019PCANC
DetailsDave Hannah
Exterior wall insulation first floor section 1 Area A Phone #: ###-#### >> Inspection requested via web by Corey Hockersmith Inspection cancelled from web by: Corey Hockersmith
BLD-Framing/Rough-in6/6/20196/6/20196/10/2019PPART
DetailsDave Hannah
Second floor Area A (grid line AA to A12) Phone #: ###-#### Inspection requested via web by Corey Hockersmith bath room party walls
BLD-Wall Bracing5/30/20196/3/20196/4/2019PPASS
DetailsDave Hannah
Interior sheer panel nailing and floor to floor straps for first floor of Area B. Al with MTI completed epoxy and hold down inspection for this area on 5/30. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Wall cover5/24/20195/28/20195/28/2019APASS
DetailsDave Hannah
Tub wall cover second floor Area B. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Framing/Rough-in5/17/20195/20/20195/20/2019PPASS
DetailsDave Hannah
Ceiling and drop area sheetrock for section 2 of Area A. MTI for special inspection for fire stopping. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Energy code compliance5/15/20195/15/20195/15/2019PPART
DetailsDave Hannah
Section 1 of Area A exterior wall insulation inspection for top 4'' where pre rock will be hung. Phone #: ###-#### Inspection requested via web by Corey Hockersmith ok to pre rock
BLD-Energy code compliance5/10/20195/15/20195/15/2019ACANC
DetailsDave Hannah
Section 1 of Area A exterior wall insulation inspection for top 4'' where pre rock will be hung. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Framing/Rough-in5/10/20195/14/20195/14/2019APART
DetailsDave Hannah
Section 1 of Area A for ceiling pre rock and 4'' drop on walls. Phone #: ###-#### Inspection requested via web by Corey Hockersmith ok to insulate floor 1st fl area a
BLD-Wall cover5/13/20195/13/20195/13/2019PPART
DetailsDave Hannah
Second floor tub areas for section 2 of Area A. Walls between A253-A255, A254-A256 and A257-A261. Please call before. Phone #: ###-#### Inspection requested via web by Corey Hockersmith ok to sheetrock around showers
BLD-Framing/Rough-in5/9/20195/10/20195/12/2019PPART
DetailsDave Hannah
First floor ceiling pre rock section 1 of Area A. MTI to do special inspection for interior sheer nailing, visual of epoxy for interior hold downs and sill plate attachment. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Wall cover5/1/20195/6/20195/6/2019APASS
DetailsDave Hannah
Approval to one side cover tub areas second floor Area A per visit on 5/1. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Framing/Rough-in4/30/20195/1/20195/1/2019ADONE
DetailsDave Hannah
Discussion for pre rock for unit tub areas and mechanical rooms. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Conference4/26/20194/29/20194/29/2019PPASS
DetailsDave Hannah
Please give me a call when headed to the site. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
Print Occupancy Form  4/23/2019 DONE
Issue PAID IN FULL permit  4/23/2019 DONE
emailed Heather to sign and send back,,,also asked Heather about finaling out the foundation permit but she said they weren't ready to do that yet. She will make sure they call in when done so the permits do not get mixed up
Routing PW Street Lights2/13/2019 4/23/2019 PASS
DetailsTom Marshall
Street lights are being tracked on BLD18-04389.
