BLD-Final | 4/23/2020 | 4/24/2020 | 4/24/2020 | A | PASS |
Dave Hannah
|
|
|
Final for CO - trades finaled, zoning signed off. // Corey Phone #: ###-####
|
BLD-Conference | 4/20/2020 | 4/20/2020 | 4/20/2020 | P | DONE |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 4/9/2020 | 4/10/2020 | 4/10/2020 | A | PASS |
Jim Page
|
|
|
Previoulsy noted items have been completed, final life fire safety inspection is complete.
I have emailed you pics of the hood/pull station numbering. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Final | 1/20/2020 | 1/22/2020 | 1/22/2020 | A | PART |
Dave Hannah
|
|
|
Final for TCO. Please call when headed to the site. Phone #: ###-#### Inspection requested via web by Corey Hockersmith ok for tco ok for perm after other trades go perm
|
FIRE-Final Inspection | 1/20/2020 | 1/21/2020 | 1/21/2020 | P | PART |
Jim Page
|
|
|
Partial final inspection for life fire safety inspection is complete. Last remaining items are permanent signage for FACP/Fire Sprinkler Riser room and Hood Designation for manual acvtivation pull stations, temp signage in place at time of inspection. 90 day TCO authorized for life fire safety.
Fire/Life/Safety for TCO Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Conference | 1/16/2020 | 1/17/2020 | 1/17/2020 | A | PASS |
Dave Hannah
|
|
|
Walk the site in preparation for TCO. Please Call when headed to the site. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
FIRE-Final Inspection | 1/16/2020 | 1/16/2020 | 1/16/2020 | P | FAIL |
Jim Page
|
|
|
Ceiling was installed under southeast stairs, sprinkler head in room is overspaced, provide fire sprinkler under southeast stairs.
Fire/Life/ Safety. Please call when headed to the site. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
FIRE-Final Inspection | 1/7/2020 | 1/8/2020 | 1/7/2020 | A | PART |
Jim Page
|
|
|
Inspection for fire dpartment radio coverage complete and passed per email from Ron Johnson.
request per Jim Page Phone #: ###-####
|
FIRE-Conference | 12/23/2019 | 12/23/2019 | 12/23/2019 | P | DONE |
Jim Page
|
|
|
Fire conference complete.
Fire life/safety walk Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
FIRE-Conference | 12/13/2019 | 12/13/2019 | 12/13/2019 | P | DONE |
Jim Page
|
|
|
Fire sprinkler systems are active and monitored, set up of unit furniture/office furniture is approved, no occupancy allowed as of this entry.
|
BLD-Conference | 12/12/2019 | 12/12/2019 | 12/12/2019 | P | DONE |
Dave Hannah
|
|
|
Fire door closer and latch on second by elevator. Please call me when you are headed to the site. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Ceiling Grid Inspection | 12/6/2019 | 12/9/2019 | 12/9/2019 | P | PASS |
Dave Hannah
|
|
|
Game Room, play room and toy closet. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Conference | 12/6/2019 | 12/9/2019 | 12/9/2019 | P | PASS |
Dave Hannah
|
|
|
Preliminary building walk in preparation for TCO. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Conference | 12/5/2019 | 12/6/2019 | 12/6/2019 | P | CANC |
Jim Storey
|
|
|
Preliminary walk for TCO. Please call when headed to site. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
FIRE-Conference | 12/3/2019 | 12/5/2019 | 12/5/2019 | A | DONE |
Jim Page
|
|
|
Fire conference complete.
Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Footing | 10/31/2019 | 10/31/2019 | 10/31/2019 | P | PASS |
Dave Hannah
|
|
|
Trash enclosure footing Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Foundation | 10/31/2019 | 10/31/2019 | 10/31/2019 | P | PASS |
Dave Hannah
|
|
|
Trash enclosure stem wall Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Foundation | 10/31/2019 | 10/31/2019 | 10/31/2019 | P | CANC |
Dave Hannah
|
|
|
Trash enclosure footing Phone #: ###-#### >> Inspection requested via web by Corey Hockersmith Inspection cancelled from web by: Corey Hockersmith
|
BLD-Ceiling Grid Inspection | 10/22/2019 | 10/23/2019 | 10/23/2019 | A | PASS |
Dave Hannah
|
|
|
First floor section 1 Area A. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Ceiling Grid Inspection | 10/18/2019 | 10/21/2019 | 10/21/2019 | P | FAIL |
Dave Hannah
|
|
|
Ceiling inspection for dropped ACT ceiling tiles through first floor section Area A. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Footing | 10/2/2019 | 10/3/2019 | 10/3/2019 | A | PASS |
Dave Hannah
|
|
|
Inspection of site seat wall footings and rebar. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Wall cover | 9/19/2019 | 9/19/2019 | 9/19/2019 | P | PASS |
Dave Hannah
|
|
|
Second floor elevator shaft drywall and fire tape. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
FIRE-Conference | 9/6/2019 | 9/9/2019 | 9/9/2019 | A | DONE |
Jim Page
|
|
|
Fire conference complete, discussed smoke detector locations for door mag release.
