Permit Information
Permit NumberESC18-00497
StatusFinaled
Name KEVIN FREDRICKSON
Site Address 11800 W JOPLIN RD
Project NameWest Boise Trunk Realign
Customer Number 
ePlanReviewNo
Description
Major trunk line project along Joplin and Ancell Road. SWPPP with dewatering plan provided. CGP eNOI filed by contractor, IDR10010D. BMPs include preserving surrounding vegetation, trackout controls at access points. Much of project is under Joplin and Ancell. Site preparation inspection is REQUIRED.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final7/21/20207/21/20207/21/2020PPASS
DetailsAndy J. Long
Reseeded hillsides on south side of Joplin are stabilized/vegetated. Wattles and silt fence along north side have become incorporated into road shoulder, removal would cause significant disturbance. Agreed with PW Inspector Gary that if a problem arises, the treatment plant facility crews will take care of it. No further ESC inspections required. ESC permit finaled.
General Inspection7/15/20207/15/20207/21/2020 CANC
DetailsAndy J. Long
General Inspection6/30/20206/30/20207/2/2020 CANC
DetailsAndy J. Long
General Inspection6/15/20206/15/20206/19/2020 CANC
DetailsAndy J. Long
General Inspection5/29/20205/29/20206/5/2020 CANC
DetailsAndy J. Long
General Inspection5/13/20205/14/20205/21/2020PPASS
DetailsAndy J. Long
General Inspection5/6/20205/6/20205/13/2020PCANC
DetailsAndy J. Long
check on issues around the storage unit place (may not be related to this project)
General Inspection4/22/20204/22/20204/23/2020 CANC
DetailsAndy J. Long
General Inspection4/7/20204/7/20204/7/2020 CANC
DetailsAndy J. Long
General Inspection3/23/20203/23/20203/23/2020 CANC
DetailsAndy J. Long
General Inspection3/6/20203/6/20203/6/2020 PASS
DetailsMichael Zawacki
Will continue to monitor revegetation.
General Inspection2/20/20202/20/20202/20/2020 PEND
DetailsAndy J. Long
revegetation monitoring
General Inspection2/5/20202/5/20202/6/2020 CANC
DetailsAndy J. Long
General Inspection1/21/20201/21/20201/22/2020 CANC
DetailsAndy J. Long
General Inspection1/6/20201/6/20201/6/2020 CANC
DetailsAndy J. Long
General Inspection12/20/201912/20/201912/20/2019 CANC
DetailsAndy J. Long
General Inspection12/5/201912/5/201912/5/2019 CANC
DetailsAndy J. Long
General Inspection11/20/201911/20/201911/20/2019 CANC
DetailsAndy J. Long
General Inspection11/5/201911/5/201911/6/2019 CANC
DetailsMichael Zawacki
General Inspection10/21/201910/21/201910/21/2019 CANC
DetailsAndy J. Long
General Inspection10/4/201910/4/201910/4/2019 CANC
DetailsAndy J. Long
General Inspection9/19/20199/19/20199/20/2019 CANC
DetailsMichael Zawacki
General Inspection9/4/20199/4/20199/4/2019 CANC
DetailsAndy J. Long
General Inspection8/20/20198/20/20198/20/2019 PEND
DetailsMichael Zawacki
Talked to public works inspector 8-19. Pavement has failed and will be redone.
Site Final8/2/20198/5/20198/5/2019ANR
DetailsAndy J. Long
Will continue to monitor revegetation. No corrections. Wattle and silt fence are still installed between Joplin and Thurmna Drain.
General Inspection8/2/20198/2/20198/2/2019 CANC
DetailsAndy J. Long
rescheduled for site final
General Inspection7/18/20197/18/20197/18/2019 CANC
DetailsMichael Zawacki
General Inspection7/3/20197/3/20197/5/2019 CANC
DetailsAndy J. Long
General Inspection6/18/20196/18/20196/18/2019 PASS
DetailsMichael Zawacki
BMPs still installed. Good regrowth on hillside, no issues at site.
General Inspection6/3/20196/3/20196/3/2019 PASS
DetailsMichael Zawacki
Good new vegetation growth, everything is stable. Silt fence and no bio-degradable BMPs will need to be removed.
General Inspection5/13/20195/13/20195/13/2019 CANC
DetailsMichael Zawacki
General Inspection4/26/20194/26/20194/26/2019 CANC
DetailsMichael Zawacki
General Inspection4/11/20194/11/20194/11/2019 CANC
DetailsAndy J. Long
General Inspection3/22/20193/27/20193/27/2019ACANC
DetailsAndy J. Long
General Inspection3/22/20193/22/20193/22/2019 CANC
DetailsAndy J. Long
General Inspection3/7/20193/7/20193/7/2019 PASS
DetailsMichael Zawacki
Silt fence and wattle still around replaced culvert. Wattles still around area of old construction entrance. Grass starting to grow on hillside protected wth blanket. BMPs will need to be removed eventually.
General Inspection2/15/20192/15/20192/15/2019 CANC
DetailsAndy J. Long
General Inspection1/30/20191/30/20191/30/2019 PASS
DetailsMichael Zawacki
BMPs still in place, stabalization under way.
General Inspection12/27/201812/27/201812/27/2018 CANC
DetailsMichael Zawacki
General Inspection12/12/201812/12/201812/12/2018PPASS
DetailsMichael Zawacki
All work complete, BMPs still installed.
General Inspection10/24/201810/24/201810/24/2018PPASS
DetailsAndy J. Long
Construction complete. Some temporary wattles are still installed around creek/canal crossings. Will continue to monitor the disturbed section of hillside next to Joplin road that has ECBs installed. ECBs are installed in correct direction and are stapled and staked to slope.
General Inspection9/28/20189/28/20189/28/2018PPASS
DetailsMichael Zawacki
Sewer line work complete. IMC on site prepping road for paving, new wattles installed where needed. Old sewer hasn't been filled yet.
General Inspection9/19/20189/19/20189/19/2018PPASS
