Aging Inspection | 6/29/2020 | 6/29/2020 | 6/29/2020 | | PASS |
Michael Zawacki
|
|
|
Neighborhood is about finished, area is clean. Last few houses being built.
|
Aging Inspection | 4/27/2020 | 4/27/2020 | 4/27/2020 | | PASS |
Michael Zawacki
|
|
|
Neighborhood nearly completed. Landscapers on site planting sod and doing rock work.
|
Aging Inspection | 2/24/2020 | 2/24/2020 | 2/24/2020 | | PASS |
Michael Zawacki
|
|
|
Development is 2/3 completed, no major issues.
|
Aging Inspection | 12/23/2019 | 12/23/2019 | 12/24/2019 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 10/21/2019 | 10/21/2019 | 10/22/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/20/2019 | 8/20/2019 | 8/20/2019 | P | FAIL |
Michael Zawacki
|
|
|
No washout, has been dumped on lot near mitchell. Some trackout on road from crews filling in backfill.
|
Aging Inspection | 8/5/2019 | 8/5/2019 | 8/5/2019 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/3/2019 | 6/3/2019 | 6/3/2019 | P | PASS |
Michael Zawacki
|
|
|
Lots of weed growth on vacant lots. No new concrete work, site has lined washout. Some dirt on road and sidewalk, people riding bikes in dirt and tracking out. Inlets have protection. No looses trash and no dirt leaving site.
|
General Inspection | 4/4/2019 | 4/4/2019 | 4/4/2019 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/18/2019 | 3/18/2019 | 3/18/2019 | P | FAIL |
Michael Zawacki
|
|
|
New lined washout pit on site, old dumped washout hasn't been cleaned. Lots of dirt on sidewalk and road, building waste needs to be picked up. Talked to workers on site.
|
Aging Inspection | 1/28/2019 | 1/28/2019 | 1/28/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/28/2018 | 11/28/2018 | 11/28/2018 | P | PART |
Michael Zawacki
|
|
|
All neighborhood prep completed. Some dirt is on sidewalks and road.
|
Complaint Inspection | 10/30/2018 | 10/30/2018 | 10/30/2018 | P | DONE |
Andy J. Long
|
|
|
complaint about dust
Notified RP to sweep surfaces before blowing in order to reduce the amount of fugitive dust being created.
|
General Inspection | 10/10/2018 | 10/10/2018 | 10/10/2018 | P | PART |
Michael Zawacki
|
|
|
Some dirt on road inside site from work on sidewalks and water line. Stockpile near Linda Vista has been removed. Stockpile by Mitchell has weed growth and is stable. Nothing leaving site.
|
General Inspection | 9/28/2018 | 10/1/2018 | 10/1/2018 | A | FAIL |
Andy J. Long
|
|
|
Inactive stockpiles area still on site. No perimeter protect. Streets and infrastructure are complete. Storm drains have sediment bags installed.
Will schedule compliance conference with RP and developer.
|
General Inspection | 8/31/2018 | 8/31/2018 | 8/31/2018 | P | PASS |
Michael Zawacki
|
|
|
Met with Joe while on site. Stockpiles are scheduled to be removed next week. Will surround perimeter with wattles to prevent dirt from ending up on sidewalk.
|
Site Preparation | 8/22/2018 | 8/31/2018 | 8/31/2018 | A | CANC |
Andy J. Long
|
|
|
data entry error
|
General Inspection | 8/22/2018 | 8/22/2018 | 8/22/2018 | P | PEND |
Andy J. Long
|
|
|
No trackout or discharges. Large stockpiles on site appear to be inactive and will be an issue for sediment runoff as Fall progress. Stockpiles need perimeter sediment controls or other or removal. Stockpiles are not allowed to be inactive for extended periods.
|
General Inspection | 7/24/2018 | 7/24/2018 | 7/24/2018 | P | PASS |
Michael Zawacki
|
|
|
Main site road is paved and curbing done. Tracksteer doing some dirtwork, no dust. Chipseal project in area.
|
General Inspection | 6/21/2018 | 6/25/2018 | 6/25/2018 | A | PASS |
Michael Zawacki
|
|
|
Canal has been piped and berm built to protect overflow. ACHD ha about a third of Linda Vista torn up. Most of site has curb and sidewalk installed. Site has potential for dust, RP will monitor and water as needed.
|
Conference | 6/21/2018 | 6/21/2018 | 6/21/2018 | A | DONE |
Andy J. Long
|
|
|
see ESC16-01027 for remaining ESC inspections and corrections for the Cottages at Whitecloud by Perryman Construction
|
General Inspection | 5/29/2018 | 5/30/2018 | 5/30/2018 | A | PASS |
Andy J. Long
|
|
|
check on issue with irrigation water flooding site; potential discharge to storm drains on Mitchell.
No offsite discharges or flooding due to irrigation observed.