Question about smoke detector location at fire door east of kitchen area. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Energy code compliance | 8/14/2019 | 8/15/2019 | 8/15/2019 | P | PASS |
Dave Hannah
|
|
|
East stairwell exterior walls Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
FIRE-Conference | 8/13/2019 | 8/13/2019 | 8/13/2019 | P | DONE |
Jim Page
|
|
|
Northwest battered wall filled with insulation, this battered wall is the last battered wall for inspection, approved for cover, as-builts for fire sprinklers needs to show the deleted fire sprinklers where insualtion was placed in the battered walls.
Battered wall insulation at northwest corner. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Framing/Rough-in | 8/7/2019 | 8/8/2019 | 8/8/2019 | A | PASS |
Dave Hannah
|
|
|
Second floor Area B Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Conference | 8/6/2019 | 8/7/2019 | 8/7/2019 | A | PASS |
Dave Hannah
|
|
|
fire caulking area B, 2nd level // Ken Phone #: ###-####
|
BLD-Energy code compliance | 8/6/2019 | 8/7/2019 | 8/7/2019 | A | PASS |
Dave Hannah
|
|
|
2nd floor, area B // Ken Phone #: ###-####
|
BLD-Framing/Rough-in | 7/31/2019 | 8/5/2019 | 8/6/2019 | A | NR |
Dave Hannah
|
|
|
Second floor Area B Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
FIRE-Final Inspection | 7/30/2019 | 8/2/2019 | 8/2/2019 | A | DONE |
Jim Page
|
|
|
East side battered wall filled with insulation, this is the last battered wall for inspection, approved for cover, as-builts for fire sprinklers needs to show the deleted fire sprinklers where insualtion was placed in the battered walls.
Battered wall insulation for east stairwell and building entrance B117. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Framing/Rough-in | 7/31/2019 | 7/31/2019 | 7/31/2019 | P | PASS |
Dave Hannah
|
|
|
Dropped ceiling framing over Reception A101 and Living Room A201 Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Energy code compliance | 7/25/2019 | 7/26/2019 | 7/26/2019 | A | PART |
Dave Hannah
|
|
|
West stairwell, living alcove B108, living alcove B117, East stair landing, units B204, B206, B215 and B218 for window seat framing. Phone #: ###-#### Inspection requested via web by Corey Hockersmith stairtower and 1st fl only ok
|
FIRE-Conference | 7/25/2019 | 7/26/2019 | 7/26/2019 | A | DONE |
Jim Page
|
|
|
Battered walls on the northeast and east side of building have been filled with non-combustible insulation, sprinkler heads have been deleted due to insulation install, approved for cover in tegards to fire sprinkler protection.
Battered wall insulation at living alcove B108 and outside units B115 and B118 (east side of building). Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Energy code compliance | 7/24/2019 | 7/26/2019 | 7/25/2019 | A | CANC |
Dave Hannah
|
|
|
Exterior walls of units B204, B206, B215, B218 and southwest stairwell. Phone #: ###-#### >> Inspection requested via web by Corey Hockersmith Inspection cancelled from web by: Corey Hockersmith
|
FIRE-Conference | 7/24/2019 | 7/25/2019 | 7/25/2019 | A | CANC |
Jim Page
|
|
|
Conference cancelled per conversation with point of contact, insulation was not ready, rescheduled for AM on 26JULY2019.
Battered wall insulation at living alcove B108 and outside units B115 and B118 (east side of building). Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Framing/Rough-in | 7/24/2019 | 7/24/2019 | 7/24/2019 | P | PASS |
Dave Hannah
|
|
|
Exterior walls of units B204, B206, B215, B218 and southwest stairwell. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Framing/Rough-in | 7/23/2019 | 7/24/2019 | 7/24/2019 | P | CANC |
Dave Hannah
|
|
|
Framing at window seat framing B215, 218, 204 and 206 on second floor Area B. Phone #: ###-#### >> Inspection requested via web by Corey Hockersmith Inspection cancelled from web by: Corey Hockersmith
|
FIRE-Conference | 7/23/2019 | 7/24/2019 | 7/23/2019 | A | CANC |
Jim Page
|
|
|
Battered wall insulation living alcove entrance B108 and outside of units B115 and B118 Phone #: ###-#### >> Inspection requested via web by Corey Hockersmith Inspection cancelled from web by: Corey Hockersmith
|
BLD-Energy code compliance | 7/15/2019 | 7/17/2019 | 7/18/2019 | A | PASS |
Dave Hannah
|
|
|
First floor Area B Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
FIRE-Conference | 7/16/2019 | 7/17/2019 | 7/17/2019 | A | DONE |
Jim Page
|
|
|
Inspection for insulation inside battered wall is complete, filled with non-combustible insulation, sprinkler heads are removed and deleted, approved for cover.
