General Inspection | 11/8/2018 | 11/8/2018 | 11/8/2018 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 11/8/2018 | 11/8/2018 | 11/8/2018 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 10/24/2018 | 10/24/2018 | 10/24/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/9/2018 | 10/9/2018 | 10/9/2018 | | PASS |
Michael Zawacki
|
|
|
OK to final when building permit closed.
|
General Inspection | 9/24/2018 | 9/24/2018 | 9/24/2018 | | PASS |
Michael Zawacki
|
|
|
Working on interior. Lot has been landscaped and is stable.
|
General Inspection | 9/7/2018 | 9/7/2018 | 9/7/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/23/2018 | 8/23/2018 | 8/23/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/8/2018 | 8/8/2018 | 8/9/2018 | | PASS |
Michael Zawacki
|
|
|
Work is on interior. Yard is all landscaped and stable.
|
General Inspection | 7/24/2018 | 7/24/2018 | 7/25/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/9/2018 | 7/9/2018 | 7/10/2018 | | PASS |
Michael Zawacki
|
|
|
Yard is landscaped, site stable. Workers finishing up exterior, gutters installed.
|
General Inspection | 6/22/2018 | 6/22/2018 | 6/22/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/7/2018 | 6/7/2018 | 6/7/2018 | | PASS |
Michael Zawacki
|
|
|
Lot stable, workers are doing interior.
|
Random Inspection | 5/23/2018 | 5/23/2018 | 5/23/2018 | P | PASS |
Michael Zawacki
|
|
|
Exterior work nearly complete, lot is landscaped.
|
General Inspection | 5/9/2018 | 5/9/2018 | 5/9/2018 | | PASS |
Andy J. Long
|
|
|
WIP on front yard landscaping and driveway installation. No corrections requested.
|
General Inspection | 4/24/2018 | 4/24/2018 | 4/24/2018 | | PASS |
Michael Zawacki
|
|
|
WIP on interior. No new exterior work or ground disturbances.
|
General Inspection | 4/9/2018 | 4/9/2018 | 4/9/2018 | | PASS |
Michael Zawacki
|
|
|
WIP. Some rocks and gravel on sidewalk in front of home. Some runoff is starting to overtop wall in back.
|
General Inspection | 3/23/2018 | 3/23/2018 | 3/23/2018 | | PASS |
Michael Zawacki
|
|
|
Inspected 3-22. Working on interior. Lot is not stabalized and is contained to site.
|
General Inspection | 3/8/2018 | 3/8/2018 | 3/8/2018 | P | PASS |
Michael Zawacki
|
|
|
Exterior work about complete. No erosion or sediment issues.
|
General Inspection | 3/7/2018 | 3/7/2018 | 3/7/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/20/2018 | 2/20/2018 | 2/21/2018 | | PASS |
Michael Zawacki
|
|
|
Rock wall complete. Working on stucco, lots has fallen on lot.
|
Complaint Inspection | 2/5/2018 | 2/5/2018 | 2/5/2018 | P | PART |
Andy J. Long
|
|
|
Trash complaint received Friday 2/2 pm
- trash has been picked up at both sites.
Need to sweep sidewalks in front of both homes. No muddy trackout or discharges.
|
General Inspection | 1/24/2018 | 1/24/2018 | 1/24/2018 | | FAIL |
Andy J. Long
|
|
|
pick up uncontained trash in front of house during windy season
No trackout or discahrges observed
Verbal correction request to RP to provide dumpster or haul away waste.
|
General Inspection | 1/9/2018 | 1/9/2018 | 1/9/2018 | | PASS |
Michael Zawacki
|
|
|
WIP. Some trash boxes out front, some dirt on sidewalk.
|
General Inspection | 12/25/2017 | 12/25/2017 | 12/27/2017 | | PASS |
Michael Zawacki
|
|
|
WIP on interior.
|
General Inspection | 12/8/2017 | 12/8/2017 | 12/8/2017 | | PART |
Michael Zawacki
|
|
|
Perimeter rock wall installed and area mostly stabalized. Some trash out front and some dirt on sidewalk.
|
General Inspection | 11/23/2017 | 11/23/2017 | 11/27/2017 | | PASS |
Andy J. Long
|
|
|
SFH is framed, site retaining walls installed. WIP on interior. No trackout or uncontained trash onsite.
|
General Inspection | 11/8/2017 | 11/8/2017 | 11/8/2017 | | PASS |
Michael Zawacki
|
|
|
Landscaping rock in place, perimeter controlled. Working on ionterior of house. Can remove silt fence from back.