Crews working on road on east side of project. No violations observed.
|
Aging Inspection | 5/15/2018 | 5/15/2018 | 5/15/2018 | | PASS |
Michael Zawacki
|
|
|
Met with RP on site. Prepping for roads and curb & gutter. No dust or trackout. People are starting to dump trash on site.
|
General Inspection | 3/15/2018 | 3/16/2018 | 3/19/2018 | P | PEND |
Michael Zawacki
|
|
|
Utility trenching complete and road patched. Still no SWPPP or NOI on site. Road has lots of dirt and dust when cars drive by.
|
General Inspection | 3/12/2018 | 3/14/2018 | 3/15/2018 | P | PEND |
Andy J. Long
|
|
|
|
General Inspection | 3/7/2018 | 3/13/2018 | 3/12/2018 | A | PASS |
Andy J. Long
|
|
|
Road work and utility connection in progress by Track Utilities. Linda Vista is closed.
Will follow up later in week to see if site is cleaned after curb and gutter.
|
BMP Violation | 3/6/2018 | 3/7/2018 | 3/7/2018 | A | PEND |
Andy J. Long
|
|
|
No new violations or trackout. Shoulder of road adjacent to protect is currently under construction and dirty. RP stated road is to be paved next week and curb and gutter installed.
Site still not in full compliance, need to have ESC plan on site and install construction entrance.
Will check back next week.
|
Conference | 3/2/2018 | 3/5/2018 | 3/6/2018 | A | CANC |
Andy J. Long
|
|
|
|
Complaint Inspection | 3/2/2018 | 3/2/2018 | 3/2/2018 | P | FAIL |
Andy J. Long
|
|
|
Mud and dirt tracking out from site. BMPs installed are not maintained. No SWPPP on site.
Conference scheduled for Monday
|
Tracking Control | 1/24/2018 | 1/29/2018 | 1/29/2018 | A | PASS |
Michael Zawacki
|
|
|
Trackout has been cleaned up. Workers are parking across street and not in mud. No new complaints from neighbors.
|
Tracking Control | 1/23/2018 | 1/24/2018 | 1/24/2018 | P | PEND |
Michael Zawacki
|
|
|
Spoke to Zach on site. Told him we are getting complaints about trackout. Said he would sweep road at end of day and keep it clean. Workers are using Linda Vista only, some vehicles have gone out onto Mitchell. He will get both clean and I suggested barricades to prevent joy riders.
|
Complaint Inspection | 1/23/2018 | 1/23/2018 | 1/23/2018 | P | PEND |
Andy J. Long
|
|
|
Citizen complaint of excessive trackout to Linda Vista.
Verbal Correction request to have road cleaned this afternoon/evening
Follow up tracking control inspection scheduled for tomorrow.
|
Tracking Control | 1/12/2018 | 1/16/2018 | 1/16/2018 | A | PASS |
Michael Zawacki
|
|
|
Very little trackout onto Mitchell. No stabalized entrance onto Mitchel, entrance onto Linda Vista needs to be refreshed. Asked to close off exit to Mitchell or construct entrance. Called RP Rod left message 11 am 1/16.
|
Random Inspection | 11/21/2017 | 11/21/2017 | 11/21/2017 | P | PART |
Michael Zawacki
|
|
|
titanium excavation installing sewer and precast. Still no SWPPP in mailbox. Trackout on road that they are working along.
|
General Inspection | 11/3/2017 | 11/3/2017 | 11/3/2017 | P | PASS |
Michael Zawacki
|
|
|
Installing sewer or nonpotable water lines. No dust or trackout. SWPPP was not in box at sign, permit posted.
|
General Inspection | 9/8/2017 | 9/12/2017 | 9/19/2017 | P | CANC |
Andy J. Long
|
|
|
|
BMP Violation | 8/31/2017 | 9/5/2017 | 9/8/2017 | A | CANC |
Andy J. Long
|
|
|
|
BMP Violation | 8/30/2017 | 8/31/2017 | 8/31/2017 | P | PEND |
Andy J. Long
|
|
|
|
BMP Violation | 8/23/2017 | 8/24/2017 | 8/30/2017 | A | CANC |
Andy J. Long
|
|
|
follow up
|
Complaint Inspection | 8/23/2017 | 8/23/2017 | 8/23/2017 | P | FAIL |
Andy J. Long
|
|
|
Dust complaint received:
Significant earth work occuring without water truck in use to control dust.
RP stated that water truck broke down and they are in the process of replacement. It was verified that water truck was in use previously till yesterday and today.
Warning issued to control dust ASAP or significant dust creating activity.
Correction request to provide proper trash containment at site staging area/entrance.
|
General Inspection | 8/17/2017 | 8/23/2017 | 8/23/2017 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/11/2017 | 8/17/2017 | 8/17/2017 | P | PEND |
Andy J. Long
|
|
|
|
Site Preparation | 8/4/2017 | 8/14/2017 | 8/16/2017 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/11/2017 | 8/11/2017 | 8/11/2017 | P | PASS |
Andy J. Long
|
|
|
Site has been graded. Permit sign posted, construction entrance installed and perimeter silt fence in certain areas to protect neighboring properties. No trackout, discharges, or wind blown dust observed. Follow up scheduled to check on stabilization and stockpile protection.
|
Site Preparation | 8/3/2017 | 8/4/2017 | 8/4/2017 | A | CANC |
Andy J. Long
|
|
|
Rod 505 ###-####
Approved for grubbing Thursday...
rescheduled for Monday
|
Site Preparation | 8/3/2017 | 8/3/2017 | 8/3/2017 | P | CANC |
Andy J. Long
|
|
|
Rod Phone #: ###-####
|