Exterior battered wall insulation north side of reception A101. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Framing/Rough-in | 7/16/2019 | 7/16/2019 | 7/17/2019 | P | PASS |
Dave Hannah
|
|
|
First floor units and hallways Area B Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Framing/Rough-in | 7/15/2019 | 7/15/2019 | 7/16/2019 | A | PART |
Dave Hannah
|
|
|
First floor units and hallways Area B Phone #: ###-#### Inspection requested via web by Corey Hockersmith ok to insulate
|
BLD-Framing/Rough-in | 7/11/2019 | 7/12/2019 | 7/12/2019 | A | PASS |
Dave Hannah
|
|
|
Area B second floor hallway and elevator second floor attic side sheetrock. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Energy code compliance | 7/9/2019 | 7/11/2019 | 7/12/2019 | P | PASS |
Dave Hannah
|
|
|
Area A second floor Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Energy code compliance | 7/9/2019 | 7/10/2019 | 7/10/2019 | A | PASS |
Dave Hannah
|
|
|
North kitchen wall Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Framing/Rough-in | 7/9/2019 | 7/10/2019 | 7/10/2019 | A | PASS |
Dave Hannah
|
|
|
Area A second floor approval to cover walls Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
FIRE-Sprinkler Rough-in | 7/5/2019 | 7/8/2019 | 7/8/2019 | A | FAIL |
Jim Page
|
|
|
Fire sprinkler/fire sprinkler tenting inspections are to be scheduled by the installing contractor/permit holder.
Fire suppression line insulation tenting above stair A105hallway B-100, guest laundry B105 Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Energy code compliance | 6/29/2019 | 7/2/2019 | 7/5/2019 | P | NR |
Dave Hannah
|
|
|
Inspect north wall of kitchen area. Please call Kenny when onsite. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Energy code compliance | 7/2/2019 | 7/3/2019 | 7/5/2019 | P | NR |
Dave Hannah
|
|
|
Kitchens area north exterior wall, exterior high wall at north stair, 2nd level living room, guest laundry, electrical room Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Framing/Rough-in | 6/29/2019 | 7/1/2019 | 7/1/2019 | P | PART |
Dave Hannah
|
|
|
Area A first floor section 2 (Kitchen, living and dining area). Please call Kenny when onsite. Phone #: ###-#### Inspection requested via web by Corey Hockersmith drop ceiling ok
|
FIRE-Conference | 6/26/2019 | 6/27/2019 | 6/27/2019 | P | DONE |
Jim Page
|
|
|
Fire conference complete, exterior battered wall on southwest corner of Area A is filled with non-combustible insulation, area inspected approved for cover.
Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Energy code compliance | 6/26/2019 | 6/27/2019 | 6/27/2019 | A | PASS |
Brandon Shaw
|
|
|
Second floor main restroom Area A and B104, B106, B115 and B118 Area B. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Framing/Rough-in | 6/25/2019 | 6/26/2019 | 6/27/2019 | P | PASS |
Brandon Shaw
|
|
|
First floor Area B exterior farming at B104, B106, B115 and B118 for steel framing at exterior wall. Second floor Area B restroom ceiling and drop pre rock. Second floor Area A main rest rooms ceiling and pre rock. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
FIRE-Conference | 6/25/2019 | 6/26/2019 | 6/26/2019 | A | DONE |
Jim Page
|
|
|
Fire conference complete.
