INSP-Sprinkler Rough-in | 8/11/2020 | 8/12/2020 | 8/12/2020 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for remaining areas on levels 2 through 5 complete, areas inspected approevd for cover.
Tony Cetani is the contact. This RTC is for the hotel corridors levels 2-5. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 8/11/2020 | 8/12/2020 | 8/12/2020 | P | PART |
Jim Page
|
|
|
Hydrostatic test for levels 2 through 5 witnessed, no pressure loss observed at riser provided gauges.
Tony Cetani is the contact. This hydro is for the 5th floor. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 8/6/2020 | 8/11/2020 | 8/11/2020 | P | CANC |
Jim Page
|
|
|
Tony Cetani is the contact. This hydro is for floors 2-5. Thank you for your hard work! Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in | 8/6/2020 | 8/7/2020 | 8/7/2020 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for elevator lobbies 2 through 7 complete, elevator lobbies 2 through 7 approved for cover.
Jon Beazer is the contact. This RTC is for the Elevator Lobbies floors 2-7. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 7/17/2020 | 7/20/2020 | 7/20/2020 | A | PART |
Jim Page
|
|
|
Hydrostatic test for level 1 wet system witnessed, no pressure loss observed at riser provided gauge.
Tony Cetani is the contact. This will be for the 1st floor Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 7/17/2020 | 7/20/2020 | 7/20/2020 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for level 1 hardlids complete, as well as grid area in kitchen and offices behind reception area, areas inspected approved for cover.
completeTony Cetani is the contact. This will be for the 1st floor Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 7/15/2020 | 7/16/2020 | 7/16/2020 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for linen chute piping/heads complete, approved for cover.
Tony Cetani is the contact. Thanks! (: Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 7/14/2020 | 7/15/2020 | 7/15/2020 | P | FAIL |
Jim Page
|
|
|
Wrong permit requested.
Bryan Collins is the contact. Thanks so much! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 7/13/2020 | 7/15/2020 | 7/14/2020 | A | CANC |
Jim Page
|
|
|
Tony Cetani is the contact. This RTC is for the Linen Shoots. Thank you for your hard work! Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in | 6/25/2020 | 6/26/2020 | 6/26/2020 | A | PASS |
Troy Cobbley
|
|
|
Piping in the 7th floor resident rooms, that is above the soffits, is ok for cover. Also one pendant in the soffit in the west side common corridor. Tony adjusted some of the hangers while I was there.
Tony Cetani is the contact and this inspection will be for the 7th floor. Thanks so much!! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 6/8/2020 | 6/9/2020 | 6/9/2020 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for hardlids in rooms on level 7 compete, hardlids in rooms on level 7 approved for cover. Room drop down ceilings to be inspected after install.
Tony Cetani is the contact. This inspection is for the 7th floor Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 5/26/2020 | 5/27/2020 | 5/27/2020 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for lowered ceilings in suites on level 6 complete, lowered ceilings in suites on level 6 approved for cover.
Tony Cetani is the contact(: Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 5/15/2020 | 5/18/2020 | 5/18/2020 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for lowered ceilings in suites on level 5 complete, lowered ceilings in suites on level 5 approved for cover.
Tony Cetani is the contact. This RTC is for the 5th floor only. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 5/11/2020 | 5/12/2020 | 5/12/2020 | A | PART |
Jim Page
|
|
|
Rough to cover inbspection for pool area and pool mech room complete, area inspected approved for cover.
Tony Cetani is the contact, the inspection is for the first floor. Thanks so much! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 5/6/2020 | 5/8/2020 | 5/8/2020 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for lowered ceilings in suites on level 4 complete, lowered ceilings in suites on level 4 approved for cover.
Tony Cetani is the contact. The inspection will be floor to floor, in the elevator shaft Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 5/6/2020 | 5/7/2020 | 5/6/2020 | A | CANC |
Jim Page
|
|
|
Tony Cetani is the contact. The inspection will be floor to floor, in the elevator shaft Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in | 4/28/2020 | 4/29/2020 | 4/29/2020 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping installed in floor joist cavity on level 6 complete, piping located in floor joist cavity on level 6 approved for cover, a follow up cover inspection will be required for piping above lowered ceilings. Brackets to be added in discussed locations.
Tony Cetani is the contact. Have a great day! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 4/17/2020 | 4/17/2020 | 4/17/2020 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for level 1 lobby restrooms, level 2 and level 3 room lowered ceilings is complete, areas inspected approved for cover.
Jon Beazer is the contact. 1st floor bathroom, 2nd and 3rd floor soffits Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 4/9/2020 | 4/10/2020 | 4/10/2020 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping installed in floor joist cavity on level 5 complete, piping located in floor joist cavity on level 5 approved for cover, a follow up cover inspection will be required for piping above lowered ceilings.
Jon Beazer is the contact as well as Tony Cetani ###-####. The inspection will be for the fifth floor. Thanks (: Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 4/9/2020 | 4/9/2020 | 4/9/2020 | P | CANC |
Jim Page
|
|
|
Rescheduled to coincide with ESI inspection times, inspection request moved to 10APR2020 AM time block, this request is cancelled.
Jon Beazer is the contact as well as Tony Cetani ###-####. The inspection will be for the fifth floor. Thanks (: Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 3/30/2020 | 3/31/2020 | 4/1/2020 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping installed in floor joist cavity on level 4 complete, piping located in floor joist cavity on level 4 approved for cover, a follow up cover inspection will be required for piping above lowered ceilings.
