Information based on query as of Sunday, May 12, 2024.
Permit Information
Permit NumberESC15-01138
StatusFinaled
Name JAMES GREENWOOD
Site Address 1879 E RIDGECREST DR
Project NameNSFD
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 3,205 sq. ft., two story (main level 1,817 sq. ft., finished basement 1,388 sq. ft.) single family dwelling with 4 bedrooms, 3 and a half bathrooms, approximately 596 sq. ft. of covered patio/porch and a 698 sq. ft. attached garage
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection11/8/201811/8/201811/8/2018 CANC
DetailsMichael Zawacki
DOC - Permit Finaled11/8/201811/8/201811/8/2018PPASS
DetailsMichael Zawacki
General Inspection10/24/201810/24/201810/24/2018 CANC
DetailsAndy J. Long
General Inspection10/9/201810/9/201810/9/2018 PASS
DetailsMichael Zawacki
OK to final when building permit closed.
General Inspection9/24/20189/24/20189/24/2018 PASS
DetailsMichael Zawacki
Working on interior. Lot has been landscaped and is stable.
General Inspection9/7/20189/7/20189/7/2018 CANC
DetailsAndy J. Long
General Inspection8/23/20188/23/20188/23/2018 CANC
DetailsAndy J. Long
General Inspection8/8/20188/8/20188/9/2018 PASS
DetailsMichael Zawacki
Work is on interior. Yard is all landscaped and stable.
General Inspection7/24/20187/24/20187/25/2018 CANC
DetailsAndy J. Long
General Inspection7/9/20187/9/20187/10/2018 PASS
DetailsMichael Zawacki
Yard is landscaped, site stable. Workers finishing up exterior, gutters installed.
General Inspection6/22/20186/22/20186/22/2018 CANC
DetailsAndy J. Long
General Inspection6/7/20186/7/20186/7/2018 PASS
DetailsMichael Zawacki
Lot stable, workers are doing interior.
Random Inspection5/23/20185/23/20185/23/2018PPASS
DetailsMichael Zawacki
Exterior work nearly complete, lot is landscaped.
General Inspection5/9/20185/9/20185/9/2018 PASS
DetailsAndy J. Long
WIP on front yard landscaping and driveway installation. No corrections requested.
General Inspection4/24/20184/24/20184/24/2018 PASS
DetailsMichael Zawacki
WIP on interior. No new exterior work or ground disturbances.
General Inspection4/9/20184/9/20184/9/2018 PASS
DetailsMichael Zawacki
WIP. Some rocks and gravel on sidewalk in front of home. Some runoff is starting to overtop wall in back.
General Inspection3/23/20183/23/20183/23/2018 PASS
DetailsMichael Zawacki
Inspected 3-22. Working on interior. Lot is not stabalized and is contained to site.
General Inspection3/8/20183/8/20183/8/2018PPASS
DetailsMichael Zawacki
Exterior work about complete. No erosion or sediment issues.
General Inspection3/7/20183/7/20183/7/2018 CANC
DetailsAndy J. Long
General Inspection2/20/20182/20/20182/21/2018 PASS
DetailsMichael Zawacki
Rock wall complete. Working on stucco, lots has fallen on lot.
Complaint Inspection2/5/20182/5/20182/5/2018PPART
DetailsAndy J. Long
Trash complaint received Friday 2/2 pm

- trash has been picked up at both sites.

Need to sweep sidewalks in front of both homes. No muddy trackout or discharges.
General Inspection1/24/20181/24/20181/24/2018 FAIL
DetailsAndy J. Long
pick up uncontained trash in front of house during windy season