Layout for smoke detectors in hallways. Please call and let me know when you''re on site. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Energy code compliance | 6/18/2019 | 6/18/2019 | 6/21/2019 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 6/19/2019 | 6/20/2019 | 6/20/2019 | A | PASS |
Brandon Shaw
|
|
|
First floor section 1 Area A sheetrock ceiling drops (staff restrooms, huddle, board room soffits, main restrooms, lower reception and hallway) and wall cover (reception, family intake, lower part of main stairs and main restrooms) Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Energy code compliance | 6/17/2019 | 6/17/2019 | 6/18/2019 | P | NR |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 6/13/2019 | 6/17/2019 | 6/17/2019 | P | PASS |
Dave Hannah
|
|
|
First floor Area B Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Framing/Rough-in | 6/13/2019 | 6/14/2019 | 6/14/2019 | A | PASS |
Dave Hannah
|
|
|
Framing inspection for first floor Area B units, unit restrooms and hallway for ceiling and drop pre rock. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Framing/Rough-in | 6/10/2019 | 6/12/2019 | 6/13/2019 | P | CANC |
Dave Hannah
|
|
|
Inspection for units, units bathrooms and hallways ceiling and drop pre rock first floor Area B. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Energy code compliance | 6/10/2019 | 6/11/2019 | 6/11/2019 | A | PASS |
Dave Hannah
|
|
|
Exterior wall insulation first floor section 1 Area A Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Framing/Rough-in | 6/6/2019 | 6/11/2019 | 6/10/2019 | P | CANC |
Dave Hannah
|
|
|
Ceiling and drops all units and hallways first floor Area B Phone #: ###-#### >> Inspection requested via web by Corey Hockersmith Inspection cancelled from web by: Corey Hockersmith
|
BLD-Energy code compliance | 6/6/2019 | 6/10/2019 | 6/10/2019 | P | CANC |
Dave Hannah
|
|
|
Exterior wall insulation first floor section 1 Area A Phone #: ###-#### >> Inspection requested via web by Corey Hockersmith Inspection cancelled from web by: Corey Hockersmith
|
BLD-Framing/Rough-in | 6/6/2019 | 6/6/2019 | 6/10/2019 | P | PART |
Dave Hannah
|
|
|
Second floor Area A (grid line AA to A12) Phone #: ###-#### Inspection requested via web by Corey Hockersmith bath room party walls
|
BLD-Wall Bracing | 5/30/2019 | 6/3/2019 | 6/4/2019 | P | PASS |
Dave Hannah
|
|
|
Interior sheer panel nailing and floor to floor straps for first floor of Area B. Al with MTI completed epoxy and hold down inspection for this area on 5/30. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Wall cover | 5/24/2019 | 5/28/2019 | 5/28/2019 | A | PASS |
Dave Hannah
|
|
|
Tub wall cover second floor Area B. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Framing/Rough-in | 5/17/2019 | 5/20/2019 | 5/20/2019 | P | PASS |
Dave Hannah
|
|
|
Ceiling and drop area sheetrock for section 2 of Area A. MTI for special inspection for fire stopping. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Energy code compliance | 5/15/2019 | 5/15/2019 | 5/15/2019 | P | PART |
Dave Hannah
|
|
|
Section 1 of Area A exterior wall insulation inspection for top 4'' where pre rock will be hung. Phone #: ###-#### Inspection requested via web by Corey Hockersmith ok to pre rock
|
BLD-Energy code compliance | 5/10/2019 | 5/15/2019 | 5/15/2019 | A | CANC |
Dave Hannah
|
|
|
Section 1 of Area A exterior wall insulation inspection for top 4'' where pre rock will be hung. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Framing/Rough-in | 5/10/2019 | 5/14/2019 | 5/14/2019 | A | PART |
Dave Hannah
|
|
|
Section 1 of Area A for ceiling pre rock and 4'' drop on walls. Phone #: ###-#### Inspection requested via web by Corey Hockersmith ok to insulate floor 1st fl area a
|
BLD-Wall cover | 5/13/2019 | 5/13/2019 | 5/13/2019 | P | PART |
Dave Hannah
|
|
|
Second floor tub areas for section 2 of Area A. Walls between A253-A255, A254-A256 and A257-A261. Please call before. Phone #: ###-#### Inspection requested via web by Corey Hockersmith ok to sheetrock around showers
|
BLD-Framing/Rough-in | 5/9/2019 | 5/10/2019 | 5/12/2019 | P | PART |
Dave Hannah
|
|
|
First floor ceiling pre rock section 1 of Area A. MTI to do special inspection for interior sheer nailing, visual of epoxy for interior hold downs and sill plate attachment. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Wall cover | 5/1/2019 | 5/6/2019 | 5/6/2019 | A | PASS |
Dave Hannah
|
|
|
Approval to one side cover tub areas second floor Area A per visit on 5/1. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Framing/Rough-in | 4/30/2019 | 5/1/2019 | 5/1/2019 | A | DONE |
Dave Hannah
|
|
|
Discussion for pre rock for unit tub areas and mechanical rooms. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Conference | 4/26/2019 | 4/29/2019 | 4/29/2019 | P | PASS |
Dave Hannah
|
|
|
Please give me a call when headed to the site. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|