|
General Inspection | 10/24/2017 | 10/24/2017 | 10/26/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/5/2017 | 10/9/2017 | 10/10/2017 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/3/2017 | 10/3/2017 | 10/5/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/18/2017 | 9/18/2017 | 9/19/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/1/2017 | 9/1/2017 | 9/5/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/17/2017 | 8/17/2017 | 8/22/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/2/2017 | 8/2/2017 | 8/2/2017 | P | PASS |
Andy J. Long
|
|
|
Foundation and frame complete. Work remains on exterior and interior and site is not landscaped. Fence and vegetataion as well as grading has prevent sediment runoff to downhill neighbors. No loose trash or spills observed. Posted a new ESC permit sign
|
General Inspection | 7/20/2017 | 7/20/2017 | 7/21/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/5/2017 | 7/5/2017 | 7/7/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/20/2017 | 6/20/2017 | 6/23/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/5/2017 | 6/5/2017 | 6/5/2017 | | PART |
Melissa Jannusch
|
|
|
WIP on foundation. Silt fence needs repairs. Concrete washout is being used. No trash or trackout.
|
General Inspection | 5/19/2017 | 5/19/2017 | 5/19/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/4/2017 | 5/4/2017 | 5/5/2017 | | PASS |
Melissa Jannusch
|
|
|
Excavation on adjacent lot has begun.
|
General Inspection | 4/19/2017 | 4/19/2017 | 4/19/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/4/2017 | 4/4/2017 | 4/5/2017 | | PASS |
Melissa Jannusch
|
|
|
Silt fence has been moved for piping work. RP will replace silt fence one work is completed. Posted new sign. Project ok.
|
General Inspection | 3/20/2017 | 3/20/2017 | 3/22/2017 | | PASS |
Melissa Jannusch
|
|
|
WIP. No ESC issues observed.
|
General Inspection | 3/3/2017 | 3/3/2017 | 3/6/2017 | | PASS |
Melissa Jannusch
|
|
|
|
General Inspection | 2/16/2017 | 2/16/2017 | 2/17/2017 | | PASS |
Melissa Jannusch
|
|
|
Correction requested: preform minor maintenance to silt fence. Sweep up sidewalk. Spoke with Jim (RP) on site.
|
General Inspection | 2/1/2017 | 2/1/2017 | 2/6/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/17/2017 | 1/17/2017 | 1/19/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/30/2016 | 12/30/2016 | 12/30/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/15/2016 | 12/15/2016 | 12/19/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/30/2016 | 11/30/2016 | 12/1/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/15/2016 | 11/15/2016 | 11/15/2016 | P | PASS |
Andy J. Long
|
|
|
WIP on framing and roof. Retaining walls have been installed. No erosion or sediment leaving bottom of site. No vehicle trackout or discharges to street. NO corrections at this time.
|
General Inspection | 11/4/2016 | 11/8/2016 | 11/15/2016 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/2/2016 | 11/2/2016 | 11/4/2016 | | CANC |
Andy J. Long
|
|
|
rescheduled 11/8
|
General Inspection | 10/18/2016 | 10/18/2016 | 10/18/2016 | | PEND |
Andy J. Long
|
|
|
|
General Inspection | 10/3/2016 | 10/3/2016 | 10/6/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/16/2016 | 9/16/2016 | 9/16/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 9/1/2016 | 9/1/2016 | 9/2/2016 | | PASS |
Evan Jenkins
|
|
|
WIP Re-veg
|
General Inspection | 8/17/2016 | 8/17/2016 | 8/17/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/2/2016 | 8/2/2016 | 8/2/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 7/18/2016 | 7/18/2016 | 7/18/2016 | | PASS |
Andy J. Long
|
|
|
Foundation work in progress. No discharges or washout occuring in sidewalk/gutter/street. RP/GC on site supervising Approved.
|
General Inspection | 7/1/2016 | 7/1/2016 | 7/1/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/16/2016 | 6/16/2016 | 6/16/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 6/1/2016 | 6/1/2016 | 6/1/2016 | | PASS |
Andy J. Long
|
|
|
Lot has been grubbed. No activity at time of inspection. Permit sign posted, silt fence BMP installed properly.
|
Site Preparation | 5/13/2016 | 5/16/2016 | 5/16/2016 | A | PASS |
Andy J. Long
|
|
|
Jim Phone #: ###-####
RP-GC Jim onsite walk through inspection. Silt fence installed at the bottom of the lot. There are two projects adjacent to each other and will be built simultaneously.
Permit sign posted, silt fence properly installed. Will use leak-proof portable container for the washout phase.
First phase of project is clearing trees and shrubs and installing geo-grid structures for hillside stabilization. Did not request inlet bag. RP stated he will be onsite daily to monitor trackout and sweeping needs. Will provide trash bin for excavation crew.
Approved for construction.
|