No trackout or discahrges observed

Verbal correction request to RP to provide dumpster or haul away waste.
General Inspection1/9/20181/9/20181/9/2018 PASS
DetailsMichael Zawacki
WIP. Some trash boxes out front, some dirt on sidewalk.
General Inspection12/25/201712/25/201712/27/2017 PASS
DetailsMichael Zawacki
WIP on interior.
General Inspection12/8/201712/8/201712/8/2017 PART
DetailsMichael Zawacki
Perimeter rock wall installed and area mostly stabalized. Some trash out front and some dirt on sidewalk.
General Inspection11/23/201711/23/201711/27/2017 PASS
DetailsAndy J. Long
SFH is framed, site retaining walls installed. WIP on interior. No trackout or uncontained trash onsite.
General Inspection11/8/201711/8/201711/8/2017 PASS
DetailsMichael Zawacki
Landscaping rock in place, perimeter controlled. Working on ionterior of house. Can remove silt fence from back.
General Inspection10/24/201710/24/201710/26/2017 CANC
DetailsAndy J. Long
General Inspection10/5/201710/9/201710/10/2017PCANC
DetailsAndy J. Long
General Inspection10/3/201710/3/201710/5/2017 CANC
DetailsAndy J. Long
General Inspection9/18/20179/18/20179/19/2017 CANC
DetailsAndy J. Long
General Inspection9/1/20179/1/20179/5/2017 CANC
DetailsAndy J. Long
General Inspection8/17/20178/17/20178/22/2017 CANC
DetailsAndy J. Long
General Inspection8/2/20178/2/20178/2/2017PPASS
DetailsAndy J. Long
Foundation and frame complete. Work remains on exterior and interior and site is not landscaped. Fence and vegetataion as well as grading has prevent sediment runoff to downhill neighbors. No loose trash or spills observed. Posted a new ESC permit sign
General Inspection7/20/20177/20/20177/21/2017 CANC
DetailsAndy J. Long
General Inspection7/5/20177/5/20177/7/2017 CANC
DetailsAndy J. Long
General Inspection6/20/20176/20/20176/23/2017 CANC
DetailsAndy J. Long
General Inspection6/5/20176/5/20176/5/2017 PART
DetailsMelissa Jannusch
WIP on foundation. Silt fence needs repairs. Concrete washout is being used. No trash or trackout.
General Inspection5/19/20175/19/20175/19/2017 CANC
DetailsAndy J. Long
General Inspection5/4/20175/4/20175/5/2017 PASS
DetailsMelissa Jannusch
Excavation on adjacent lot has begun.
General Inspection4/19/20174/19/20174/19/2017 CANC
DetailsAndy J. Long
General Inspection4/4/20174/4/20174/5/2017 PASS
DetailsMelissa Jannusch
Silt fence has been moved for piping work. RP will replace silt fence one work is completed. Posted new sign. Project ok.
General Inspection3/20/20173/20/20173/22/2017 PASS
DetailsMelissa Jannusch
WIP. No ESC issues observed.
General Inspection3/3/20173/3/20173/6/2017 PASS
DetailsMelissa Jannusch
General Inspection2/16/20172/16/20172/17/2017 PASS
DetailsMelissa Jannusch
Correction requested: preform minor maintenance to silt fence. Sweep up sidewalk.
Spoke with Jim (RP) on site.
General Inspection2/1/20172/1/20172/6/2017 CANC
DetailsAndy J. Long
General Inspection1/17/20171/17/20171/19/2017 CANC
DetailsAndy J. Long
General Inspection12/30/201612/30/201612/30/2016 CANC
DetailsAndy J. Long
General Inspection12/15/201612/15/201612/19/2016 CANC
DetailsAndy J. Long
General Inspection11/30/201611/30/201612/1/2016 CANC
DetailsAndy J. Long
General Inspection11/15/201611/15/201611/15/2016PPASS
DetailsAndy J. Long
WIP on framing and roof. Retaining walls have been installed. No erosion or sediment leaving bottom of site. No vehicle trackout or discharges to street. NO corrections at this time.
General Inspection11/4/201611/8/201611/15/2016PCANC
DetailsAndy J. Long
General Inspection11/2/201611/2/201611/4/2016 CANC
DetailsAndy J. Long
rescheduled 11/8
General Inspection10/18/201610/18/201610/18/2016 PEND
DetailsAndy J. Long
General Inspection10/3/201610/3/201610/6/2016 CANC
DetailsAndy J. Long
General Inspection9/16/20169/16/20169/16/2016 PASS
DetailsAndy J. Long
General Inspection9/1/20169/1/20169/2/2016 PASS
DetailsEvan Jenkins
WIP
Re-veg
General Inspection8/17/20168/17/20168/17/2016 PASS
DetailsAndy J. Long
General Inspection8/2/20168/2/20168/2/2016 PASS
DetailsAndy J. Long
General Inspection7/18/20167/18/20167/18/2016 PASS
DetailsAndy J. Long
Foundation work in progress. No discharges or washout occuring in sidewalk/gutter/street. RP/GC on site supervising Approved.
General Inspection7/1/20167/1/20167/1/2016 CANC
DetailsAndy J. Long
General Inspection6/16/20166/16/20166/16/2016 PASS
DetailsEvan Jenkins
General Inspection6/1/20166/1/20166/1/2016 PASS
DetailsAndy J. Long
Lot has been grubbed. No activity at time of inspection. Permit sign posted, silt fence BMP installed properly.
Site Preparation5/13/20165/16/20165/16/2016APASS
DetailsAndy J. Long
Jim Phone #: ###-####

RP-GC Jim onsite walk through inspection. Silt fence installed at the bottom of the lot. There are two projects adjacent to each other and will be built simultaneously.

Permit sign posted, silt fence properly installed. Will use leak-proof portable container for the washout phase.

First phase of project is clearing trees and shrubs and installing geo-grid structures for hillside stabilization. Did not request inlet bag. RP stated he will be onsite daily to monitor trackout and sweeping needs. Will provide trash bin for excavation crew.

Approved for construction.