DetailsMichael Zawacki
Last section of trunk being placed. Bypass is on. Paving is planned to begin next week, so is filling of old trunk. Stockpile will be used by sewer plant to build new road.
General Inspection9/4/20189/4/20189/4/2018PPASS
DetailsMichael Zawacki
Still dewatering trenches, no turbid discharge. Staging area has water applied, no dust. Stockpiles still on site. BMPs along road, only water is from dust control. Expected time to paving is four weeks.
General Inspection8/15/20188/16/20188/15/2018APASS
DetailsMichael Zawacki
Creeks and ditch clean. BMPs are along road where dust control runoff may enter watereays. Creek culvert is completed. Still minor dewatering. Pumps are in place to soon bypass section of sewer.
General Inspection7/23/20188/3/20188/2/2018APASS
DetailsMichael Zawacki
Wattle has been installed in requested areas. Currentli installing new culvert for canal. Water is being pumped around jobsite, very clean.
Conference7/19/20187/23/20187/23/2018APASS
DetailsMichael Zawacki
Site walkthrough with foreman.
Water leaving site was 6.5 NTU, water entering was 4.5 NTU. No plumes or turbidity observed while on site. Few area where new BMPs were requested, ditch crossing and roadside where there was some signs of rilling and previous runoff. Scheduled follow up inspection for 8-3.
General Inspection7/19/20187/19/20187/19/2018PPASS
DetailsMichael Zawacki
Trunk line is moving east down Joplin. Dewatering still active and discharge clear. Water truck on site keeping staging and work area dust free. Excavated fill is being brought to original work area for storage.
General Inspection6/21/20186/25/20186/25/2018APASS
DetailsMichael Zawacki
Trunk line is nearly to Joplin. Well points installed along Joplin, not yet pumping. Materials and storage now on road. Water truck on site. No runoff or turbid discharge.
General Inspection6/12/20186/13/20186/13/2018APASS
DetailsMichael Zawacki
Currently dewatering back into neighbors pond, level has fallen about 3 feet. Saw a plume in canal that only lasted a few minutes, unable to determine orgin. Well points are installed going down road, no pumping yet. Old silt fence was left behind and is still working. No ESC issues.
General Inspection5/30/20185/30/20185/30/2018PPART
DetailsMichael Zawacki
Water at outlet was reading 50-150 NTU depending which side of outlet was tested, visible plume. Water below last hose was 10.5 NTU. Hoses were directed for overland flow while I was on site, no way to know for sure how long there was a high turbidity dfischarge. Corrective actions were taken and discharge was clearing up while on site.
General Inspection5/16/20185/16/20185/16/2018PPASS
DetailsMichael Zawacki
Site inspection and dewatering check.
Checked water coming in at property boundry,13.7 ntu, water leaving site measured 18.2 NTU. Dewatering operation working well. Canal is currently diverted as trunk goes through main channel, upon completion it will be redirected back into main channel.
No ESC issues at site.
General Inspection4/27/20184/30/20185/1/2018APASS
DetailsMichael Zawacki
No turbid discharges fromn any of the well points. Excavation is down to main trunk line on north side of project. Site is free from issues.
General Inspection4/3/20184/12/20184/12/2018APASS
DetailsMichael Zawacki
Checked on dewatering operation. Many operating well points throughout project. Water entering site measured at 9.82 and exits at 8.91 ntu. Dishcharge points are 7.79 and 0 .70 ntu.
Site Preparation4/2/20184/3/20184/3/2018APASS
DetailsAndy J. Long
Site preparation inspection and walk through conducted at 11 AM. Meeting with Kevin w/ Whitaker Construction, Public Works Inspector Gary Cooper, and the ESC Division (Long & Zawacki)

City of Boise ESC Permit sign posted at entrance on Joplin. Heavy duty construction rock entrance has been ordered and will be installed before end of week. A silt fence perimeter was installed on the east side of the site entrance to protect Thurman MIll from any stormwater sheet flow from site. Fence is properly trenched in.

Thurman Mill ditch & drain channel was rerouted prior to irrigation water release. The bank topsoil of old ditch was preserved and spread along the banks of the new channel and should regrow. Water is now passing through the ditch as of today.

2 well points have been installed and are now dewatering. The high flow pump is deep (25ft) and was discharging clear water, an energy dissipator fabric was put on end of hose and hose is in grassy drainage ditch. 2nd pump was low flow and land applying turbid water to infiltrate. An additional berm to prevent sheet flow to the ditch leading to Thurman Mill was requested and installed during the inspection.

Turbidity samples were taken upstream from discharge point and ditch connection in Thurman Mill reading 31 NTU. Sample in ditch where high flow pump hose was discharging was 7 NTU, and the water downstream in Thurman Canal after the discharges joining was 26 NTU.

Approved for construction. Initial BMPs installed. Will check back after more dewatering wells are installed and construction entrance. Notified RP about fugitive dust control requirements.