OVERRIDE  4/22/2019  
Plan assigned to (JAR)2/12/20192/13/20194/22/2019 DONE
DetailsJulie Romig
1st Rev Comp - 3rd Comp - 502 Ronald McDonald House
Routing - PLAN CHECK4/22/2019 4/22/2019 PASS
DetailsJulie Romig
PLANS/APPL TAKEN TO FRONT DESK  4/22/2019 DONE
Permit Ready to Issue  4/22/2019 DONE
NEED
GC FORM
REVISED VALUE
pleae make sure PRK impact fees have been assessed
i called them to let them know CAN
Routing - FIRE4/18/20194/18/20194/19/2019 PASS
DetailsErika Akin
Attached comments to case
Routing - PLAN CHECK4/18/2019 4/19/2019 FAIL
DetailsJulie Romig
Routing - MECHANICAL4/18/2019 4/19/2019 PASS
DetailsTroy James
Expedited Review - 3rd Review
Routing Off Site - STRUCTURAL4/10/2019 4/15/2019 PASS
DetailsJulie Romig
KPFF 2nd Review (expedited)
Routing - FIRE4/12/20194/12/20194/12/2019 FAIL
DetailsErika Akin
Toy cupboard
Routing - PLAN CHECK4/10/2019 4/12/2019 FAIL
DetailsJulie Romig
Report emailed to architect and uploaded into ePlan.
Routing - MECHANICAL4/10/2019 4/10/2019 FAIL
DetailsTroy James
Routing - FIRE2/12/20192/13/20193/25/2019 PASS
DetailsErika Akin
Attached comments to case
Routing - PLAN CHECK2/13/2019 3/25/2019 FAIL
DetailsJulie Romig
1st review completed  3/25/2019 FAIL
DetailsJulie Romig
Routing Off Site - STRUCTURAL2/13/2019 2/28/2019 FAIL
DetailsJulie Romig
KPFF
Routing PW Sewer Design2/13/2019 2/21/2019 PASS
DetailsDeAnn Brown
Sewer reviewed and approved as part of BLD18-04389.
Routing - MECHANICAL2/13/2019 2/21/2019 FAIL
DetailsTroy James
Need commissioning report form 308 completed and uploaded to eplan.
Routing - Design Review2/13/2019 2/21/2019 PASS
DetailsJosh Wilson
OK per DRH18-000483
Routing PW Drainage2/13/2019 2/20/2019 PASS
DetailsBrian Murphy
Routing PW Solid Waste2/13/2019 2/14/2019 PASS
DetailsEvan Carpenter
Routing - PLANNING2/13/2019 2/14/2019 PASS
DetailsDavid Moser
See DRH18-00483
Routing - Addressing2/13/2019 2/13/2019 PASS
DetailsDoug Chausow
Address updated: 139 E Warm Springs Ave
Routing - PUBLIC WORKS2/13/2019 2/13/2019 PASS
DetailsAngela Hardy
Routing - Erosion and Sediment2/13/2019 2/13/2019 PASS
DetailsAndy J. Long
VOID, see ESC18-01432
Routing - PLUMBING2/13/2019 2/13/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Intake Approval  2/12/2019 PASS
DetailsJoe Bruce
Prescreen approved 02/07/19; Fees paid 02/12/19
Intake Approval  2/1/2019 FAIL
DetailsJoe Bruce
4) Plan sheets that still need to be revised are: A660, E404, G000-Cover sheet, G002, L.150, P301, P302, S6.62 These do not have the required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Revise sheets with a blank 4” x 2” (4"x4" on sheet G000) space located 3” off the right sheet edge to allow for the title block. Verify ALL plan sheets have the required space for city approval stamp.
Intake Approval  1/30/2019 FAIL
DetailsJoe Bruce
1) A recorded document for new/existing sewer easements could not be located in the documents folder. Upload document.
2) Civil and Landscape plans could not be located in the drawings folder.
3) The sheets uploaded do not match the table of contents. (i.e. Sheet A701 - Roof Area B, could not be found in drawing folder) Verify that all uploaded sheets match the table of contents.
4) Plan sheets do not have the required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Revise sheets with a blank 4” x 2” (4"x4" on cover) space located 3” off the right sheet edge to allow for the title block. Verify ALL plan sheets have the required space for city approval stamp.
5) ESC plans could not be located. Upload these drawings per checklist.
6) Checklist is missing the page references for locations of items. Provide a page number for all required checklist items.
Application received  1/25/2019 DONE
Application submitted via PDS Online on Jan 25 2019 8:40AM
Third Notice 8/16/2020