Tony Cetani is the contact. This rough-in is for the 4th floor hotel. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 3/16/2020 | 3/17/2020 | 3/17/2020 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping installed in floor joist cavity on levels 2 and 3 complete, piping located in floor joist cavity on levels 2 and 3 approved for cover, a follow up cover inspection will be required for piping above lowered ceilings.
Tony Cetani is the contact. The inspections are for the 2nd and 3rd floor. The inspector asks that it''ll be in the PM. Thanks! (: Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 3/13/2020 | 3/16/2020 | 3/16/2020 | P | PART |
Jim Page
|
|
|
Final fire sprinkler inspection for TCO phase 1 complete.
Tony Cetani is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 3/13/2020 | 3/16/2020 | 3/16/2020 | A | DONE |
Jim Page
|
|
|
24 hour air test for newly installed dry pipe valves, trim and new piping to split the systems has been witnessed, no ressure loss observed.
Tony Cetani is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 3/13/2020 | 3/13/2020 | 3/13/2020 | P | PART |
Jim Page
|
|
|
24 hour air test started at 0930 with 41 PSI all systems.
Tony Cetani is the contact. This is to be a 24 hour air test. Thank you for the hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 3/5/2020 | 3/6/2020 | 3/6/2020 | A | FAIL |
Jim Page
|
|
|
Trip test time for level 1dry system with 2 open orifices was 1 minute and 2 seconds, level 6 dry system trip time was 1 minute and 12 seconds, per NFPA13, section 7.2.3.6.1, ordinary hazard with 2 open orifices trip time is required to be 50 seconds or less.
Tony Cetani is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 3/5/2020 | 3/5/2020 | 3/5/2020 | A | PART |
Jim Page
|
|
|
Rough in inspection for TCO phase 1 fire sprinkler piping is complete.
|
INSP-Sprinkler Rough-in/Hydro | 3/5/2020 | 3/5/2020 | 3/5/2020 | P | DONE |
Jim Page
|
|
|
24 hour air test is complete.
|
INSP-Final Inspection | 3/5/2020 | 3/5/2020 | 3/5/2020 | P | FAIL |
Jim Page
|
|
|
Temp heat in riser stairwell was not operational, gas was shut off, plastic sheeting does not cover entire opening, 40 degrees was not maintained as discussed, provide adequate freeze protection as discussed.
Tony Cetani is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 3/2/2020 | 3/4/2020 | 3/4/2020 | P | DONE |
Jim Page
|
|
|
Fire pump commissioning complete.
Tony Cetani is the contact for this inspection. He is requesting a fire pump start up. He would like it at the end of day if possible. We appreciate your help. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 3/4/2020 | 3/4/2020 | 3/4/2020 | P | PART |
Jim Page
|
|
|
24 hour air test started at 12PM with 41 PSI on all dry systems.
|
INSP-Conference | 3/4/2020 | 3/4/2020 | 3/4/2020 | P | CANC |
Jim Page
|
|
|
Tony Cetani is the contact, this inspection is for a 24hr air test. Thanks for all the hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 3/3/2020 | 3/3/2020 | 3/3/2020 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for dry systems 2 thru 6 witnessed, no pressure loss observed. Hydrostatic test for parking garage dry systems complete.
Tony Cetani requesting a Hydro. ###-####
Thank you Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 2/26/2020 | 2/27/2020 | 2/27/2020 | P | PART |
Jim Page
|
|
|
Hydrostatic tests for 1st floor garage, Precast stair tower standpipe and the Northeast stair tower standpipe have been witnessed, no pressure loss observed.
Tony Cetani will be the contact. he is needing a hydro first floor garage and Precast Stairs. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 2/19/2020 | 2/21/2020 | 2/20/2020 | A | CANC |
Jim Page
|
|
|
Tony is the contact. He is wanting a Fire Pump Start Up done. Thanks for all you do! Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Conference | 2/18/2020 | 2/18/2020 | 2/18/2020 | P | DONE |
Jim Page
|
|
|
Fire conference is complete.
Tony Cetani is the contact for this consultation. He is requesting an AM appointment today if possible. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 1/27/2020 | 1/27/2020 | 1/27/2020 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for overehad fire sprinkler piping located above level 1 parking garage hardlids complete, parking garage level 1 hardlids approved for cover. Rough to cover inspection for level 1 overhead fire sprinkler piping above hardlids on exterior canopy complete, exterior canopy with fire sprinkler piping approved for cover.
Tony Cetani is requesting a Rough to Cover on 1st Floor Dry Pendant Area in Garage. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Conference | 1/6/2020 | 1/6/2020 | 1/6/2020 | P | DONE |
Jim Page
|
|
|
Fire conference complete, discussed small changes to fire sprinkler main in parking garage routing by exit doors, main was shown directly in front of exit doors, minor changes to be made to get main farther way from doorway entry. Changes will be notated on the as-builts for items discussed today.
Tony Phone #: ###-####
|
INSP-Sprinkler Rough-in | 1/6/2020 | 1/6/2020 | 1/6/2020 | P | CANC |
Jim Page
|
|
|
Request was for a conference, this request is cancelled.
Tony Phone #: ###-####
|
INSP-Sprinkler Rough-in | 11/5/2019 | 11/6/2019 | 11/6/2019 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for mock up room 223 complete. Fire sprinkler plans have to be re-submitted due to required changes, will verify pipe sizing for room 223 after redesign is approved, room 223 approved for cover at contractors discretion, if pipe sizing does not match city approved drawings then corrections to piping in room 223 will be required.
Tony Cetani is the field contact. RTC is for the second floor. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 9/26/2019 | 9/27/2019 | 9/27/2019 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for undergound supply and remote FDC piping complete, approved for cover.
Jeff Chaney is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|